|
US$439.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 36956-2018: Testing of voltage sourced converter valve base control unit for high-voltage direct current power transmission using voltage sourced converters Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 36956-2018 | English | 439 |
Add to Cart
|
4 days [Need to translate]
|
Testing of voltage sourced converter valve base control unit for high-voltage direct current power transmission using voltage sourced converters
| Valid |
GB/T 36956-2018
|
PDF similar to GB/T 36956-2018
Basic data | Standard ID | GB/T 36956-2018 (GB/T36956-2018) | | Description (Translated English) | Testing of voltage sourced converter valve base control unit for high-voltage direct current power transmission using voltage sourced converters | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K46 | | Classification of International Standard | 29.200 | | Word Count Estimation | 22,218 | | Date of Issue | 2018-12-28 | | Date of Implementation | 2019-07-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 36956-2018: Testing of voltage sourced converter valve base control unit for high-voltage direct current power transmission using voltage sourced converters ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Testing of voltage sourced converter valve base control unit for high--voltage direct current power transmission using voltage sourced converters
ICS 29.200
K46
National Standards of People's Republic of China
Valve base control of voltage source converter for flexible direct current transmission
Equipment test
Published on.2018-12-28
2019-07-01 implementation
State market supervision and administration
China National Standardization Administration issued
Content
Foreword III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 2
4 test sample (test sample) requirement 2
4.1 Basic requirements 2
4.2 Functional Requirements 3
4.3 Performance Requirements 3
4.4 Interface Requirements 3
5 type test 4
5.1 Electromagnetic Compatibility Test 4
5.2 Environmental Test 6
5.3 Mechanical performance test 7
5.4 Insulation performance test 7
6 Factory test 8
6.1 Overview 8
6.2 Appearance inspection 8
6.3 Power-on test 8
6.4 Environmental Test 8
6.5 Insulation test 8
7 joint test 8
7.1 Overview 8
7.2 Overall power-on test 8
7.3 Communication test 9
7.4 Startup test 11
7.5 Outage test 11
7.6 Sub-module capacitor voltage balance control test 11
7.7 Circulation suppression test 11
7.8 Response duty system switching test 11
7.9 Submodule Failure and Protection Test 11
7.10 Valve base control equipment detection valve failure protection test 12
7.11 Valve base control equipment detection valve leakage fault test 12
7.12 Valve-based control equipment power supply reliability test 12
7.13 Long-term stable operation test of valve-based control equipment 13
8 On-site handover test 13
8.1 Overview 13
8.2 Visual inspection 13
8.3 wiring check 13
8.4 Power Check 13
Reference 15
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed by the China Electrical Equipment Industry Association.
This standard is under the jurisdiction of the National Power Electronics System and Equipment Standardization Technical Committee (SAC/TC60).
This standard was drafted. Global Energy Internet Research Institute Co., Ltd., China Southern Power Grid Science Research Institute Co., Ltd., Xi'an Power
Institute of Electronic Technology, Xi'an High Voltage Electric Apparatus Research Institute Co., Ltd., Xi'an Xidian Power System Co., Ltd., China Southern Power Grid Co., Ltd.
Responsible company EHV transmission company test and maintenance center, Xuji Group Co., Ltd., TBEA Xinjiang New Energy Co., Ltd., Xi'an
Xidian Electric Research Institute Co., Ltd., State Grid Jiangsu Electric Power Company, State Grid Sichuan Electric Power Research Institute.
The main drafters of this standard. Pang Hui, Liu Dong, Rao Hong, Wei Hongqi, Yang Xiaohui, Tu Xiaogang, Tang Jinkun, Xie Minhua, Zhu Xi, Zhang Jinbo, Wen An,
Yan Lifeng, Wei Chengzhi, Xu Shuzhen, Lin Weixing, Sheng Junyi, Zhang Teng, Fan Weiqiang, Xu Zimeng, Tong Congwei, Shi Mingming, Yuan Jianhua, Gan Degang,
Liu Longchen, Dong Tianhua, Hu Wei.
Valve base control of voltage source converter for flexible direct current transmission
Equipment test
1 Scope
This standard specifies the type test of the voltage source converter valve base control equipment (hereinafter referred to as valve base control equipment) for flexible DC transmission.
Test requirements and methods related to factory test, joint test and on-site handover test.
This standard applies to modular multi-level converter valve-based control equipment.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2423.1-2008 Environmental testing of electric and electronic products - Part 2. Test methods Test A. Low temperature
GB/T 2423.2-2008 Environmental testing of electrical and electronic products - Part 2. Test methods Test B. High temperature
GB/T 2423.4-2008 Environmental testing of electrical and electronic products - Part 2. Test methods Test Db. alternating heat (12h)
12h cycle)
GB/T 2423.5-1995 Environmental testing for electric and electronic products - Part 2. Test methods Test Ea and guide. Impact
GB/T 2423.6-1995 Environmental testing for electric and electronic products - Part 2. Test methods Test Eb and guide. Collision
GB/T 2423.10-2008 Environmental testing of electric and electronic products - Part 2. Test method test Fc. Vibration (sinusoidal)
GB/T 2423.22-2012 Environmental testing - Part 2. Test methods Test N. Temperature change
GB/T 2887-2011 General specification for electronic computer venues
GB/T 7261-2016 Basic test method for relay protection and safety automatic devices
GB/T 9361-2011 Computer Site Safety Requirements
Electrical relays - Part 5. Insulation coordination requirements and tests for measuring relays and protective devices
GB/T 17626.2-2006 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test
GB/T 17626.3-2016 Electromagnetic compatibility test and measurement technology RF electromagnetic field radiation immunity test
GB/T 17626.4-2018 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test
GB/T 17626.5-2008 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test
GB/T 17626.6-2017 Electromagnetic compatibility test and measurement technology Conducted disturbance immunity of RF field induction
GB/T 17626.8-2006 Electromagnetic compatibility test and measurement technology Power frequency magnetic field immunity test
GB/T 17626.9-2011 Electromagnetic compatibility test and measurement technology Pulse magnetic field immunity test
GB/T 17626.10-2017 Electromagnetic compatibility test and measurement technique Damping oscillating magnetic field immunity test
GB/T 17626.12-2013 Electromagnetic compatibility test and measurement technology ringing wave immunity test
GB/T 17626.29-2006 Electromagnetic compatibility test and measurement technology DC power input port voltage dip, short interruption and
Immunity test for voltage changes
GB/T 30553-2014 High-voltage direct current transmission based on voltage source converter
GB/T 34118-2017 Voltage source converter terminology for high voltage DC systems
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 36956-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 36956-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 36956-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 36956-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|