US$229.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB 26783-2011: Fire rescue lighting line Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB 26783-2011 | English | 229 |
Add to Cart
|
3 days [Need to translate]
|
Fire rescue lighting line
| Valid |
GB 26783-2011
|
PDF similar to GB 26783-2011
Basic data Standard ID | GB 26783-2011 (GB26783-2011) | Description (Translated English) | Fire rescue lighting line | Sector / Industry | National Standard | Classification of Chinese Standard | C85 | Classification of International Standard | 13.220.10 | Word Count Estimation | 10,192 | Date of Issue | 2011-07-20 | Date of Implementation | 2011-11-01 | Quoted Standard | GB/T 191; GB/T 2423.1; GB/T 2423.2; GB/T 2423.4; GB 3836.1; GB 7000.1 | Regulation (derived from) | Announcement of Newly Approved National Standards No. 10 of 2011 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This Chinese standard specifies the line of fire rescue lighting terms and definitions, models, technical requirements, test methods, inspection rules, marking, packaging, transport and storage. This standard applies to a power supply system for fire rescue lighting line. |
GB 26783-2011: Fire rescue lighting line---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Fire rescue lighting line
ICS 13.220.10
C85
National Standards of People's Republic of China
Fire rescue illumination line
Issued on. 2011-07-20
2011-11-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
The standard 5.2 to 5.13,8.1.1 mandatory, the rest are recommended.
This standard is prepared in accordance with GB/T 1.1-2009 given rules.
The standard proposed by the People's Republic of China Ministry of Public Security.
This standard by the National Standardization Technical Committee appliances Fire Fire accessories Technical Committee (SAC/TC113/SC5) centralized.
This standard was drafted. Shanghai Fire Research Institute of Ministry of Public Security.
Drafters of this standard. Shen Jian Min, Zhu Rong, Zhang Yan, Zhang Yan, Li Rui Kun, Ge Liang.
Fire rescue illumination line
1 Scope
This standard specifies the terms and definitions fire rescue illumination line, models, technical requirements, test methods, inspection rules, marking, packaging, transport
Transport and storage.
This standard is applicable to the power supply system of fire rescue illumination line.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 191 Packaging - Pictorial signs
GB/T 2423.1 Environmental testing for electric and electronic products Part 2. Test methods Test A. Cold
GB/T 2423.2 Environmental testing for electric and electronic products Part 2. Test methods Test B. Dry heat
GB/T 2423.4 Environmental testing for electric and electronic products Part 2. Test methods - Test Db Damp (12h 12h cycle)
GB 3836.1 explosive atmospheres - Part 1. General requirements for equipment
GB 7000.1 Luminaires - Part 1. General requirements and tests
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Fire smoke and other visibility in low ambient place for directing light hair escape route from the power supply system, light body hair, winding wheel
And other components.
4 Model
Fire life-saving lighting line (hereinafter referred to as the illumination line) model preparation should meet the following requirements.
JZ
Product Category Code (JZ represents illumination line)
Life-saving lighting line parameter length in meters (m)
Power supply. J indicates AC, Z represents a DC power supply
- □
Explosion Class. B expressed an explosion-proof, explosion-proof performance without omitting
Luminescent type. C represents steady type, S-type indicates flashing
Example. JZ50J-BC represents the length of AC power line with explosion-proof lighting steady performance of 50m.
5 Technical requirements
5.1 Appearance
5.1.1 Lighting cable line of the body surface should be smooth and free of scratches, the insulating layer intact.
5.1.2 Lighting cable winding wheel should be flexible rotation, no jamming phenomenon, the surface no obvious manufacturing defect or mechanical scratch.
5.1.3 Lighting power distribution box line operating switch should be flexible and reliable, clear instructions panel, connectors good contact, no loosening.
5.2 emission luminance
In the continuous working time, brightness illumination line shall not be less than 10cd/m2.
5.3 flicker frequency
Flashing lighting line flicker frequency should be 1Hz ~ 2Hz.
5.4 Quality
Lighting wire line weight should not exceed 13kg.
5.5 guiding function
Lighting should have a guiding function line, body line intervals (2 ± 0.1) m should have a visible direction signs.
5.6 Insulation resistance
Lighting wire line body surface and the insulation resistance between conductors shall be not less than 50MΩ.
5.7 Compressive strength
Lighting powered by the AC power line, between the external terminals and the charging distribution box housing should be able to withstand the compressive strength test specified in 6.7, the test
It should be no breakdown, flashover.
5.8 Tensile Properties
Lighting wire line body should be able to withstand the tension of not less than 300N. After the test according to the provisions of 6.8, line body and a light source should be no damage, lighting should line
It can work.
5.9 compression performance
After lighting line compression test according to the provisions of 6.9, line body and a light source should be no damage, light line should be able to work properly.
5.10 Waterproof
After lighting line according to the provisions of 6.10 waterproof test, it should be able to work properly.
5.11 maximum surface temperature
In a continuous working hours, lighting wire line surface temperature should not exceed 60 ℃.
5.12 resistant to climate adaptation
Weather-resistant body according to ambient lighting line lines specified in Table 1 of the test, after the test illumination line line of the body should be no adhesion, embrittlement, illumination line should
It can work.
