HOME   Cart(2)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

CCAP-GZ-5101-2020 PDF English

US$705.00 · In stock · Download in 9 seconds
CCAP-GZ-5101-2020: Detailed Implementation Rules for China Compulsory Certification - Interior trim parts of Motor vehicle
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
CCAP-GZ-5101-2020English705 Add to Cart 0-9 seconds. Auto-delivery Detailed Implementation Rules for China Compulsory Certification - Interior trim parts of Motor vehicle

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: CCAP-GZ-5101-2020
      

Similar standards

CCAP-GZ-5561   CNCA-No10   CCAP-GZ-6105   

CCAP-GZ-5101-2020: Detailed Implementation Rules for China Compulsory Certification - Interior trim parts of Motor vehicle


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/CCAP-GZ-5101-2020
Document Name. Interior trim parts of Motor vehicle Serial No.. CCAP-GZ-5101.2020 Implementation Rules for CCAP Mark Certification of Motor Vehicle Products Interior trim parts of Motor vehicle Issued on. JULY 01, 2020 Implemented on. JULY 01, 2020 China Certification Centre for Automotive Products Document Name. Interior trim parts of Motor vehicle

Table of Contents

0 Introduction... 5 0.1 Terms and Definitions... 5 0.2 Manufacturing enterprises classification management requirements... 5 0.3 Requirements on utilizing the manufacturing enterprise test resources... 7 1 Application scope... 8 2 Certification basis and standards... 8 3 Certification mode selection and relevant requirements... 9 3.1 Basic certification modes... 9 3.2 Applicability of certification mode... 9 4 Classification of certification unit... 9 5 Certification entrusting... 10 5.1 Certification process... 10 5.2 Certification entrusting materials... 10 5.3 Certification plan and certification contract... 12 6 Certification implementations... 12 6.1 Type test... 12 6.2 Initial factory inspection... 17 6.3 Certification evaluation and decision... 20 6.4 Time-limit of certification... 20 6.5 Maintenance parts of vehicle-models out of production... 20 7 Post-certification supervision... 20 7.1 Post-certification follow-up inspection... 21 7.2 Production on-site sampling test or inspection... 22 7.3 Market sampling test or inspection... 22 7.4 Frequency and time of post-certification supervision... 23 7.5 Record of post-certification supervision... 23 7.6 Evaluation of post-certification supervision result... 23 8 Certificate... 24 8.1 Maintenance of certificate... 24 8.2 Content of certificate... 24 8.3 Change of certificate... 24 8.4 Cancellation, suspension and withdrawal of certificate... 25 8.5 Use of certificate... 25 9 Certification marks... 25 9.1 Mark style permitted to use... 25 9.2 Use requirements... 26 10 Charges... 26 11 Certification responsibilities... 26 12 Process and time-limit requirements related to technical disputes, complaints and appeal... 27 Attachment 1 -- Description of interior trim parts of motor vehicles... 28 Attachment 2 �C Production conformity requirements... 30 Appendix 1 -- Factory quality assurance ability requirements... 33 Attachment 3 -- Compilation requirements of production conformity control plan and Document Name. Interior trim parts of Motor vehicle implementation report... 39 Appendix 1 -- Recommended format of production conformity control plan... 43 Attachment 4 -- Implementation of certification of after-sales repair spare parts for discontinued models... 46 Attachment 5 �C Type test items... 48

1 Application scope

This Rules is applicable to interior trim parts made of organic materials or organic composite materials used on motor vehicles.

2 Certification basis and standards

GB 8410-2006, Flammability of automotive interior materials GB 38262-2019, Flammability of interior materials for buses GB 24407-2012, The safety technique specifications of special school bus In principle, the above standard shall be the latest version issued by the national Document Name. Interior trim parts of Motor vehicle standardization administrative department. When other versions of the standard are to be used, they shall be in accordance with the announcement, which is applicable to relevant standards, issued by CCAP.

3 Certification mode selection and relevant requirements

3.1 Basic certification modes Basic certification mode is.

4 Classification of certification unit

In principle, the interior trim parts produced by the same-producer (manufacturer) and same manufacturing enterprise (location), and having no significant difference in the following aspects could be classified as one certification unit.

