CQC-C2101.01: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| CQC-C2101.01-2024 | English | 849 |
Add to Cart
|
6 days [Need to translate]
|
China Compulsory Certification Implementation Detailed-Rules - Coating products
| Valid |
CQC-C2101.01-2024
|
| CQC-C2101.01-2014 | English | 1319 |
Add to Cart
|
6 days [Need to translate]
|
China Compulsory Certification Implementation Detailed-Rules - Solvent-based wood coatings
| Obsolete |
CQC-C2101.01-2014
|
PDF similar to CQC-C2101.01-2024
Basic data | Standard ID | CQC-C2101.01-2024 (CQC C2101.01-2024; CQC-C21-01.01-2024; CQC-C2101.01-2024) | | Description (Translated English) | China Compulsory Certification Implementation Detailed-Rules - Coating products | | Sector / Industry | China Quality Certification Center - CCC Implementation Detailed-Rules | | Classification of Chinese Standard | CQC | | Word Count Estimation | 33,323 | | Date of Issue | 2024-06-28 | | Date of Implementation | 2024-07-01 | | Drafting Organization | China Quality Certification Center | | Administrative Organization | China Quality Certification Center |
CQC-C2101.01-2014: China Compulsory Certification Implementation Detailed-Rules - Solvent-based wood coatings ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ID. CQC-C2101.01-2014
Mandatory product certification implementation rules
Solvent coatings products
China Quality Certification Center
September 1, 2014 release
September 1, 2014 implementation
Mandatory product certification implementation rules solvent-based paint products CQC-C2101.01-2014
table of Contents
0 Introduction ..1
1 Scope 1
2 Standards for Certification ..1
3 Authentication Mode 1
3.1 Optional two authentication modes ..1
Selected authentication mode 3.2 principles ..2
4 Authentication unit divided ..2
5 3 certification commission
Proposed commission of the certification and acceptance 5.1 .3
5.2 application materials 3
5.3 Implementation Arrangements 4
6 4 Certification
6.1 Quality assurance and product consistency check (initial factory inspection) .4
6.2 Type 6 test
6.3 Evaluation and Certification decisions .9
6.4 Time frame for certification 9
7-up inspection 9
Frequency and time 9 7.1 up inspection
.10 7.2 certified follow-up examination after
7.3 Supervision sampling 11
After recording 7.4 certified oversight .13
7.5 Evaluation of the results of follow-up inspection ..13
8 certificate .13
Holding certificates ..13 8.1
Content ..14 8.2 certificates
Change 8.3 Certification/expansion ..14
Pause 8.4 certificates, cancellation and withdrawal ..16
8.5 Certificate usage ..16
9 certification marks .16
Mandatory product certification implementation rules solvent-based paint products CQC-C2101.01-2014
.16 9.1 mark Shape
9.2 Requirements .16
10 17 charges
11 Certification Responsibility .17
12 production enterprises category management .17
12.1 Sort enterprise information ..17
Standard enterprise classification 12.2 18
13 and technical disputes, complaints and appeals process and time related requirements .19
Annex 1...20
Annex 2...22
Annex 3...29
Mandatory product certification implementation rules solvent-based paint products CQC-C2101.01-2014
0 Introduction
Rule based on "compulsory product certification and implementation rules decoration products", "Compulsory
Certification and implementation rules production enterprise management, authentication mode selection and determination "," Compulsory
Certification testing resources company rules and other authentication result of the use of "," Compulsory
Requirements for certification rules factory inspection General requirements "and other rules of preparation, and supporting the above rules
Joint implementation.
Manufacturers should ensure that certified products can continue to meet the applicable standards and certification
begging.
1 Scope
The Rule applies to solvent-based coatings products. interior decoration polyurethane, nitro
Class, alkyd solvent-based coatings, including interior decoration wood materials for coating factory
Solvent-based coatings, does not apply to outdoor decorative coatings.
Since laws and regulations or relevant product standards, technology, industrial policy and other factors cited changes
From the scope of adjustments should be based on the CNCA announcement shall prevail.
2 Standards for Certification
"Interior decoration materials, solvent-based coatings of harmful substances" (GB 18581)
These criteria should in principle be running the latest version of the national standardization administrative department issued when
Need to use other versions of the standard, the relevant standards shall be in accordance with applicable requirements of CNCA released
The announcement execution.
3 authentication mode
3.1 Optional two authentication modes
Solvent coatings implement mandatory product certification of basic authentication mode.
