US$249.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GA 871-2010: Bomb blast suppression bin
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GA 871-2010 | English | 249 |
Add to Cart
|
3 days [Need to translate]
|
Bomb blast suppression bin
| |
GA 871-2010
|
PDF similar to GA 871-2010
Basic data Standard ID | GA 871-2010 (GA871-2010) | Description (Translated English) | Bomb blast suppression bin | Sector / Industry | Public Security (Police) Industry Standard | Classification of Chinese Standard | A94 | Classification of International Standard | 13.340.99 | Word Count Estimation | 7,764 | Date of Issue | 2010-06-02 | Date of Implementation | 2010-07-01 | Quoted Standard | GB 6722-2003 | Issuing agency(ies) | Ministry of Public Security | Summary | This standard specifies the terms and definitions, classification and nomenclature, technical requirements, test methods, inspection rules, packaging, transport and storage of explosion-proof tanks. This standard applies to explosion-proof tanks. |
GA 871-2010: Bomb blast suppression bin---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Bomb blast suppression bin
ICS 13.340.99
A94
People 's Republic of China Public Security Industry Standard
Explosion-proof tank
2010-06-02 release
2010-07-01 Implementation
Issued by the Ministry of Public Security of the People 's Republic of China
Foreword
The technical content of this standard is mandatory.
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed by the Ministry of Public Security Equipment Finance Bureau.
This standard by the Ministry of Public Security Special Police Equipment Standardization Technical Committee.
The drafting of this standard. the Ministry of Public Security special police equipment quality supervision and inspection center, Beijing Anlong United Electronics Co., Ltd., Guangzhou Wei Fu
Technology Development Co., Ltd., Beijing Jin Jingwu high-tech Co., Ltd.
The main drafters of this standard. Wang Chenliang, Wang Tongzhen, Wang Bin, Wang Junling.
Explosion-proof tank
1 Scope
This standard specifies the terms and definitions of explosion proof tanks, classification and naming, technical requirements, test methods, inspection rules, packaging, transportation and
Storage.
This standard applies to explosion-proof tanks.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
Blasting safety regulations GB 6722-2003
3 terms and definitions
The following terms and definitions apply to this document.
3.1
Can inhibit the explosion caused by the explosion of explosions and fragments of the surrounding environment caused by the killing effect, for temporary storage or transport explosion
And other suspicious explosives. Generally include tanks and mobile devices (such as moving wheels or trailers, etc.).
3.2
Trailer trailer
Used to load the explosion-proof tank and fixed connection with the transport.
3.3
Fragmentation fragment
Explosives exploded after the formation or release of solid, liquid killings, such as metal blocks, stones, soil fast, wood chips, water droplets and so on.
3.4
Explosion protection capability anti-explosiveability
Explosion-proof tanks can withstand the ability to explode the explosion, expressed in terms of standard TNT explosion equivalent.
Classification and naming
4.1 Classification
Explosion-proof cans are divided into two types. fixed and trailer.
4.1.1 fixed explosion-proof tank
Fixed at a particular location, no self-distance mobile function, with "G" said.
4.1.2 Trailer type explosion-proof tank
There are standard trailer as a carrier, with storage and transport functions, with "T" said.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GA 871-2010_English be delivered?Answer: Upon your order, we will start to translate GA 871-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GA 871-2010_English with my colleagues?Answer: Yes. The purchased PDF of GA 871-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|