|
US$209.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 24471-2009: General technical requirements of spring assembling machine Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 24471-2009 | English | 209 |
Add to Cart
|
3 days [Need to translate]
|
General technical requirements of spring assembling machine
| Valid |
GB/T 24471-2009
|
PDF similar to GB/T 24471-2009
Basic data | Standard ID | GB/T 24471-2009 (GB/T24471-2009) | | Description (Translated English) | General technical requirements of spring assembling machine | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | J26 | | Classification of International Standard | 21.160 | | Word Count Estimation | 9,932 | | Date of Issue | 2009-10-15 | | Date of Implementation | 2010-03-01 | | Quoted Standard | GB/T 191; GB/T 3768-1996; GB 2556.1-2008; GB/T 6388; GB/T 13306; GB/T 13384; GB 18209.2; QB/T 1588.4 | | Regulation (derived from) | National Standard Approval Announcement 2009 No.11 (Total No.151) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the terms and definitions string spring machine, marking, requirements, test methods, inspection rules and signs, packaging, transport and storage. This standard applies to a single spring spring assembly together with a string of equipment. |
GB/T 24471-2009: General technical requirements of spring assembling machine---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
General technical requirements of spring assembling machine
ICS 21.160
J26
National Standards of People's Republic of China
Technical conditions of the spring series
Posted 2009-10-15
2010-03-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
The standard proposed by China Machinery Industry Federation.
The standard spring by the National Standardization Technical Committee (SAC/TC235) centralized.
This standard is drafted by. Foshan source-bedding Machinery Co., Ltd., machine Productivity Promotion Center.
Participated in the drafting of this standard. Nanhai District of Foshan City, Standardization Research and Promotion Center, Chengdu eighty-one Furniture Co., Ltd., Jinan Great
Science, Foshan City to the Austrian Technology Industrial Limited.
The main drafters of this standard. Li Deqiang, Jiang Ying Pang
Male, Qian Lu Ping, Liu Huan Zhu, Cui Jin Alliance, Wangsi Hua, Liu Ning, Yang, Chao full,
Peng boat.
Technical conditions of the spring series
1 Scope
This standard specifies the terms and definitions of the string of spring, marks, requirements, test methods, inspection rules and signs, packaging, transportation,
Storage.
This standard applies to the single spring assembled together by string spring strip device.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
All amendments (not including errata content) or revisions do not apply to this standard, however, encourage an agreement in accordance with this standard
Whether the parties can study the latest versions of these documents. For undated reference documents, the latest versions apply to this
standard.
GB/T 191 Packaging - Pictorial signs (GB/T 191-2008, ISO 780.1997, MOD)
GB/T 3768-1996 Determination of sound pressure of sound power levels of noise sources using an enveloping surface reflectance measuring surface Simple Method
(EqvISO 3746.1995)
GB 5226.1-2008 Safety of machinery electrical equipment Part 1. General requirements (IEC 60204-1.2005,
IDT)
GB/T 6388 transport package shipping mark
GB/T 13306 signs
GB/T 13384 mechanical and electrical products packaging General technical conditions
GB 18209.2 Safety of machinery - Indication, marking and actuation - Part 2. Requirements for marking (GB 18209.2-2000, idtIEC
61310-2.1995)
QB/T 1588.4 Light Industry Machinery paint general technical conditions
3 Terms and Definitions
The following terms and definitions apply to this standard.
3.1
The spring in rows connected by a string of elastomeric spring strip.
3.2
For series helical springs wire springs elastomer.
3.3
After each row of spring series is completed, and cut off the spiral spring string strip, which closed flat at both ends of the clamping ring, so that spring string strip closely connected with the spring, and string
Spring strip can not move freely in and out in the spring.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 24471-2009_English be delivered?Answer: Upon your order, we will start to translate GB/T 24471-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 24471-2009_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 24471-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|