Quality assurance and product consistency check type testing certified after the track inspection
Mandatory product certification implementation rules solvent-based paint products CQC-C2101.01-2014
CQC production enterprises category management, category management and combining the results in basic authentication mode
Based on the increase in the production site, as appropriate, extraction and other samples or to check the relevant factors to determine certification
Clients can apply authentication mode.
Solvent coatings CCC certification modes are.
Mode 1. Enterprise quality assurance ability assessment and the products consistency check after the type test certified
Follow-up inspection
Mode 2. Quality assurance ability assessment and the products consistency check after the type test certified
Track inspection and supervision of sampling
3.2 Principles of the selected authentication mode
CQC certification in accordance with the implementation process to obtain certification of product quality and company quality assurance information like
Case, the company is divided into A, B, C, D four categories, and the authentication process of implementation of the enterprise classified into
Dynamic line adjustment.
CQC according to Table 1 to select the appropriate mode according to the authentication business classification.
A class manufacturers. the use Mode 1 for certification;
Class B, Class C, Class D Manufacturer. The mode 2 for certification.
4 certification application unit
In principle, different producers, different processing sites, product category, different solvent-based coating
Material for different authentication unit, the same producers, the same processing establishments, film forming materials of the same
Varnishes and paints each a certification unit.
Specific units are divided into. Nitro varnish, nitro paint, alkyd varnish, Alkyd color
Paint, polyurethane varnish, polyurethane paint.
Units group is divided into. varnish unit group, paint unit group.
Mandatory product certification implementation rules solvent-based paint products CQC-C2101.01-2014
5 certified delegate
5.1 Certification and Acceptance commission proposed
Certification to CQC principal accreditation commission and submit relevant information.
After CQC certification received information submitted by the client is responsible for audit, management, preservation, to confidentiality
data.
Under normal circumstances CQC audit data should be completed within 10 days, the client feedback to the certification audit results
(Accept, or will not be accepted after receiving supplementary material). Does not comply with national laws and regulations and relevant industrial policies
When requested, the relevant commission of the certification will not be accepted.
5.2 Application Information
Authentication Client shall submit the following information.
1) certification application;
2) certification clients, producers, production enterprises registration certificate (business license, organization
Code card, etc.) copies;
3) national laws and regulations required materials (such as. safety production license) copies.
4) Product description (including. authentication unit, each unit covered by the certification of products/Product
Name/model, construction ratio, the key raw materials, etc.) [1];
5) factory inspection questionnaire;
6) agreement or contract with the certified products related (such as agreement ODM, OEM agreements and other
Off power of attorney, etc.);
7) the production process, the inspection process subcontract agreement (if needed)
8) ODM businesses and stakeholders protocols (if needed)
9) for the application, and documents related to the change of the project;
10) other necessary documents.
Certification of the principal legal dossiers and information compliance, authenticity, validity, responsible
CQC no longer review the authenticity of the above information.
[Note 1] product family is divided within the same product certification unit, division principles.
Mandatory product certification implementation rules solvent-based paint products CQC-C2101.01-2014
1) first divided by purpose. primer, paint series;
2) On the basis of "primer", "finish" the division series, then divide gloss characteristics.
a) Highlight Series (generally refers to the gloss (60 °) ≥80). may include a high-gloss, light, bright and so special;
b) Matte Series (generally refers to the gloss (60 °) < 80). may include a semi-matte, matte, all dumb and so on;
3) when the product is not the same component (such as two component, three component) should be divided into different product lines.
4) Construction of the ratio declaration should correspond to the product family and product names when reporting to product ratio of construction
The minimum range of the ratio of the maximum value of the series corresponding to the main paint, thinner, curing agent /; when applying the product name, Shi
Construction work ratio should be the ratio of this product.
5) refers to the impact of key raw materials --- GB 18581 standard requirements of harmful substances, raw materials, generally including a resin,
Solvent inorganic pigments, curing agents, may be benzene, halogenated hydrocarbons, ethyl benzene, methanol and other harmful substances.
5.3 Implementation Arrangements
CQC after accepting the commission of the certification and classification according to the actual management of the company, to determine the real certification
Shi specific programs and inform the client authentication.
6 Certification
6.1 Quality assurance and product consistency check (initial factory inspection)
To ensure that manufacturers certified products can continue to meet the applicable standards and certification
Seek, CQC for enterprise quality assurance and product consistency check.
6.1.1 Basic Principles
Initial factory inspection, production enterprises should produce certified products when no production of certified products,
Manufacturers should be informed in advance so that timely arrangements for production planning CQC factory inspection.
