Guide of the maintenance for power plant valve - Part 1: general provisions
| Valid |
DL/T 2025.1-2019
|
PDF similar to DL/T 2025.1-2019
Basic data | Standard ID | DL/T 2025.1-2019 (DL/T2025.1-2019) | | Description (Translated English) | Guide of the maintenance for power plant valve - Part 1: general provisions | | Sector / Industry | Electricity & Power Industry Standard (Recommended) | | Classification of Chinese Standard | F23 | | Classification of International Standard | 27.040 | | Word Count Estimation | 43,414 | | Date of Issue | 2019-06-04 | | Date of Implementation | 2019-10-01 | | Quoted Standard | GB 150.4; GB/T 5796.4; GB/T 21465; GB/T 22652; GB 26164.1; GB/T 26480; DL/T 838; DL/T 869; DL/T 1821; DL/T 5210.1; DL/T 5210.5; NB/T 47014; NB/T 47015; NB/T 47018.1; NB/T 47044; JB/T 6438; TSGD 3001 | | Issuing agency(ies) | National Energy Administration | | Summary | This standard specifies the requirements for the organization, process, process, debugging, quality management, acceptance and other aspects of valve maintenance of power station steam (gas) water, oil and other systems. It mainly provides guidance for the technical management and quality control of the technical personnel of power plants and valve maintenance units to organize and carry out related valve maintenance. This standard is applicable to the overhaul of the valves and their driving devices of the steam (gas) water, oil and other systems of the power station. |
DL/T 2025.1-2019: Guide of the maintenance for power plant valve - Part 1: general provisions---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guide of the maintenance for power plant valve-Part 1.general provisions
ICS 27.040
F 23
Record number. 63143-2018
People's Republic of China Electric Power Industry Standard
Guidelines for overhaul of power station valves
Part 1.General
2019-06-04 released
2019-10-01 implementation
Issued by National Energy Administration
Table of contents
Foreword...I
1 Scope...1
2 Normative references...1
3 Terms and definitions...1
4 Maintenance interval and scope...2
5 Valve maintenance process...2
6 Maintenance preparation...3
6.1 General requirements...3
6.2 Requirements of the construction unit...3
6.3 Personnel requirements...3
6.4 Safety requirements...4
6.5 Site requirements...4
6.6 Requirements for tools and testing equipment...4
6.7 Valve maintenance conditions...5
7 Maintenance process requirements...5
7.1 Surface grinding...5
7.2 Grinding the sealing surface...7
7.3 Repair welding...9
8 Valve replacement...11
8.1 Valve replacement principle...11
8.2 Parts replacement...11
8.3 Replacement principle of drive unit...11
8.4 Inspection of new valve...11
8.5 Valve installation...12
9 Valve commissioning...12
9.1 Commissioning organization...12
9.2 Debugging conditions...12
9.3 Debug project...12
10 Quality Control and Acceptance...13
10.1 Quality Control...13
10.2 Acceptance of the valve...13
10.3 Technical data management...14
Appendix A (Normative Appendix) Risk Control Measures for Power Station Valve Inspection...16
Appendix B (Informative Appendix) Attached Table of Valve Maintenance Information...19
Appendix C (Normative Appendix) Off-line valve sealing test method...25
Appendix D (Informative Appendix) Quality Management Attachment Table for Valve Maintenance Process...28
Foreword
This power station valve maintenance guide is a series of standards, divided into the following 9 parts.
--Part 1.General Provisions
--Part 2.Butterfly Valve
--Part 3.Check Valve
--Part 4.Ball Valve
--Part 5.Gate Valve, Globe Valve
--Part 6.Safety Valve
--Part 7.Regulating Valve
--Part 8.Special valves for power stations
--Part 9.Driving Device
This part is Part 1.General Provisions.
This part is drafted in accordance with the rules given in GB/T 1.1-2009 "Guidelines for Standardization Work Part 1.Standard Structure and Compilation".
Please note that certain contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents.
This part was proposed by the China Electricity Council.
This part is under the jurisdiction of the Power Plant Valve Standardization Technical Committee.
Drafting organizations of this section. State Power Investment Corporation Henan Electric Power Maintenance Engineering Co., Ltd., Xi'an Thermal Power Research Institute Co., Ltd., Jiangsu
Yuda Power Station Auxiliary Valve Manufacturing Co., Ltd., Harbin Power Station Valve Co., Ltd. of Harbin Electric Group, Shenneng (Hong Kong) International Co., Ltd.,
Wuhan Boiler Group Valve Co., Ltd., Shaanxi Yihao Technology Development Co., Ltd.
