US$229.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GA/T 527.4-2018: Road traffic signal control mode--Part 4: Requirements for implementation of coordinated control mode for arterial roads Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GA/T 527.4-2018 | English | 229 |
Add to Cart
|
3 days [Need to translate]
|
Road traffic signal control mode--Part 4: Requirements for implementation of coordinated control mode for arterial roads
| Valid |
GA/T 527.4-2018
|
PDF similar to GA/T 527.4-2018
Basic data Standard ID | GA/T 527.4-2018 (GA/T527.4-2018) | Description (Translated English) | Road traffic signal control mode--Part 4: Requirements for implementation of coordinated control mode for arterial roads | Sector / Industry | Public Security (Police) Industry Standard (Recommended) | Classification of Chinese Standard | R87 | Classification of International Standard | 93.080.30 | Word Count Estimation | 10,188 | Date of Issue | 2018-03-26 | Date of Implementation | 2018-03-26 | Issuing agency(ies) | Ministry of Public Security |
GA/T 527.4-2018: Road traffic signal control mode--Part 4: Requirements for implementation of coordinated control mode for arterial roads ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Road traffic signal control mode--Part 4. Requirements for implementation of coordinated control mode for arterial roads
ICS 93.080.30
R87
People's Republic of China Public Safety Industry Standard
Road traffic signal control method
Part 4. Mainline coordination signal control method
Implementation requirements
Part 4. Requirementsforimplementationofcoordinatedcontrolmode
Published on.2018-03-26
Implementation of.2018-03-26
Ministry of Public Security
Content
Foreword III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Category 1
5 Setting condition 1
6 Implementation Process 2
7 control period division 2
8 Control sub-area determination 2
9 control mode selection 3
10 Control parameter determination 3
11 Control Plan Transition 4
12 Control Plan Evaluation 4
Foreword
GA/T 527 "Road Traffic Signal Control Method" is divided into the following sections.
--- Part 1. General technical conditions;
--- Part 2. Accessibility status and control benefit evaluation indicators and methods;
--- Part 3. Implementation requirements for single-point signal control methods;
--- Part 4. Implementation requirements for trunk line coordination signal control methods;
--- Part 5. Variable guide lane traffic control rules;
--- Part 6. Priority control rules for bus intersections;
--- Part 7. Priority control rules for tram crossings;
--- Part 8. The tidal lane traffic control rules;
--- Part 9. ramp control rules.
This part is the fourth part of GA/T 527.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
This part is proposed and managed by the Ministry of Public Security Road Traffic Management Standardization Technical Committee.
This section is responsible for drafting the unit. Traffic Management Science Research Institute of the Ministry of Public Security.
Participated in the drafting of this section. Guangdong Zhenye Youkong Technology Co., Ltd.
The main drafters of this section. Dai Leilei, Shu Aibing, Liu Chengsheng, He Guangjin, Lin Ke, Xu Gaosong.
Road traffic signal control method
Part 4. Mainline coordination signal control method
Implementation requirements
1 Scope
This part of GA/T 527 specifies the classification, setting conditions, implementation flow, control period division and control of trunk coordination signal control methods.
Sub-area determination, control mode selection, control parameter determination, control scheme transition, and control scheme evaluation.
This section applies to the design and application of trunk line coordination signal control methods.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 31418 Road Traffic Signal Control System Terminology
GA/T 527.1-2015 Road traffic signal control methods - Part 1. General technical conditions
GA/T 527.2 Road traffic signal control methods - Part 2. Assessments and methods
3 Terms and definitions
The following terms and definitions as defined in GB/T 31418, GA/T 527.1-2015 apply to this document.
3.1
Intercept flow control trafficflowmetering
To alleviate over-saturation in a specific area or avoid queuing overflow at the bottleneck intersection, reduce the signal control parameters of several upstream intersections to reduce
Signal control measures to enter a specific area of the vehicle and equalize the queues at each intersection.
4 classification
4.1 According to the control method
According to the coordinated control mode of trunk lines, it is divided into trunk line timing coordination, trunk line induction coordination and trunk line adaptive coordination.
4.2 According to the direction of coordination
According to the direction of trunk coordination, it is divided into one-way coordination and two-way coordination.
4.3 According to the control strategy
According to the coordinated control strategy of the trunk line, it is divided into green wave coordination and interception control.
5 Setting conditions
5.1 Road conditions
To implement trunk coordination signal control, the following road conditions should be met.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GA/T 527.4-2018_English be delivered?Answer: Upon your order, we will start to translate GA/T 527.4-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GA/T 527.4-2018_English with my colleagues?Answer: Yes. The purchased PDF of GA/T 527.4-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|