Table 1 weathering test environment
Name of test temperature/℃ humidity /% duration/h environmental conditions, recovery time/h working condition
High-temperature test 60 ± 2 - 2 -
Low temperature test -25 ± 2 - 2 -
Energized state
Damp heat test
Raised to 25 ± 2 40 ± 2 82 ~ 85 3 -
40 ± 2 85 ~ 88 3 -
Down to 40 ± 2 25 ± 2 82 ~ 85 3 -
Energized state
High Temperature Storage Test 70 ± 2 - 16 3
Low Temperature Storage Test -10 ± 2 - 16 3
No power
5.13 Continuous working time
DC power supply steady lighting line, continuous working time not less than 8h; DC power supply flashes lighting lines, continuous operation
As time should not be less than 16h.
5.14-proof performance
Illuminated line of explosion-proof, explosion-proof performance should be consistent with the provisions of GB 3836.1.
6 Test methods
6.1 Visual inspection
Visual illumination line appearance.
6.2 luminous intensity measurement
With an accuracy not less than ± 5% of the luminance meter, luminance values were measured three different parts of the light-emitting illumination line body, calculate the average
As a result of the measurement.
6.3 Blinking Frequency Measurement
The illumination line in operation, with an accuracy of not less than 0.1s stopwatch, record 20s in the illumination line scintillation number flashes computing
frequency.
6.4 Quality Measurement
With an accuracy of not less than 0.5kg, said electronic measuring illumination line line body mass.
6.5 Check the guide
The illumination line in working condition, visual guiding function, with an accuracy of not less than grade Ⅱ tape measure distance between adjacent direction signs.
6.6 Insulation resistance test
With an accuracy not less than ± 5% of the insulation resistance meter, insulation resistance measurement illumination line conductor and surface illumination line between lines in vitro.
6.7 compressive strength test
With an accuracy not less than ± 10% of the compressive strength tester, applying an alternating illumination line between external terminals and distribution boxes housing live
1500V ± 100V voltage, duration 1min.
6.8 tensile test
Lighting line body line vertically, one end fixed, the other end of the tension applied to 300N, duration 5min.
6.9 compression testing
There are provided two length 10cm, width is 5cm, a thickness of 5mm Bakelite insulating plate, and the two illumination line on the line of the body of the insulating plate
Intermediate portion. 700N pressure in the direction perpendicular to the insulating plate, the duration 5min.
6.10 waterproof test
With a water spray nozzle lighting line line body water spray, water spray nozzle flow (10 ± 1) L/min, duration of 2min.
6.11 maximum surface temperature test
According to the method specified in GB 7000.1.
6.12 weatherability aptitude test environment
6.12.1 High Temperature Test
Press the test conditions of high temperature and 5.12 GB/T 2423.2 Test provisions.
6.12.2 Low temperature test
Press the test conditions and low 5.12 GB/T 2423.1 Test provisions.
6.12.3 Damp heat test
5.12 by alternating hot and humid conditions and test GB/T 2423.4 Test provisions.
6.12.4 high temperature storage test
By 5.12 high temperature storage test conditions and GB/T 2423.2 Test provisions.
6.12.5 low temperature storage test
5.12 by low temperature storage test conditions and GB/T 2423.1 Test provisions.
6.13 Continuous operating time test
Power illumination line of work, start time, recording duration, during which the illumination line emission luminance value monitoring is less than 10cd/m2.
6.14-proof performance test
Explosion-proof lighting line performance test method shall comply with the provisions of GB 3836.1.
7 Inspection rules
7.1 Inspection classification
Product testing and factory inspection sub-type test.
7.2 Type inspection
7.2.1 When one of the following conditions, type of inspection should be carried out.
--- When setting new product trial;
--- Product design, material, structure, process the larger changes;
--- Normal production for three years;
--- Discontinued one year to resume production;
--- National quality supervision agency type inspection requirements.
7.2.2 Type inspection items according to the provisions of Article 5 and 8.1.1.
7.2.3 type test sample should be factory inspection of products at random, the number of samples is 2 sets.
Results 7.2.4 seized items all meet the requirements of this standard, the type inspection sentenced products.
7.3 factory inspection
7.3.1 Each product shall be factory inspection.
7.3.2 factory inspection items and press 5.1,5.2,5.3,5.5 5.6 requirements.
Results 7.3.3 seized items all meet the requirements of this standard, sentenced to factory inspection.
8 signs, packaging, transportation and storage
8.1 mark
8.1.1 Lighting should be provided online nameplate, clearly marked with the following.
a) Product name and model number;
b) operating voltage and maximum operating current;
c) name of the manufacturer;
d) the date of manufacture;
e) proof mark;
f) the implementation of the standard code.
8.1.2 The outer box should be marked with the following.
a) Product name and model number;
b) operating voltage and maximum operating current;
c) the name and address of the manufacturer.
8.2 Packaging
8.2.1 according to GB/T 191 of the regulations, as rain, moisture, shock-proof packaging.
8.2.2 random file are.
a) product certification;
b) the packing list;
c) instructions for use.
8.3 Transport
Product transportation process should avoid violent collision and take measures moisture.
8.4 Storage
The product should be stored in dry, ventilated environment.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB 26783-2011_English be delivered?Answer: Upon your order, we will start to translate GB 26783-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB 26783-2011_English with my colleagues?Answer: Yes. The purchased PDF of GB 26783-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|