JGJ80-1991: Technical code for safety of high altitude operation of building construction (English PDF)
Price & Delivery
US$125.00 · In stock · Download in 9 secondsJGJ80-1991: Technical code for safety of high altitude operation of building construction
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step chartStatus: Obsolete
JGJ80: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
| JGJ 80-2016 | English | 1519 |
Add to Cart
|
10 days
|
Technical code for safety of working at height of building construction
| Valid |
| JGJ 80-1991 | English | 125 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Technical code for safety of high altitude operation of building construction
| Obsolete |
PDFs (Download full copy in 9 seconds upon purchase)
PDF Preview: JGJ80-1991
JGJ 80-1991: Technical code for safety of high altitude operation of building construction
JGJ
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
Technical Code for Safety of
High Altitude Operation of Building Construction
Issued on: JANUARY 08, 1992
Implemented on: AUGUST 1, 1992
Issued by. Ministry of Construction of the People’s Republic of China
Notice on Promulgation of Professional Standard "Technical Code for
Safety of High Altitude Operation of Building Construction"
JIANBIAO [1992] NO.5
In accordance with requirements of Document CHENGKEZI [86] No.263 issued by
Former Ministry of Urban and Rural Construction and Environmental Protection,
"Technical Code for Safety of High Altitude Operation of Building Construction"
developed by Shanghai Building Construction Technical Research Institute has passed
the examination, and is approved as an Professional Standard. the standard number is
JGJ 80-91, and the standard is executed on August 1, 1992.
This standard is governed by Ministry of Construction safety standards technique safety
standards technique governing organization- China Construction First Building Group
Building Research Institute, and explained by Shanghai Building Construction
Technical Research Institute. Research institute of Standards & Norms presides over
publishing.
Ministry of Construction of the People's Republic of China
August 1, 1992
Table of Contents
I GENERAL PROVISION... 4
II GENERAL RULES... 4
III SAFETY PROTECTION FOR EDGE-NEAR AND OPENING OPERATION... 6
3.1 EDGE-NEAR OPERATION... 6
3.2 OPENING OPERATION... 8
IV SAFETY PROTECTION FOR CLIMBING AND HANGING OPERATION... 9
4.1 CLIMBING OPERATION... 9
4.2 HANGING OPERATION... 11
V OPERATING PLATFORM AND SAFETY PROTECTION OF CROSS OPERATION
... 13
5.1.OPERATING PLATFORM... 13
5.2 CROSS OPERATION... 15
VI CHECK AND RECEIVE OF SAFETY PROTECTION FACILITIES FOR WORKING
AT HEIGHT... 15
ANNEX 1 TERM EXPLANATION... 17
ANNEX 2 EDGE-NEARING OPERATION GUARD RAIL CALCULATION AND
STRUCTURE EXAMPLE... 17
ANNEX 3 OPENING OPERATION SAFETY DEVICES SAMPLE... 21
ANNEX 4 CLIMBING OPERATION SAFETY DEVICE SAMPLE... 24
ANNEX 5 CALCULATION AND STRUCTURE SAMPLE OF OPERATING
PLATFORM... 27
ANNEX 6 CROSS OPERATION PASSAGE SHIELD EXAMPLE... 34
ANNEX 7 WORDING EXPLANATION... 35
ADDITIONAL INFORMATION... 36
Technical Code for Safety of
High Altitude Operation of Building Construction
I General Provision
1.0.1 The standard is established for implementing the guideline of safety production in
high altitude operation during building construction, and for realizing definite safety
requirement, reasonable technique and economic applicability.
1.0.2 The standard is applicable to high altitude operations such as edge-near, hole,
climbing, hanging, operating platform and cross operations during the industrial and
civil building construction, and normal structures construction.
The standard is also applicable to others engineering construction needing high altitude
operations on all classes of hole, excavation, gutter, tank and so on.