CQC certification after accepting the commission, shall assign qualified inspectors Compulsory Certification composition
Inspection Unit, the production enterprises in corporate quality assurance and product consistency check.
Initial factory inspection certification of products covering all processing premises. If necessary, CQC to be born
Place outside production companies to implement extended inspections.
6.1.2 inspection man-days
CQC certified products based on the number of units and the number of products covered by the species, and due consideration of green plant
Mandatory product certification implementation rules solvent-based paint products CQC-C2101.01-2014
Factory production scale to determine the number of man-days inspection Usually each individual place for 1-6 days.
6.1.3 check the contents
6.1.3.1 Quality assurance ability
CQC requirements for corporate quality assurance ability assessment, see Annex 2 of this Rule.
6.1.3.2 Product consistency check
CQC by the manufacturer in certificated products, randomly selected authentication products including, but not
Limited to the following contents of inspection.
1) The minimum product sales package express product range and (or) product name and the associated standard
Knowledge consistency;
2) product family and (or) product name/model, diluents name/model/producer name,
Curing agent name/model/producer name, the construction ratio of consistency;
3) key ingredient name, type, source and amount of consistency.
6.1.4 Inspection findings
Inspection team completed inspection in the factory inspection program specified time, after checking to mention the end of the CQC
Post inspection report and make recommendations to check conclusions.
Inspection findings and judgment based on the following types.
1) factory inspection by. comply with when all items;
2) written verification by. general non-conformity exists; there is no consistency to the product or product label
Quasi compliance when a serious impact.
3) on-site verification by. there are more general non-conformity or nonconformity serious but did not produce
Product or product consistency and standards compliance when a serious impact.
4) Check the plant does not pass. constituting a system does not meet the more general or individual does not meet the strict entry
Heavy non-conformity, and a direct threat to the consistency of the product when the product or compliance with the standards.
Factory inspection into the general non-conformity and nonconformity serious nonconformity categories. Among them, a
Generally refers to non-conformity may have a slight impact on the quality of product certification nonconformity; major nonconformity
Certification means the items have serious quality problems in the manufacturing or inspection process, and a product
Mandatory product certification implementation rules solvent-based paint products CQC-C2101.01-2014
Causing serious problems of non-conformities.
6.1.5 Follow-up inspection activities
6.1.5.1 For non-conformity, the manufacturer should take timely corrective measures, CQC written or on-site inspection
Card does not meet the validity term corrective measures implemented. Length of corrective actions and the implementation period shall not meet
The severity of the items fit on the general principle of nonconformance rectification time is not more than 40 days,
Serious nonconformance rectification time is not more than three months.
6.1.5.2 When checking the conclusion is "field-proven through" individual arrangements 1 May CQC principle factory inspection
Check, check the contents is to verify the validity of all nonconformance corrective measures implemented.
6.1.5.3 When checking the conclusion is "not through the factory inspection", such as certification clients continue certification, production enterprises
Industry should be completed within three months of rectification, the rectification report submitted in writing, 2 man May CQC principles
Factory inspection, check the contents of all the outside in addition to verify the validity of nonconformance corrective measures implemented, should
Details of the relevant provisions of Annex 2 and product consistency checks.
6.1.5.4 When checking the company disagrees with the conclusion can be within 5 days after the end of the examination to apply for re CQC
Meeting or review.
Check 6.1.6OEM Enterprises
For the certified products have been certified products and products for the same kind of OEM enterprises, debt relief for heavily
Check the terms of the complex, where necessary, other provisions were challenged to re-inspection.
For the certified products have been certified products and products for different kinds of OEM business, CQC basis
Quality assurance capacity requirements to implement all the provisions of inspection.
6.2 Type tests
6.2.1 Type test sample request
CQC after the completion of corporate quality assurance and product consistency check, the manufacturers site Health
Production and confirm qualified products to extract samples of type testing in accordance with the relevant provisions of Rule 1 of the Annex.
If necessary before extracting type test sample can also check the consistency of the enterprise and product quality assurance
get on.
In principle, the type test samples shall be taken from the factory floor. In special cases, and commissioned by the CQC
Mandatory product certification implementation rules solvent-based paint products CQC-C2101.01-2014
In consultation can also be sampling in other places.
Certification principal should ensure that they provide a sample of normal production and confirm the actual production capacity
.CQC Provide product consistency and/or authenticity of the principal certified laboratory response samples for review.
Laboratory samples doubt the authenticity of the CQC should explain the situation, and with production enterprises
After written communication, make the appropriate treatment of the sample.