The main drafters of this section. Wang Yusheng, Li Yongkang, Dai Langcai, Zhang Tao, Liu Zhengqiang, Wan Shengjun, Jia Rongpin, Pang Guoxin,
Zhang Zuodong, Feng Yan, Zheng Lifeng, Liu Jianmin, Sun Lili, Chang Cheng, Han Wenqi, Wu Yonghong, Zhang Xiao, Zhai Qiwu.
This section is the first release.
The opinions or suggestions during the implementation of this part are fed back to the Standardization Management Center of the China Electricity Council (Baiguang Road, Beijing)
Er Tiao No. 1, 100761).
Power Station Valve Inspection and Repair Guidelines Part 1 General Rules
1 Scope
This part specifies the requirements for the organization, procedures, and quality management of the valve maintenance of power plant steam (gas) water, oil and other systems.
Mainly provide guidance for the technical management and quality control of related valve maintenance for the technical personnel of power plants and valve maintenance units.
This part is applicable to the overhaul of valves and their driving devices in power station steam (gas) water, oil and other systems.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to
This document. For undated references, the latest version (including all amendments) applies to this document.
GB 150.4 Pressure Vessel Part 4.Manufacturing, Inspection and Acceptance
GB/T 21465 Valve Terminology
GB/T 22652 Qualification of Surfacing Welding Process for Valve Sealing Surface
GB 26164 Electrical Safety Work Regulations
GB/T 26480 Inspection and testing of valves
GB/T 5796.4 Trapezoid Bolt Part 4.Tolerance
DL/T 838 Guidelines for equipment maintenance of power generation enterprises
DL/T 869 Welding technical specification for thermal power plant
DL/T 5210.1-2012 Electric Power Construction Quality Acceptance and Evaluation Regulations Part 1 Civil Engineering
DL/T 5210.5 is wrong! The reference source was not found. Electric Power Construction Quality Acceptance and Evaluation Regulations Part 5.Piping and System
DL/T 5210.7 Construction Quality Acceptance and Evaluation Regulations of Electric Power Construction Part 7.Welding
NB/T 47014 welding procedure qualification for pressure equipment
NB/T 47015 Pressure Vessel Welding Regulations
NB/T 47018.1 Technical Conditions for Ordering Welding Materials for Pressure Equipment Part 1.General Purchasing Rules
NB/T 47044 Power Station Valve
JB/T 6438 Technical requirements for plasma arc surfacing of valve sealing surface
TSGD3001-2009 Pressure Pipe Installation License Rules
GB 26164 Electrical Safety Work Regulations
3 Terms and definitions
"GB/T 21465 error! The reference source was not found. ", the terms defined in "DL/T 838" and the following terms and definitions apply
In this standard.
3.1
Inspection
Measure, inspect, test, etc., the performance of the inspection items, and compare the results with the requirements of the standard to determine
The activity carried out on whether the performance is qualified.
3.2
Finished product protection
Finished product protection refers to the protection of the owner’s existing equipment, devices, parts and parts during construction or transportation. At the same time,
During the construction process, take proper measures for some completed branches, sub-projects or parts to avoid damage caused by the construction of other parts
work.
3.3
Side station
The side station refers to the on-site follow-up supervision activities carried out by the inspectors on the construction quality of key parts or key procedures.
4 Maintenance interval and scope
4.1 The maintenance interval of power station valves can follow the maintenance interval of the host equipment.
4.2 The main steam system, main water supply system, cooling and heating system, circulating water system, and condensate
The valves of the system should be overhauled.
4.3 The other levels of maintenance should be based on valve characteristics, technical conditions, component life cycles, anti-accident measures plans and various monitoring information.
Determine the maintenance items of the valve, and arrange the annual inspection of the valve.
4.4 The maintenance interval can be reasonably extended on the basis of the specified maintenance interval according to the technical condition of the valve. The technical condition of the valve does not allow it to continue
When working, maintenance should be arranged and measures should be taken to prevent accidents.
5 Valve maintenance process
Valve maintenance should be carried out in accordance with the maintenance process, which is shown in Figure 1.
Figure 1 Valve maintenance process
6 Preparation for maintenance
6.1 General requirements
6.1.1 Before the valve is overhauled, a technical diagnosis should be carried out to check the internal leakage and external leakage of the valve to determine the basic problems of the valve.
6.1.2 The necessary spare parts should be prepared before the valve is overhauled.
6.1.3 The construction unit should complete the preparation of the project construction organization design and submit it for review and approval before the overhaul. The construction organization design should include.
1) Clarify the organization and management system, safety, health and environmental supervision system and quality management system of the maintenance project.