1.0.3 So called high altitude operation in this standard should meet specifications "do
operation on the position where is 2 m (including 2 m)above the falling height base
level and it has falling possibility" specified by national standard "Classification of
Works at Heights" GB 3608-83.
1.0.4 High altitude operation should meet specifications related to relative national high
altitude operation and safety technique standard, besides this standard.
II General Rules
2.0.1 Technical safety measures and required materials and tools shall be listed in the
organization design of the engineering construction.
2.0.2 The a person in charge of the construction should preside over safety techniques
for high altitude operation in the engineering, and the corresponding responsibility
system should be established.
Gradual safety technique education and disclosure should be carried out before the
construction, and all technical safety measures process ands personnel protection items
should be put into effect. The construction shall not be processed without full
implementation.
2.0.3 Safety marks, tools, instruments, electric utility and all sorts of implements shall
be inspected, and they could be used after their sound condition is confirmed.
III Safety Protection for Edge-near and Opening Operation
3.1 Edge-near Operation
3.1.1 Protective measures should be taken for edge-near high altitude operation, and
should correspond with following specifications.
1 Guard rails should be emplaced at foundation trench periphery, at verandas that are
not emplaced with handrail or fence, material platform and raising platform periphery,
at non-external-falsework roofing and floor periphery and at water tank and water tower
periphery.
2.Safety protection net should be erected at the periphery of which second floor that its
first floor wall height exceed 3.2 m and at periphery which floor height exceed 3.2 m
without falsework.
3.Temporary guardrails should be emplaced for staircase heads staircase side in
flooring construction. Staircase head at top floor should be emplaced formal guard rails
with engineering structure process.
4.Guardrails should be emplaced on passages between headframe and construction
elevator, and falsework and building. Safety protection shed should be emplaced at
upper position of ground passage. the middle of double-cage headframe passage should
be separated and sealed.
5.For all sorts of vertical material receiving platforms, platform head should be
emplaced with safety gates or movable guard rails as well as guardrails on both sides.
3.1.2 Specifications and jointing requirements for edge-near guard rails members should
correspond with following specifications.
The little end effective diameter of bamboo rail should not be less than 70 mm. the
baluster tip diameter should not be less than 80 mm. steel wire which level is not less
than 16 should be used for binding balusters and binding circle number should not be
less than 3.there should be no slip in binding.
2.The upper bar top diameter of rough lumber rail should not be less than 70 mm. the
lower bar top diameter should not be less than 60 mm. and the baluster top diameter
should not be less than 75 mm. Wire nail with corresponding length should be used for
clenching or galvanized wire which level is not less than 12 should be used for banding,
and the surface should be smooth and steady.
3.The upper bar diameter of steel bar rail should not be less than 16mm, the lower bar
diameter should not be less than 14 mm. the baluster diameter should not be less than 18
mm. electric welding or galvanized wire should be used for fixing.
5.In case the external side of the edge are facing street, whole closing treatments such
as emplacing safety net and others reliable measures should be taken besides guard rails
are adopted.
3.1.4 Mechanics calculation and structural style of edge-near guard rails are detailed in
Annex 2.
3.2 Opening operation
3.2.1 When opening operation is taken,or others high altitude operations are taken at
opening where there are person or object falling hazard or personal safety hazard
because of project and procedure requirement, safeguard devices should be emplaced
according to following specifications.
1.Opening of broad or wall shall be emplaced with firm cover board, guard rail, safety
net or others falling-proof safeguard facilities.
2.Guard rails and fixing fence gate should be emplaced at the opening of the elevator
shaft; a safety net should be emplaced every 2 floors or at most 10 m.
3.Reinforced covering components should be emplaced at upper ports of pipe pile,
bored pile and so on, at upper ports of cup-shape and strip foundation, not-earth-filled
delve, and sight hole, scuttle and trapdoor.
4.Red light warning should be emplaced at night for all sorts of openings and holes,
besides safeguard facilities and safety marks are emplaced.
