| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| CQC-C1105-2014 | English | 1079 |
Add to Cart
|
3 days [Need to translate]
|
China Compulsory Certification Implementation Detailed-Rules - Vehicle horn
| |
CQC-C1105-2014
|
PDF similar to CQC-C1105-2014
Basic data | Standard ID | CQC-C1105-2014 (CQC C1105-2014; CQC-C11-05-2014; CQC-C1105-2014) | | Description (Translated English) | China Compulsory Certification Implementation Detailed-Rules - Vehicle horn | | Sector / Industry | China Quality Certification Center - CCC Implementation Detailed-Rules | | Classification of Chinese Standard | CQC | | Classification of International Standard | CNCA C11-05-2014 | | Word Count Estimation | 27,239 | | Quoted Standard | GB 15742 | | Regulation (derived from) | CNCA C11-05-2014 | | Issuing agency(ies) | China Quality Certification Center | | Summary | This document specifies the China Compulsory Certification (CCC) implementation Detailed-Rules for Vehicle horn. This document defines the Vehicle horn's certification unit; certification entrusting; document requirements; sample requirements; certificati |
CQC-C1105-2014: China Compulsory Certification Implementation Detailed-Rules - Vehicle horn---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
China Compulsory Certification Implementation Detailed-Rules-Vehicle horn
Implementing Rules for Compulsory Product Certification CQC-C1105-2014
0 Preface
The detailed implementation rules for the compulsory product certification of motor vehicle horns (hereinafter referred to as. the detailed implementation rules) are
Motor vehicle horn X CNCA-C11-05..2014 according to the "Implementation Rules for Compulsory Product Certification
(Hereinafter referred to as. implementation rules), as a supporting document for implementation rules, and implementation
Rules are used together.
The product scope, certification basis, etc. and the implementation rules applicable to these implementing rules
The relevant regulations are consistent and are based on the National Certification and Accreditation Administration
(Known as the National Accreditation Administration)
The announcement of catalogue definition and catalogue adjustment will be adjusted.
CQC, in accordance with the provisions of the certification implementation rules,
Formulate and publish this certification
Regulations. These rules establish the classification management requirements of manufacturing enterprises,
Classification to clarify the implementation requirements of compulsory product certification for motor vehicle horns.
0.1 Definition of terms
0.1.1 Use of equipment inspection of production enterprises (referred to as TMP method)
Engineers in designated laboratories carry out tests using testing equipment in the factory laboratory.
The factory shall send testing personnel to assist. Test report issued by the relevant designated laboratory.
0.1.2 Witness detection of production enterprises (referred to as WMT method)
Engineers in designated laboratories witnessed factory laboratory test conditions and factory laboratories
Use your own equipment to complete all tests or test plans submitted by the factory, and witness some
Testing conditions and testing items. Factory laboratory inspectors are responsible for issuing original records and contacting
Witness the designated laboratory engineer to draft a test report in a prescribed format. Specified by related
The laboratory audits and issues the test report.
0.2 Classified management requirements of manufacturing enterprises
CQC collects and sorts all kinds of information related to the quality of certified products and their manufacturing companies.
The production enterprise carries out dynamic classification management. Certification clients, producers, and manufacturing companies should
Cooperate.
CQC divides production enterprises into four categories, which are represented by A, B, C, and D categories.
get on. Factory laboratories should participate in comparison tests to ensure the accuracy and validity of test results.
Hold qualifications.
If there is a demand from the production enterprise, it can be carried out for the on-site testing project proposed by the certification client.
For a single verification, the verification results are only valid for this on-site inspection project. Factory lab can
No more supervision to maintain eligibility. When the same project needs on-site inspection, it should apply for review again.
Scope of application
Suitable for M, N, L 3, U, L5 motor vehicle horns driven by electricity or compressed air
Changes due to factors such as laws and regulations or related product standards, technology, and industrial policies
The resulting adjustment of the scope of application shall be subject to the announcement issued by the CNCA.
2. Certification standards
GB 15742 Performance requirements and test methods for horns for motor vehicles
The above standards should, in principle, implement the latest version issued by the national standardization administrative department
this. When other versions of the standard are required, they shall be applied in accordance with the relevant
The announcement required by the standard is implemented.
3. Authentication mode
3.1 Basic mode of authentication
The basic certification mode for implementing * "p-8 product compulsory certification is.
Supervision after the initial factory inspection of type test is obtained;
Post-certification supervision in the above basic certification model includes follow-up inspection and supervision after certification
Two methods of sampling and testing, including supervision sampling testing and sampling at the production site
Or inspection and market sampling inspection or inspection.
Combined with the classification management principles of production enterprises, the supervision of different types of enterprises in the post-certification supervision
Consider combinations of relevant certification elements, as appropriate.