Clients, producers, manufacturers of the sample implementation should be actively cooperate and assist,
Completed within the time specified sampling activities and to ensure that within a specified period of time (within 5 days, environment
Within an additional 15 days) the sample is sent to the designated testing organization for testing.
6.2.2 Type test project
Type of pilot projects in accordance with the rules in Annex 1 "solvent-based coatings compulsory product certification unit plan
Sub-type testing and sampling requirements for "execution.
6.2.3 Sampling principle
Each application unit sampling units are in different places using the same process technology management,
The same manufacturing process and the type of the key raw material sources and ratios without significant changes, may be appropriate to reduce the pumping
Quantity.
Samples should be representative, and then the normal production and factory-tested and products
Extract Sampling national supervision before the date 12 months and to meet the requirements of GB 18581 of the subject
Inspection reports can replace a sampling unit, but each production site to extract a minimum of unit testing.
6.2.4 initial certification of sampling selected varieties
6.2.4.1 varnish unit group
In each application unit in accordance with the provisions of 6.2.3 to select a species, according to the construction ratio
Requirements, randomly selected appropriate diluent, curing agent.
6.2.4.2 Paints unit group
Each application unit within the unit group, according to the provisions of 6.2.3 to select a white goods
Species; Meanwhile, according to the first principle drawn colored samples in all of the application unit of Random
Take a colored varieties. Press the "Product description" the construction ratio requirements, randomly selected the appropriate dilution
, Curing agents.
6.2.5 Number of samples
Sampling base. the main agent (paint) shall be not less than 100kg.
Mandatory product certification implementation rules solvent-based paint products CQC-C2101.01-2014
Number of samples. the main agent in the same sample shall be taken from 1kg batches of products; curing agents, diluents press
Construction of the ratio prescribed .1 samples drawn simultaneously extracted in duplicate, one retained business equipment seized, a send
Cross designated inspection agency.
6.2.6 Extraction Method
Using a random sampling method, as set aside a certain number of samples from the same batch of a plurality of buckets,
After mixing evenly placed in the same container before sampling.
Two samples taken from the mixing vessel (the number should be consistent with 6.2.5) provisions were charged to a suitable
Container, the container should be left void of 5%, reclosable, the sample wipe clean the outer container, and make
Flag, seal on, a retained business equipment seized, a copy with the inspection agency.
Note 1. After opening a small impact on product quality packaging products (when the main agent (paint) Quality ≤5kg /
Barrel) can also be directly extracted per unit of product, not mixing its sampling base should be more than 20 barrels.
Note 2. For certified products only white goods manufacturing enterprises should be the deployment of a scene
Various colors of paint can be randomly selected sample of white and field deployment of a dark paint samples.
Implementation 6.2.7 type testing
Type test should be completed by the national commission designated laboratories laboratory samples for testing,
Should ensure that the detection conclusion true, accurate, complete detection of the whole process of making records and archiving retention,
Ensure the testing process and results recorded with traceability.
Calculated from the receipt of the samples, the laboratory type tests should normally be completed within 20 days.
6.2.8 Type test report
CQC set out harmonized type test report format.
After completion of type testing, type testing laboratory shall be issued by the CQC, principal certification in 5 days
Report Certification principal shall ensure that in the follow-up inspection to be able to provide a complete and law enforcement agencies have CQC
Efficiency type test report.
6.2.9 unqualified disposal
Type test failed, continue as the principal certification certification, the company should be completed within three months
To rectification, submit a written rectification report, CQC can rearrange personnel for product sampling and factory inspection.
1 person-days arrangement in principle factory inspection, inspection is mainly to verify the effective implementation of corrective actions
Resistance. When the on-site inspection in line, product sampling all qualified, product sampling side to retest detects the entire
Change through.
Mandatory product certification implementation rules solvent-based paint products CQC-C2101.01-2014
6.3 Evaluation and Certification decisions
After the authentication information is complete, CQC within 20 days of the type test, and corporate quality assurance capabilities
Product consistency check conclusions and other relevant data/information and a comprehensive evaluation, certification decision.
To meet the certification requirements, the issuance of the certificates. The existence of unqualified conclusion, CQC disapprove recognition
Card commission, certification terminated.
6.4 Time frame for certification
Under normal circumstances, CQC certification from accepting the certificate can be issued within 90 days.
Certification principal and producer/production company must actively cooperate with the certification activities, certification and implementation process
Since the type test failed because of nonconformance shall rectify the presence of lead and other factory inspection certification
Extension of time, are not counted in the time frame for certification.
7-up inspection
Follow-up inspection means according to the production enterprise management CQC certified products and their manufacturers
Supervision fol...
|