2) Clarify the responsibilities of personnel in each system.
3) Human resource plan for maintenance project.
4) Use plan of special or special machinery and equipment.
5) The unit maintenance implementation plan should be compiled, and the maintenance schedule network diagram and control table should be drawn.
6) The overhaul should draw a fixed site management diagram for the overhaul, and the overhaul should be managed according to the fixed site diagram.
6.1.4 Before the valve is overhauled, a valve maintenance work card (see Appendix A1) should be compiled, and work instructions and special maintenance items should be compiled for important valves.
The project should prepare a special technical plan.
6.2 Requirements of the construction unit
6.2.1 The construction unit shall obtain the qualification certificate of the corresponding level in accordance with the law, and contract the project within the scope permitted by its qualification level.
6.2.2 The construction unit shall obtain a safety production license according to law.
6.2.3 The construction unit shall engage in pressure pipeline installation within the corresponding qualification scope specified in TSGD 3001-2009.
6.3 Personnel requirements
6.3.1 The maintenance personnel should be familiar with the structure, performance and principle of the system and equipment, and familiar with the maintenance process, procedures, debugging methods and
Quality standards, familiar with safe working procedures.
6.3.2 Maintenance personnel shall have corresponding qualifications and meet the requirements of on-site work.
6.3.3 The maintenance personnel shall undergo safety training and pass the examination before entering the site, and the maintenance operations in special areas shall be in accordance with relevant regulations and requirements of the owner
Maintenance work can only be carried out after passing the training examination.
6.4 Safety requirements
6.4.1 The maintenance work shall comply with the relevant requirements of safety management to ensure the safety of personnel and equipment during the maintenance process.
6.4.2 Before maintenance work, check and verify the shutdown, depressurization and discharge of media.
6.4.3 When the valve maintenance site is in a flammable and explosive place, a toxic and harmful place, or a restricted space, it must be protected in accordance with the corresponding regulations
Measures.
6.4.4 The working area used should be checked before the maintenance work starts to confirm compliance with relevant regulations.
6.4.5 Insulation materials for valves dismantled during valve maintenance should be treated in accordance with environmental protection requirements, and materials with reuse value should be
Effective stacking management ensures a clean and orderly maintenance environment.
6.4.6 The maintenance personnel should be familiar with the safety risks and corresponding safety measures in the maintenance area (see Appendix A).
6.5 Site requirements
5.5.1 Maintenance site setting.
1) The valve maintenance area should be effectively and safely separated from other equipment and valves, and the construction unit shall carry out in accordance with the requirements in the maintenance area
It is allowed to use after the site layout and acceptance.
2) The valve maintenance site should consider its bearing capacity, and the valve placement position should not be greater than the bearing capacity of the area.
3) The ground of the maintenance area should be well protected, and the maintenance function modules should be divided (tool placement area, measuring tool placement area, lifting equipment
Storage area, spare parts storage area, maintenance area, garbage storage area, etc.).
4) The maintenance area should be effectively isolated (a cross-working anti-dropping net is set above).
5) Safety warning signs should be set up in the inspection area.
6) Information boards are set in the inspection area, and the content of the information boards can be adjusted according to their own conditions.
7) The ground of the inspection area should be protected by finished products.
5.5.2 Repair site restoration.
1) After the overhaul is completed, the overhaul site should be cleaned up to ensure that the site is cleared after the work is completed.
2) After the overhaul, the equipment is in its original color, the signs are complete, and the protective facilities are complete, meeting the requirements of safe and civilized production.
6.6 Requirements for tools and testing equipment
6.6.1 Prepare a list of maintenance tools and appliances according to the content of the maintenance valve before maintenance.
6.6.2 The tools and equipment used in the inspection and repair process should meet the relevant national standards and be qualified.
6.6.3 The measuring tools and testing instruments used in the process of overhaul shall comply with the relevant national standards and be inspected regularly.
6.6.4 The special equipment used in the inspection and repair process shall comply with the national special equipment manufacturing and use regulations, and shall be inspected by an inspection-qualified unit.
Pass the inspection and the certificate is within the validity period.
6.7 Valve maintenance conditions
6.7.1 The current system has been shut down or the valve has been disconnected from the system.
6.7.2 The discharge valve at the bottom of the system and the top vent valve should be open.
6.7.3 Put the valve in the switch state suitable for maintenance.
6.7.4 The pressure inside the valve is reduced to zero (gauge pressure).
6.7.5 There is no residual medium in the connecting system before and after the valve. Overhaul the valves of the common mother control system to monitor the bottom of the mother pipe
The quality leakage check valve does not show continuous line or no more than 15 drops per minute of medium leakage. After opening the exhaust valve on the top of the main pipe
No medium discharge in the runner is the reference basis.
