HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (6 Oct 2024)

GB/T 6113.103-2021 PDF in English


GB/T 6113.103-2021 (GB/T6113.103-2021, GBT 6113.103-2021, GBT6113.103-2021)
Standard IDContents [version]USDSTEP2[PDF] delivered inName of Chinese StandardStatus
GB/T 6113.103-2021English410 Add to Cart 0-9 seconds. Auto-delivery. Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-3: Radio disturbance and immunity measuring apparatus - Ancillary equipment - Disturbances power Valid
GB/T 6113.103-2008English170 Add to Cart 0-9 seconds. Auto-delivery. Specification for radio disturbance and immunity measuring apparatus and methods -- Part 1-3: Radio disturbance and immunity measuring apparatus -- Ancillary equipment -- Disturbances power Obsolete
Standards related to (historical): GB/T 6113.103-2021
PDF Preview

GB/T 6113.103-2021: PDF in English (GBT 6113.103-2021)

GB/T 6113.103-2021 GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 33.100 CCS L 06 GB/T 6113.103-2021 / CISPR 16-1-3:2016 Replacing GB/T 6113.103-2008 Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-3: Radio disturbance and immunity measuring apparatus - Ancillary equipment - Disturbances power (CISPR 16-1-3:2016, IDT) ISSUED ON: MAY 21, 2021 IMPLEMENTED ON: DECEMBER 01, 2021 Issued by: State Administration for Market Regulation; Standardization Administration of the PRC. Table of Contents Foreword ... 3  Introduction ... 7  1 Scope ... 8  2 Normative references ... 8  3 Terms, definitions and abbreviations ... 9  3.1 Terms and definitions ... 9  3.2 Abbreviations ... 9  4 Absorbing clamp instrumentation ... 9  4.1 Introduction ... 9  4.2 The absorbing clamp assembly ... 10  4.3 The absorbing clamp assembly calibration methods and their relations ... 13  4.4 The secondary absorbing device ... 15  4.5 The absorbing clamp test site (ACTS) ... 16  4.6 Quality assurance procedures for the absorbing clamp instrumentation ... 18  Annex A (Informative) Construction of the absorbing clamp (Subclause 4.2) 23  Annex B (Normative) Calibration and validation methods for the absorbing clamp and the secondary absorbing device (Clause 4) ... 26  Annex C (Normative) Validation of the absorbing clamp test site (Clause 4) . 36  Bibliography ... 39  Foreword This document is drafted in accordance with GB/T 1.1-2020 "Directives for standardization - Part 1: Rules for the structure and drafting of standardizing documents". GB/T(Z) 6113 "Specification for radio disturbance and immunity measuring apparatus and methods" is the basic standard of electromagnetic compatibility. This document is Part 1-3 of GB/T(Z) 6113. GB/T(Z) 6113 has issued the following parts: Part 1: Radio disturbance and immunity measuring apparatus - Part 1-1: Radio disturbance and immunity measuring apparatus - Measuring apparatus; - Part 1-2: Radio disturbance and immunity measuring apparatus - Coupling devices for conducted disturbance measurements; - Part 1-3: Radio disturbance and immunity measuring apparatus - Ancillary equipment - Disturbances power; - Part 1-4: Radio disturbance and immunity measuring apparatus - Antennas and test sites for radiated disturbance measurements; - Part 1-5: Radio disturbance and immunity measuring apparatus - Antenna calibration sites and reference test sites for 5 MHz to 18 GHz; - Part 1-6: Radio disturbance and immunity measuring apparatus - EMC antenna calibration. Part 2: Methods of measurement of disturbances and immunity - Part 2-1: Methods of measurement of disturbances and immunity - Conducted disturbance measurements; - Part 2-2: Methods of measurement of disturbances and immunity - Measurement of disturbance power; - Part 2-3: Methods of measurement of disturbances and immunity - Radiated disturbance measurements; - Part 2-4: Methods of measurement of disturbances and immunity - Immunity measurements; - Part 2-5: In situ measurements of disturbing emissions produced by physically large equipment. Part 3: CISPR technical reports - Part 3: CISPR technical reports. Part 4: Uncertainties, statistics and limit modelling - Part 4-1: Uncertainties, statistics and limit modelling - Uncertainties in standardized EMC tests; - Part 4-2: Uncertainties, statistics and limit modelling - Measurement instrumentation uncertainty; - Part 4-3: Uncertainties, statistics and limit modelling - Statistical considerations in the determination of EMC compliance of mass- produced products; - Part 4-4: Uncertainties, statistics and limit modelling - Statistics of complaints and a model for the calculation of limits; - Part 4-5: Uncertainties, statistics and limit modelling - Conditions for the use of alternative test methods. This document replaces GB/T 6113.103-2008 "Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-3: Radio disturbance and immunity measuring apparatus - Ancillary equipment - Disturbances