5 Certification entrusting

5.1 Certification process 5.2 Certification entrusting materials The certification client shall pot forward the entrusting to CCAP. The materials and technical data that shall be submitted include. 5.3 Certification plan and certification contract CCAP shall review the application materials. If the application materials need to be supplemented or improved, it shall communicate with the client and require supplementing and submitting relevant materials. After the review completes, it shall issue a notice of acceptance or not-acceptance to the client. After accepting the application, CCAP shall formulate a certification plan according to the audit result, which includes.

6 Certification implementations

6.1 Type test 6.1.1 Type test plan Document Name. Interior trim parts of Motor vehicle CCAP shall formulate the product inspection plan after reviewing the materials. The inspection plan includes requirements and quantity of all samples, the inspection standard, inspection items, and information of the designated labs that can be selected by the certification client. 6.1.2 Sample requirements of type test In principle, in the type test, the certification client shall send the samples to the designated lab for testing. When necessary, CCAP can conduct sampling for the testing according to the type test plan. 6.1.3 Type test items See Annex 5 of this Rules for type test items. 6.1.4 Selection and confirmation of the designated lab The certification client can select a lab among the designated inspection labs provided by CCAP for the certification products. According to the client��s confirmation, CCAP shall give inspection commission to the selected lab to conduct type test. 6.1.5 Implementation of type test 6.1.6 Type test report After the type test finishes, the lab shall issue a type test report to CCAP. The report shall include product description within the application unit, and relevant certification information. After the certification completes, CCAP shall send the type test report, together with the certificate, to the certification client (or certification decision). The certification client shall ensure to provide the complete and effective type test report to CCAP and law-enforcement agencies during post-certification supervision. 6.2 Initial factory inspection Initial factory inspection is an assessment conducted by CCAP on whether the enterprise��s production conformity control system meets the certification requirements. It is conducted in the mode of ��production conformity control plan inspection + production conformity factory on-site inspection��. 6.2.1 Basic principle The manufacturer and the manufacturing enterprise shall establish, implement and maintain the production conformity control system according to requirements specified in Attachment 2 and Attachment 3 so as to ensure that the certification-products can meet the certification requirements continuously. CCAP shall check production conformity control system of the enterprise. In principle, the initial factory inspection shall be completed within a year after passing the type test. Otherwise, product type test shall be made again, in principle, the initial inspection shall cover the products applied for certification/certification-products and the processing sites. ��Processing sites�� refer to all departments, sites, personnel and activities. 6.2.2 Production conformity control plan auditing The manufacturer or the manufacturing enterprise shall submit the production conformity control plan to CCAP for auditing. CCAP shall inform the certification client of the review result. 6.2.3 Production conformity factory on-site inspection In general, after the type test and the production conformity control plan auditing are qualified, CCAP shall conduct factory on-site inspection. 6.2.3.1 Principles for production conformity factory on-site inspection Document Name. Interior trim parts of Motor vehicle 6.2.3.2 Production conformity inspection and specified on-site test During factory on-site inspection, the inspection team shall randomly draw samples of the products at the end of the production line or among qualified products in the warehouse. The inspection items include but are not limited to the follows. 6.2.3.3 ODM mode manufacturing enterprise inspection It shall be conducted according to relevant document requirements of CCAP. When conducting on-site inspection of ODM producer (manufacturer), the number of inspection man-day shall not be longer than 0.5 man-days. 6.2.3.4 Result of the initial factory inspection For initial factory inspection, the inspection conclusions are divided into 3 types. ��factory inspection is PASS��, ��there are non-conformance items, it is PASS after rectification��, and ��factory inspection is NOT-PASS��. In which, Conditions of each conclusion are as follows. 6.2.3.5 Notification of the factory inspection conclusion After the factory inspection finishes, the inspection team shall inform the enterprise of the inspection result. If there are non-conformity items founded, it shall give the verification mode (such as paper verification or on-site verification) and clear requirements of rectification time-limit. And also inform the manufacturing enterprise of the verification result in time. When the conclusion of inspection result of the on-site inspection team is changed after it is assessed by CCAP, then CCAP shall in time notify the manufacturing enterprise of the conclusion. 6.3 Certification evaluation and decision CCAP conducts comprehensive assessment of the type test result, the initial factory inspection result and relevant materials/information. If the evaluation is PASS, the certificate shall be granted according to certification unit. If not, the certification is terminated. 6.4 Time-limit of certification Time-limit of certification refers to the period FROM the date when CCAP accepts the entrusting TO the date when the certificate is issued.