6.7.6 The temperature of the valve body of the high temperature and high pressure valve drops below.200 ℃, and the valve can be insulated and removed.
7 Maintenance process requirements
7.1 Surface grinding
7.1.1 The surface grinding of the valve is mainly to remove the rust, burrs, local deformation, slight grooves and local bumps on the surface of the valve parts.
Rationale.
7.1.2 Polished parts mainly include valve body assembly parts, bonnet, valve stem, valve stem nut, valve plate/disc, upper seal fitting, self-sealing
Seal valve quadruple ring (six ring), pressure ring, bracket bearing chamber and fasteners, etc.
7.1.3 The following grinding methods can be used according to the parts and defects.
1) Mechanical processing and grinding, such as turning, boring, and grinding on mechanical equipment.
2) On-site portable mechanical grinding, such as grinding and polishing with portable grinder.
3) Manual grinding, such as filing, grinding, grinding with special tools, matching grinding, etc.
4) Sanding with emery cloth.
7.1.4 See the table for the surface grinding positions, grinding methods and quality requirements of valve parts. Valve stem, valve body, fasteners, fastening screws
Refer to Appendix B for commonly used materials.
7.2 Grinding the sealing surface
7.2.1 The valve seat grinding can be carried out by electric grinder or manual tool. The valve plate/disc can be manual flat grinding and electric grinding
If the defect groove is too deep, the machine tool repair and grinding method can be used.
7.2.2 Choose grinding tools and methods according to valve structure and type. Valves with DN≤50mm can be ground with manual tools.
Valves with DN≥50mm can be ground with electric tools.
7.2.3 Grinding is divided into coarse, medium, fine and fine grinding. The sealing surface defects include pits, scratches, erosion grooves, etc., which can be selected according to the defect.
1) When the defect depth is less than 0.40mm, you can choose a grinding machine for grinding treatment.
2) If the defect depth is greater than 0.10mm or less than 0.40mm, rough grinding can be used.
3) If the depth of the defect is less than 0.10mm or greater than 0.03mm, medium grinding can be used.
4) Fine grinding can be used if the defect depth is less than 0.03mm. Fine grinding is generally used to improve the surface roughness and accuracy of the sealing surface.
5) When the defect depth is greater than 0.40mm, if conditions permit, the machine can be repaired to make the defect depth less than 0.40mm.
Then use a grinding tool to grind. There is no condition for machine tool repair. You can directly choose rough grinding to medium and fine grinding.
7.2.4 The grinding speed and pressure requirements are as follows.
1) When manual grinding is used, the movement speed is controlled at 8 m/min~15m/min.
2) The grinding speed is controlled at 100r/min when the valve disc diameter is less than 80mm.
When it is larger than 100mm, the grinding speed is controlled at 50r/min.
3) The pressure applied to the grinding machine during grinding should not be too high, generally the unit pressure should not exceed 150kPa~1200kPa.
7.2.5 The grinding head and grinding seat can be prepared according to the size and angle of the valve seat, valve plate/disc, and when grinding the sealing surface of the cone globe valve,
Configure the valve seat grinding mold with the same angle.
7.2.6 When assembling grinding tools on the valve seat, valve plate/disc, the centering and verticality of the tool and the valve seat, valve plate/disc should be ensured to avoid
Research bias.
7.2.7 During the grinding process, the alignment and verticality of the grinding machine and the valve seat, valve plate/disc should be maintained, and frequent inspection and adjustment should be made to prevent grinding deviation.
7.2.8 The grinding of the valve seat and disc sealing surface should meet the design coincidence requirements, and the valve plate sealing surface of the wedge-type single disc gate valve should be wide enough
The minimum wear stroke should be considered when turning and grinding, and the sealing surface of the valve plate should not be lower than the center of the sealing surface of the valve seat.
7.2.9 The abrasive materials include abrasive paste (var sand), diamond emery cloth, diamond powder, mineral oil (motor oil) and animal oil, etc. The selection requirements are as follows
under.
1) Use manual tools to grind, you can choose suitable grind materials according to the conditions of the tools.
2) For fine grinding, you can use fine grinding materials, 250 mesh ~ 300 mesh sandpaper, and fine grinding can use 400 mesh sandpaper to add ore
The natural oil and animal oil are ground with 400 mesh diamond powder.
3) Choose electric tool for grinding, generally choose diamond gauze and special grinding head for grinding. You can choose when the machine is equipped with a special mould.
Grind with grinding paste.