power". Compared with GB/T 6113.103-2008, in addition to structural adjustments and editorial changes, the main technical changes are as follows: - Update the normative references (see Clause 2; Clause 2 of the 2008 edition); - Delete the abbreviation "reference conversion factor" (see 3.2 of the 2008 edition); - Delete the content related to the "reference device method" (see 4.3 of the 2008 edition); - Modify Figures B.3 and B.4 (see Annex B; Annex B of the 2008 edition); - Add Figure B.5b) (see Annex B). This document, using translation method, is identical to CISPR 16-1-3:2016 "Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-3: Radio disturbance and immunity measuring apparatus - Ancillary equipment - Disturbance power". China’s documents which have a consistent correspondence with the international documents normatively referenced in this document are as follows: - GB/T 6113.102-2018 Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-2: Radio disturbance and immunity measuring apparatus - Coupling devices for conducted disturbance measurements (CISPR 16-1-2:2014, IDT) - GB/T 6113.202-2018 Specification for radio disturbance and immunity measuring apparatus and methods - Part 2-2: Methods of measurement of disturbances and immunity - Measurement of disturbance power (CISPR 16-2-2:2010, IDT) - GB/T 6113.402-2018 Specification for radio disturbance and immunity measuring apparatus and methods - Part 4-2: Uncertainties, statistics and limit modelling - Measurement instrumentation uncertainty (CISPR 16-4- 2:2014, IDT) The following editorial change has been made to this document: - In order to facilitate the reader's citation, change the CISPR NSA in the international standard B.2.1.1 to reference to the GB/T 6113.104-2016 NSA requirements and include it in Clause 2. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. The issuing authority of this document shall not be held responsible for identifying any or all such patent rights. This document was proposed by and shall be under the jurisdiction of National Technical Committee 79 on Radio Interference of Standardization Administration of China (SAC/TC 79). Drafting organizations of this document: China Electronics Standardization Institute; Suzhou 3ctest Electronic Co., Ltd.; National Institute of Metrology, China; Xiamen H-noble Scientific Instruments Co., Ltd.; Beijing Zhinan Technology Co., Ltd.; China National Accreditation Service for Conformity Assessment; China Household Electric Appliance Research Institute; The Fifth Electronics Research Institute of the Ministry of Industry and Information Technology; Southeast University; Beijing TIRT Technology Service Co., Ltd.; ATS Technology Limited.; Dalian Inspection Research Institute of Product Quality Co., Ltd.; Jiangsu Electronic Information Product Quality Supervision & Inspection Institute; GZ CHANGEN Electronic Technology Co., Ltd.; Zhejiang Noyetec Technology Co., Ltd.; China Automotive Engineering Research Institute Co., Ltd.; CEPREI Calibration & Testing Center; Ningbo Customs Technology Center; Jiangsu Institute of Metrology; CVC Certification & Testing Co., Ltd.; Guangdong CQC South China Testing Technology Co., Ltd.; Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-3: Radio disturbance and immunity measuring apparatus - Ancillary equipment - Disturbances power 1 Scope This document specifies the characteristics and calibration of the absorbing clamp for the measurement of radio disturbance power in the frequency range 30 MHz to 1 GHz. 2 Normative references The contents of the following documents, through normative references in this text, constitute indispensable provisions of this document. Among them, for dated references, only the edition corresponding to that date applies to this document. For undated references, the latest edition (including all amendments) applies to this document. GB/T 4365-2003  Electrotechnical terminology - Electromagnetic compatibility [IEC 60050(161):1990+A1:1997+A2:1998, IDT] GB/T 6113.104-2016 Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-4: Radio disturbance and immunity measuring apparatus - Antennas and test sites for radiated disturbance measurements (CISPR 16-1-4:2012, IDT) CISPR 16-1-2:2003 Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-2: Radio disturbance and immunity measuring apparatus - Ancillary equipment - Conducted disturbances CISPR 16-2-2:2003 Specification for radio disturbance and immunity measuring apparatus and methods - Part 2-2: Methods of measurement of disturbances and immunity - Measurement of disturbance power CISPR 16-4-2 Specification for radio disturbance and immunity measuring apparatus and methods - Part 4-2: Uncertainties, statistics and limit modelling - Measurement instrumentation uncertainty ......
 
Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.