7 Post-certification supervision

Post-certification supervision refers to that the certification body conducts supervision to the certification-products and the manufacturing enterprise. The supervision method is one of or combination of the following three modes - post- certification follow-up factory inspection, production on-site sampling test, and market sampling test. 7.1 Post-certification follow-up inspection 7.1.1 Principles of post-certification follow-up inspection CCAP shall conduct effective follow-up inspection to the certification-products and the manufacturing enterprise based on the manufacturing enterprise classification management, so as to verify that manufacturing enterprise��s quality assurance capacity continuously meets the certification requirements; ensure the certified product continuously meets the certification requirements; and maintain the conformity with type test samples. 7.1.2 Content of post-certification follow-up inspection 7.2 Production on-site sampling test or inspection 7.2.1 Principles of production on-site sampling Test or inspection If production on-site sampling inspection or test method is adopted for post- certification supervision, then the certification client, manufacturer and manufacturing enterprise shall cooperate. 7.2.2 Content of production on-site sampling test or inspection In principle, different unit/models of products shall be drawn as samples for each time of supervision. CCAP formulate the sampling inspection plan according to the enterprise classification principles and features of the products. For the inspection items, all or several of the type test inspection items shall be inspected. 7.3 Market sampling test or inspection According to situations of the enterprise classification management and the Document Name. Interior trim parts of Motor vehicle 7.4 Frequency and time of post-certification supervision See Table 4 for frequency of post-certification supervision. In non-continuous production, the certification client and the manufacturing enterprise shall actively submit the production plan to CCAP in order to ensure effective implementation of the post-certification supervision. 7.5 Record of post-certification supervision CCAP shall make appropriate record of the whole process of post-certification supervision and archive it on file in order to ensure the traceability of the certification process and the result. 7.6 Evaluation of post-certification supervision result CCAP shall conduct a comprehensive assessment to the follow-up inspection result, the sampling inspection result and relevant materials. If it passes the assessment, the certificate can be kept and the certification mark can be continuously used; if it fails in the assessment, CCAP shall handle with suspension or withdrawal of the certificate according the corresponding situation; and an announcement shall be issued. Document Name. Interior trim parts of Motor vehicle

8 Certificate

8.1 Maintenance of certificate This Rules covers the 5-year valid period of product certificate. Within the valid period, the validity of the certificate is maintained by depending on the ��post- certification supervision�� of CCAP. Before the certification is expired, if it needs to continue to use, entrusting client shall put forward the certification entrusting within 90 days before the expiry date. If the newest post-certification supervision, within the certificate validity, is PASS, then the certificate shall be directly renewed. 8.2 Content of certificate If the certified product and selling package are printed with the content contained in the certificate, it shall be consistent with the content in the certificate. 8.3 Change of certificate 8.3.1 Change of certification requirements (including standard change- version) 8.4 Cancellation, suspension and withdrawal of certificate Certificate��s cancellation, suspension and withdrawal shall be implemented in accordance with relevant provisions of ��Certificate cancellation, suspension and withdrawal implementation rules��. CCAP shall adopt appropriate way to publicly announce the certificate of cancellation, suspension and withdrawal. 8.5 Use of certificate Use of the certificate shall comply with the requirements of ��Certificate and certification mark management regulations��.

9 Certification marks

If the certified organization uses the certification mark, it shall comply with the requirements of CCAP "Certificate and certification mark management regulations". 9.1 Mark style permitted to use The certified interior trim parts of motor vehicles shall use safety-type (S) certification mark. The style is as follows. Document Name. Interior trim parts of Motor vehicle It is allowed to use a deformed CCAP mark style, that is, the mark word "CCAP". 9.2 Use requirements The certification marks shall be permanently preserved. They shall be clearly visible without damaging vehicles and certified products. It shall use CCAP certification mark printed/molded with non-standard specifications. The mark shall be printed/molded on the outer surface of the vehicle interior or its smallest outer packaging. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of CCAP-GZ-5101-2020 be delivered?

Answer: The full copy PDF of English version of CCAP-GZ-5101-2020 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of CCAP-GZ-5101-2020_English with my colleagues?

Answer: Yes. The purchased PDF of CCAP-GZ-5101-2020_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- CCAP-GZ-5101-2020 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of CCAP-GZ-5101-2020?

A step-by-step guide to download PDF of CCAP-GZ-5101-2020_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "CCAP-GZ-5101-2020".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9