4) During the grinding process, pay attention to the use of grinding materials. It is not advisable to mix them. When converting between coarse, medium, fine, and fine grinding, the sealing surface should be
Abrasive materials are removed and wiped clean.
5) It is forbidden to use coarse and medium grinding materials during fine grinding and fine grinding.
7.2.10 Grinding requirements using abrasive paste
1) Rough grinding refers to the use of rough grinding materials and grinding tools to remove pits, grooves, etc. with large defects.
2) Medium grinding is to use finer grinding materials and use grinding tools to remove fine grooves, so that the sealing surface defects are basically eliminated, and the sealing
The surface is bright.
3) Fine grinding is a process performed with fine grinding materials, and generally should be done by hand grinding. The valve plate/disc plate should be ground on the plate
It is not advisable to grind in the same direction repeatedly in the forward and reverse directions. The valve seat grinding can be carried out with tools or special moulds. Grinding material can use fine
Grinding powder mixed with animal oil or mineral oil. The grinding process should be based on the weight of the grinding tool and the rotating force.
Gravity, grinding to the required surface roughness can be transferred to the fine grinding process.
4) Fine grinding is the final process of grinding. It is a grinding method to improve the surface accuracy and roughness of the valve seat, valve plate/disc sealing surface.
The fine grinding of the globe valve generally uses the valve seat and the valve disc to cooperate with each other for relative grinding, and mineral oil can be used as a grinding agent.
7.2.11 Grinding requirements using emery cloth
1) When the valve seat, valve plate/disc pits and grooves are organic processing equipment, the defects can be repaired by machine tools, and then polished
Polish with emery cloth, or place it on the grinding seat of the machine for grinding. If the defect is deeply repaired and the valve seat and valve plate/disc assembly are not satisfied
When matching the conditions, the defects should be welded and repaired before the car is repaired.
2) Use 80-mesh coarse sandpaper for rough grinding of pits and grooves, and choose 100-250-mesh sand according to the elimination of defects
The paper is ground, and the defects are basically eliminated. The sealing surface can be polished with 300 mesh or more sandpaper, and the surface roughness can reach 0.8~
0.05μm, the smallest can reach 0.006μm, and the dimensional accuracy can reach 0.001 mm~0.005mm.
3) When grinding the valve plate/disc with emery cloth, the figure-eight grinding method can be used for rough grinding to increase the grinding speed. During medium and fine grinding,
To grind in the same direction, do not alternately grind forward and backward. The grinding process should be checked diligently to avoid grinding deviation, and defects basically disappear, optional
Use finer sandpaper to continue grinding.
4) When grinding the valve seat with emery cloth, the grinding process should ensure the centering and verticality of the tool to the valve seat. Globe valve grinding tools and valve body
The gap should be kept at about 0.20mm, and the gap should not be too large or too small to avoid grinding deviation or damaging the machine tool.
5) When using electric or pneumatic tools to grind, the force should be uniform to avoid wrinkles of the emery cloth and affect the grinding quality.
7.2.12 After the grinding work is finished, the grinding materials in the valve plate/disc, valve seat and valve body flow passage should be removed, and it can be used if necessary
Kerosene cleaning.
7.2.13 Refer to Table 1 for the acceptance criteria for grinding of sealing surfaces.
7.3 Repair welding
7.3.1 If the defect of valve parts exceeds the acceptance standard, the defect shall be removed. When the defect is removed, the size is smaller than the design allowable
Value, welding repair should be carried out.
7.3.2 Before welding repairs, the welding unit should find out the reason and formulate a feasible plan.
7.3.3 Welding repair of valves should be carried out by welders who have obtained corresponding examination certificates in accordance with welding repair procedures.
7.3.4 Weld repair of valves shall be carried out in accordance with the following specifications.
1) The welding repair of the pressure parts of the valve body should comply with GB 150.4.Error! The reference source was not found. Provisions.
2) Plasma arc surfacing welding on the sealing surface should comply with JB/T 6438 error! The reference source was not found. Provisions.
3) The welding procedure qualification should be in accordance with NB/T 47014, and the surfacing welding procedure qualification of the sealing surface should comply with GB/T 22652.Error!
The reference source was not found. Or in accordance with the welding technical requirements of the valve manufacturer.
4) The technical requirements of valve welding repair should meet NB/T 47044.Error! The reference source was not found. Claim.
5) Welding repair materials for valves should comply with NB/T 47...
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of DL/T 2025.1-2019_English be delivered?Answer: Upon your order, we will start to translate DL/T 2025.1-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of DL/T 2025.1-2019_English with my colleagues?Answer: Yes. The purchased PDF of DL/T 2025.1-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|