3.2 Applicability of the certification model
Class A. After the certification, the supervision can use the follow-up inspection after the certification, the sampling of the production site to check
One or a combination of three methods. inspection or inspection, market sampling inspection or inspection.
Type B, C, and D production enterprises. After the certification, the supervision shall adopt the follow-up inspection after the certification
Supervision sampling testing (sampling at production site and/or market).
The selection of the certification mode of the production company of the maintenance parts of the discontinued models can be based on this
Annex 2 to the Rules.
The certification client may make an application for the applicable certification mode according to its actual situation.
CQC based on the characteristics of the product applying for certification and the principles of certification risk control,
The result of the class management determines the authentication mode applicable to the authentication client.
4. Division of authentication unit
In principle, the same producer (manufacturer) and
Motor vehicle horn products without significant differences in the following aspects are a certification unit.
a) Working principle and category;
(2) the shape of the assembly and the number of sound emission units;
(3) the shape and size of the diaphragm;
(4) Shape or type of sound exit;
(5) Rated sound frequency;
(6) Rated voltage/rated air pressure.
The certification client shall propose a certification commission based on the principle of unit division. Can be packaged in the same unit
Contains multiple models. The same model means that the design does not affect the compliance of the standard
The same product produced by the same producer and different production enterprises (should have the same production
Process and same key components/raw material suppliers), or different producers, same production enterprises
The same product produced should be in different application units, but samples from only one unit can be considered
Type test on the product, the products of other manufacturers/producers need to provide information for consistency check
5. Authentication commission
5.1 Certification application submission and acceptance
The certification client submits a certification commission to CQC through the network.
The client of the certificate shall fill in the necessary enterprise information and product information as required. CQC according to relevant requirements
Review the application and send a notice of acceptance or rejection within 2 working days, or
Ask the certification client to re-apply for certification after rectification.
5.2 Application Information
After the application is accepted, the certification client shall submit to the CQC and/or the designated entity as required by the certification scheme.
The laboratory provides relevant application information and technical materials, which usually include.
(1) Application for certification;
(2) The following registration certificates and related documents of certification clients, producers, and production enterprises.
a. Business license, organization code certificate (for initial application and changes);
b. If the three are inconsistent, the relevant agreement or contract signed by the relevant parties must also be submitted
(Such as commissioned processing agreement, authorization, etc.) (if applicable);
c. When the applicant is a seller or importer, it must also submit the seller and producer, import
A copy of the relevant contract between the manufacturer and the producer (for the initial application and changes);
d. Power of attorney of the agent (if applicable);
e. For overseas production enterprises, a domestic entity certificate (relative to
Relevant laws and regulations).
(3) Each certification unit must provide product descriptions and photos in accordance with the requirements of Annex 1 of the Implementation Rules
And product drawings and other technical information. If there are multiple models/specifications in the same unit, please provide
Description of differences between different models. It should be filled in according to the specific technical file format issued by CQC.
And submit electronic materials.
(4) List of key parts/raw materials
Each certification unit is required to provide a list of key components/raw materials in accordance with the requirements of Annex 1 of these Detailed Rules
For key components/raw materials within the scope of compulsory product certification acquired in China
Manufacturers, manufacturers should provide a compulsory product certification certificate; for other parts/raw materials,
Manufacturers can provide corresponding voluntary certifications or comply with GB/T 27025 (IS0/IEC
17025) The test report issued by the accredited laboratory within the validity period.
(5) Production consistency control plan prepared in accordance with Annex 2 of the Implementation Rules and Annex 1 to these Rules
(For initial application and changes)
(6) Factory inspection survey form (if applicable);
(7) Documents required by other certification bodies.
5.3 Implementation arrangements
CQC develops a certification scheme after acceptance and informs the client of the certification. Certification Scheme
It often includes the following.
(1) The authentication mode and unit division used;
(2) List of application materials to be submitted;
(3) Type test plan;
(4) Designated laboratory information;
(5) The required certification process and time limit;
(6) Expected certification costs;
(7) Contact information of CQC staff;
(8) Other matters that need to be explained.
6. Certification implementation
6.1 Type test
6.1.1 Type test plan
For certification commissions that require type testing, CQC
The type test plan shall be formulated in accordance with the principle of unit division, according to the certification standards, and the certification shall be notified.
Witness client. The type test plan includes the sample requirements for sample delivery/sampling by unit or combination of units,
Testing standards and items, laboratory information, etc. When multiple models/specifications are included in the same unit,
Samples should be representative models/specifications, and selected samples should cover as much as possible
Product structural parameters and key component/raw material manufacturers.
6.1.2 Requirements for type test samples
|