US$419.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GA/T 651-2021: General procedures and requirements for the construction of public security traffic command system Status: Valid GA/T 651: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GA/T 651-2021 | English | 419 |
Add to Cart
|
4 days [Need to translate]
|
General procedures and requirements for the construction of public security traffic command system
| Valid |
GA/T 651-2021
|
GA/T 651-2014 | English | 559 |
Add to Cart
|
3 days [Need to translate]
|
General procedures and requirements for construction of traffic command system
| Obsolete |
GA/T 651-2014
|
GA/T 651-2006 | English | 519 |
Add to Cart
|
3 days [Need to translate]
|
General program and demand for the construction project of public security traffic command system
| Obsolete |
GA/T 651-2006
|
PDF similar to GA/T 651-2021
Standard similar to GA/T 651-2021 CJJ 36 GB 50763 CJJ 1 GA/T 652
Basic data Standard ID | GA/T 651-2021 (GA/T651-2021) | Description (Translated English) | General procedures and requirements for the construction of public security traffic command system | Sector / Industry | Public Security (Police) Industry Standard (Recommended) | Classification of Chinese Standard | P51 | Word Count Estimation | 18,115 | Issuing agency(ies) | Ministry of Public Security |
GA/T 651-2021: General procedures and requirements for the construction of public security traffic command system ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
General procedures and requirements for the construction of public security traffic command system
ICS 93.080.99
CCSP51
Public Safety Industry Standards of the People's Republic of China
Replace GA/T 651-2014
General public security traffic command system engineering construction
Procedures and requirements
Released on 2021-07-20
2022-01-01 implementation
Issued by the Ministry of Public Security of the People's Republic of China
Table of contents
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Basic rules 1
5 Project preparation stage 2
6 Construction preparation stage 3
7 Project implementation stage 5
8 Project acceptance stage 6
9 Operational evaluation stage 9
Appendix A (Informative) General Procedure Flow Chart of Public Security Traffic Command System Engineering Construction 10
Appendix B (Informative) Trial Operation Record of Public Security Traffic Command System 11
Reference 12
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
Drafting.
This document replaces GA/T 651-2014 "General Procedures and Requirements for the Construction of Public Security Traffic Command System Engineering", and is consistent with GA/T 651-2014
In comparison, the main technical changes except for editorial changes are as follows.
a) The scope content has been changed (see Chapter 1, Chapter 1 of the.2014 edition);
b) The definition of project management unit has been changed (see 3.2, 3.2 in the.2014 edition);
c) The requirements for the project contracting mode have been added (see 4.2);
d) The requirements of the main stakeholders of the project have been added (see 4.3);
e) The requirements for stage division have been added (see 4.4);
f) The requirements for project establishment are changed (see 5.1, Chapter 5 of the.2014 edition);
g) The requirements of the feasibility study have been changed (see 5.2, 5.2 in the.2014 edition);
h) Deleted the requirements for approval of the project (see 5.3 of the.2014 edition);
i) The requirements of the commissioned design unit for the preliminary design have been changed (see 6.1.1.1, 6.1 of the.2014 edition);
j) The requirements for investigation and survey have been changed (see 6.1.1.3, 6.3 of the.2014 edition);
k) The requirements for review of preliminary design documents have been changed (see 6.1.1.4, 6.4.2 of the.2014 edition);
l) Added the requirement for preliminary design documents to be submitted to the competent authority for approval (see 6.1.1.5);
m) The requirements for preliminary design documents have been changed (see 6.1.2, 6.4.1 of the.2014 edition);
n) The requirements of the commissioned design unit for construction drawing design have been added (see 6.2.1.1);
o) The requirements for design review of construction drawings have been deleted (see 6.5.2 of the.2014 edition);
p) Added requirements for review of construction drawings and design documents (see 6.2.1.2);
q) Added the requirement for construction drawing design documents to be reported to the competent authority for record (see 6.2.1.3);
r) The requirements for construction drawings and design documents have been changed (see 6.2.2, 10 in the.2014 edition);
s) The requirements for determining supervision have been changed (see 6.3, 6.5.1 of the.2014 edition);
t) The requirements for engineering procurement have been changed (see 6.4, Chapter 7 of the.2014 edition);
u) The requirements for project bidding have been added (see 6.4.1.1);
v) Added the requirement for project procurement to be reported to the competent department for record (see 6.4.1.3);
w) The requirements for the award of engineering contracts have been changed (see Chapter 6.5, Chapter 8 of the.2014 edition);
x) Added the requirement for the project contract to be reported to the competent authority for record (see 6.5.2);
y) Added requirements for construction organization design (see 7.1);
z) The requirements for design clarification have been added (see 7.2);
aa) The requirements for detailed design have been added (see 7.3);
bb) The construction requirements are changed (see 7.4, Chapter 9 of the.2014 edition);
cc) The requirements for preliminary acceptance have been changed (see 8.1, 11.2 of the.2014 edition);
dd) The requirements for trial operation have been changed (see 8.2, 11.3 of the.2014 edition);
ee) Deleted the requirements for engineering evaluation (see 12.4 of the.2014 edition);
ff) The requirements for acceptance documents have been changed (see 8.3.2.3, 12.5.3 of the.2014 edition);
gg) The system requirements have been changed (see 8.4.2, 13.2 in the.2014 edition);
hh) The requirements of the operational evaluation stage have been added (see Chapter 9);
i) The general procedure flowchart for the construction of the public security traffic command system project has been added (see Appendix A);
j) Modified the trial operation record of the public security traffic command system (see Appendix B, see Appendix A of the.2014 edition).
Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents.
This document was proposed and managed by the National Road Traffic Management Standardization Technical Committee (SAC/TC576).
Drafting organizations of this document. Traffic Management Research Institute of Ministry of Public Security, Traffic Management Bureau of Guangdong Provincial Public Security Department, Traffic Management of Nanjing Public Security Bureau
Bureau, Ningbo Municipal Public Security Bureau Traffic Police Department, Tangshan Public Security Traffic Police Detachment, Wuxi Huatong Intelligent Transportation Technology Development Co., Ltd.
The main drafters of this document. Gu Jiayue, Wang Ming, Li Biao, Li Zhilin, Gao Shutao, Qiu Hongtong, Tang Yansheng, Li Xiao, Hu Hui, Niu Hongzhen, Lu Zhenyi,
Zhang Keng, Dong Kaifan, Han Long.
The previous releases of this document and the documents it replaced are as follows.
---First published in.2006 as GA/T 651-2006, first revised in.2014;
---This is the second revision.
General public security traffic command system engineering construction
Procedures and requirements
1 Scope
This document specifies the basic requirements for the construction of the public security traffic command system project and the preparation for project approval, construction preparation, project implementation, project acceptance,
General procedures and requirements for operational evaluation and other stages.
This document is applicable to the construction of the public security traffic command system.
2 Normative references
The content of the following documents constitutes an indispensable clause of this document through normative references in the text. Among them, dated quotations
Only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
This document.
GB/T 19668 (all parts) Information Technology Service Supervision
GB/T 50319 Construction Project Supervision Code
GB/T 50326 Construction Project Management Code
GA/T 515.2 Public Security Traffic Command System Design Specification Part 2.Provincial (Autonomous Region) Public Security Traffic Command System
GA/T 515.3 Design Specification for Public Security Traffic Command System Part 3.Urban Public Security Traffic Command System
GA/T 515.4 Design Specification for Public Security Traffic Command System Part 4.Drawing
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Constructionofpublicsecuritytrafficcommandsystem
A construction project for the construction of the provincial (autonomous region) public security traffic command system or the urban public security traffic command system and its subsystems.
3.2
Project management unit projectmanagementunit
In the public security traffic command system project preparation, construction preparation, project implementation, project acceptance, operation evaluation and other stages, responsible for planning,
A unit that organizes, directs, coordinates, controls, and evaluates management work.
Note. It can be the construction unit itself or other units entrusted by the construction unit to be responsible for planning, organization, command, coordination, control, and evaluation.
4 Basic regulations
4.1 Project Management
The project management unit of the public security traffic command system project (hereinafter referred to as the project) should establish a project management organization in accordance with GB/T 50326
Be responsible for project management.
4.2 Project contracting mode
According to the characteristics of the project's construction period, construction scale, construction content, technical difficulty, etc., design-tender-construction (DBB mode),
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GA/T 651-2021_English be delivered?Answer: Upon your order, we will start to translate GA/T 651-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GA/T 651-2021_English with my colleagues?Answer: Yes. The purchased PDF of GA/T 651-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GA/T 651-2021?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GA/T 651-2021 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|