US$229.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GA/T 527.6-2018: Road traffic signal control mode--Part 6: Control rules for bus signal priority at intersections Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GA/T 527.6-2018 | English | 229 |
Add to Cart
|
3 days [Need to translate]
|
Road traffic signal control mode--Part 6: Control rules for bus signal priority at intersections
| Valid |
GA/T 527.6-2018
|
PDF similar to GA/T 527.6-2018
Basic data Standard ID | GA/T 527.6-2018 (GA/T527.6-2018) | Description (Translated English) | Road traffic signal control mode--Part 6: Control rules for bus signal priority at intersections | Sector / Industry | Public Security (Police) Industry Standard (Recommended) | Classification of Chinese Standard | R87 | Classification of International Standard | 93.080.30 | Word Count Estimation | 10,148 | Date of Issue | 2018-03-26 | Date of Implementation | 2018-03-26 | Issuing agency(ies) | Ministry of Public Security |
GA/T 527.6-2018: Road traffic signal control mode--Part 6: Control rules for bus signal priority at intersections ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Road traffic signal control mode--Part 6. Control rules for bus signal priority at intersections
ICS 93.080.30
R87
People's Republic of China Public Safety Industry Standard
Road traffic signal control method
Part 6. Priority control rules for bus intersections
Part 6. Controlrulesforbussignalpriorityatintersections
Published on.2018-03-26
Implementation of.2018-03-26
Ministry of Public Security
Content
Foreword III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 General 1
5 Implementation conditions 1
6 Response 2
7 Control Strategy 2
8 Control method 3
9 Control Scheme 3
10 signal timing requirements 4
Foreword
GA/T 527 "Road Traffic Signal Control Method" is divided into the following sections.
--- Part 1. General technical conditions;
--- Part 2. Accessibility status and control benefit evaluation indicators and methods;
--- Part 3. Implementation requirements for single-point signal control methods;
--- Part 4. Implementation requirements for trunk line coordination signal control methods;
--- Part 5. Variable guide lane traffic control rules;
--- Part 6. Priority control rules for bus intersections;
--- Part 7. Priority control rules for tram crossings;
--- Part 8. The tidal lane traffic control rules;
--- Part 9. ramp control rules.
This part is part 6 of GA/T 527.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
This part is proposed and managed by the Ministry of Public Security Road Traffic Management Standardization Technical Committee.
This section is responsible for drafting the unit. Traffic Management Science Research Institute of the Ministry of Public Security.
Participated in the drafting of this section. Wuxi Huatong Intelligent Transportation Technology Development Co., Ltd., Qingdao Hisense Network Technology Co., Ltd., South
Jingles Information Technology Co., Ltd.
The main drafters of this section. Xu Ling, Hua Yiyi, Liu Dongbo, He Huaying, Ma Xiaolong, Fu Wentao.
Road traffic signal control method
Part 6. Priority control rules for bus intersections
1 Scope
This part of GA/T 527 specifies the general rules, implementation conditions, response methods, control strategies, and controls for priority traffic control at bus intersections.
Technical requirements such as system, control scheme, and signal timing.
This section applies to the design and application of priority traffic control at bus intersections.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 31418 Road Traffic Signal Control System Terminology
GA/T 527.1 Road traffic signal control methods - Part 1. General technical conditions
3 Terms and definitions
The terms and definitions defined in GB/T 31418 and GA/T 527.1 apply to this document.
4 General
To implement priority access control at bus intersections, the following principles need to be considered.
a) Traffic jams at intersections and other motor vehicles, non-motor vehicles and pedestrians should be avoided to ensure safe and orderly traffic;
b) It should be combined with other motor vehicles, non-motor vehicles and pedestrians according to the bus mode, operation plan and traffic flow at the intersection.
In other cases, determine the priority control scheme of the intersection signal to improve the traffic efficiency of the bus;
c) Consideration should be given to the consideration of the access control of other motor vehicles, non-motor vehicles, pedestrians, etc. at the intersection, minimizing the
The impact of non-motor vehicles, pedestrians, etc.
5 Implementation conditions
5.1 signal setting
There is an intersection for the bus-specific import lanes. When the bus priority control is implemented, the following requirements should be met.
a) If there is an unspecified flow to the bus-specific import lane, special signal lights shall be provided;
b) There is a designated import lane for the bus, when the bus-only import lane and the adjacent motor vehicle entrance lane are not in the direction of travel
When they are consistent, special signal lights should be set;
c) Priority control of the bus signal at the intersection is to insert a dedicated phase response mode, and a dedicated signal light should be set.
5.2 Information Collection
5.2.1 Bus traffic information
The bus traffic status information should be collected in real time, including continuous location information, arrival at a specific point, arrival at the stop line, and departure.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GA/T 527.6-2018_English be delivered?Answer: Upon your order, we will start to translate GA/T 527.6-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GA/T 527.6-2018_English with my colleagues?Answer: Yes. The purchased PDF of GA/T 527.6-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|