3.2.2 Measures such as emplacing guard rails, covering components, erecting safety net
and setting fence gate should be taken correspond with following requirements.
The...
......
Source: Translated/reviewed by www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked Questions
- 1. How long will the true-PDF of English version of JGJ80-1991 be delivered?
- The full copy PDF of English version of JGJ80-1991 can be downloaded in 9 seconds, and it will also be emailed to you in 3 minutes typically (double mechanisms to ensure the delivery reliably), with PDF-invoice.
- 2. Can I share the purchased PDF of JGJ80-1991 (English) with my colleagues?
- Yes. The purchased PDF of JGJ80-1991 (English) will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.
- 3. Does the price include tax/VAT?
- Yes. Our tax invoice includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries). Please see the List of Avoidance of Double Taxation Agreements (DTAs) signed between Singapore and 100+ countries.
- 4. Do you accept my currency other than USD?
- Yes. Visit www.ChineseStandard.us — JGJ80-1991. Click this link and select your country/currency to pay; the exact amount in your currency will be printed on the invoice. The full PDF and invoice will also be downloaded/emailed instantly, following platform Shopify.com's intuitive and self-explained procedure.
- 5. Should I purchase the latest version JGJ80-2016?
- Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize purchasing the latest version JGJ80-2016, even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all earlier versions technically.
How to Buy and Download a True PDF of JGJ80-1991 (English) in 9 Seconds
- Visit. Go to www.ChineseStandard.net/PDF.aspx/JGJ80-1991 (Master website, accepting USD only). For other currencies (EUR, KRW, JPY, GBP, AUD, CAD, etc.), please visit www.ChineseStandard.us/products/jgj80-1991, see Note 1.
- Search (Optional). Enter the keyword "JGJ80-1991" in the search bar, if it is not already shown.
- Add to Cart. Click "Add to Cart". You may repeat steps 2 and 3 to add up to 12 PDF documents per transaction.
- Payment Agent (Gateway). Select your preferred payment gateway ( www.Stripe.com or www.PayPal.com).
- Invoice. Customize your Tax Invoice by entering your email address and billing details.
- Checkout. Click the "Checkout" button.
- Payment. Complete your payment via Credit Card, PayPal, Google Pay, or Apple Pay (securely processed by/at Stripe.com or PayPal.com).
- Instant Access. Typical delivery time: Less than 9 seconds; see Note 2. Because we utilize real-time asynchronous Webhooks, your order is processed before you even return to our site.
- Download. On the Return Page, click "Download" button to enter into the dedicated download page for securely accessing itemized PDF and Tax Invoice. See Note 3.
- Verification (USD 1.00 Trial). Want to experience our lightning-fast delivery first? Click here to purchase GB 38031-2020 for only USD 1.00 (the minimum checkout amount) to test the full 9-second procedure.
Visual Step-by-Step Screenshots
Reference guide for the steps above (with flowchart): Steps 1~9
Notes and Explanations
Note 1: www.ChineseStandard.us/products/jgj80-1991 is hosted on well-known platform www.Shopify.com. Although the Shopify's purchasing procedure is different, it is deemed as intuitive and self-explained, both PDF and invoice can also be downloaded instantly after the payment.
Note 2: Our "9-second delivery" is powered by the Webhook protocol (first conceptualized by Jeff Lindsay in 2007). Like lightning arriving before thunder, our backend receives your payment confirmation via the 'Technical Edge' before your browser even finishes the redirect (your browser returns to www.ChineseStandard.net from the payment gateway).
Note 3: If you are unable to redirect back to our Return Page, do not worry. Additionally and independently, our automated system will still deliver your PDF and Invoice via email (the second mechanism to ensure the delivery), typically within 3 minutes. Once your payment is complete, you have two instant ways to access your PDF and invoice: you may stay on the Return Page for download in 9 seconds typically, or simply check your email inbox where a copy is automatically delivered in 3 minutes typically.