US$789.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. JJG 596-2012: Verification Regulation of Electrical Meters for Measuring Alternating-current Electrical Energy Status: Valid JJG 596: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
JJG 596-2012 | English | 789 |
Add to Cart
|
6 days [Need to translate]
|
Verification Regulation of Electrical Meters for Measuring Alternating-current Electrical Energy
| Valid |
JJG 596-2012
|
JJG 596-1999 | English | RFQ |
ASK
|
6 days [Need to translate]
|
Verification Regulation of Electrical Energy Meters with Electronics
| Obsolete |
JJG 596-1999
|
JJG 596-1989 | English | RFQ |
ASK
|
3 days [Need to translate]
|
(Chinese Industry Standard)
| Obsolete |
JJG 596-1989
|
PDF similar to JJG 596-2012
Basic data Standard ID | JJG 596-2012 (JJG596-2012) | Description (Translated English) | Verification Regulation of Electrical Meters for Measuring Alternating-current Electrical Energy | Sector / Industry | Metrology & Measurement Industry Standard | Classification of Chinese Standard | A55 | Classification of International Standard | 17.220 | Word Count Estimation | 34,327 | Older Standard (superseded by this standard) | JJG 596-1999 | Quoted Standard | JJG 597-2005; GB/T 17215.352-2009 | Regulation (derived from) | AQSIQ Announcement No. 157 of 2012 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine | Summary | This standard applies to the reference frequency 50Hz or 60Hz single-phase, three-phase electronic (static) AC power meter (abbreviated electronic energy meter or a meter) of the first test, follow-up examination. For other functions with electronic meter |
JJG 596-2012: Verification Regulation of Electrical Meters for Measuring Alternating-current Electrical Energy ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Verification Regulation of Electrical Meters for Measuring Alternating-current Electrical Energy
State verification procedures People's Republic of China
Electronic AC power meter
Issued on. 2012-10-08
2013-04-08 implementation
The State Administration of Quality Supervision, Inspection and Quarantine released
Electronic AC electricity meter testing procedures
Ener
gy
Replacing JJG 596-1999
(Installation of energy section)
Focal point. the National Technical Committee on Electromagnetic measurement
Main drafting unit. Liaoning Provincial Institute of Metrology
Shaanxi Electric Power Research Institute
Shanghai Measurement and Testing Technology Research Institute
Participated in the drafting unit. Shenyang Metrology hospital
Dalian metrological verification tests
The measurement procedure commissioned the National Technical Committee is responsible for interpreting electromagnetic
The main drafters of this procedure.
Hong Tang (Liaoning Provincial Institute of Metrology)
Yang West (Shaanxi Electric Power Research Institute)
Lei Shi Bing (Shanghai Institute of Measurement and Testing)
Drafters participate.
Gu Liang (Liaoning Provincial Institute of Metrology)
Shen Hong (Shenyang Metrology Institute)
Cui Lijuan (Dalian metrological verification tests)
table of Contents
Introduction (Ⅱ)
1 Scope (1)
2. References (1)
3 Overview (1)
4 metering performance requirements (2)
4.1 basic error (2)
4.2 Creeping (3)
4.3 Start (3)
4.4 meter constant (4)
4.5 day clock timing error (4)
5 General technical requirements (4)
Flag 5.1 (4)
5.2 AC voltage test (4)
6 Control of measuring instruments (5)
6.1 initial verification, subsequent verification (5)
6.2 test conditions (5)
6.3 test item (8)
6.4 test methods (8)
6.5 test results processing (13)
6.6 test cycle (14)
Appendix A test wiring diagram (15)
Appendix B test original record format (17)
Appendix C calibration certificate/test results in the notice page format (p. 2) (22)
Appendix D calibration certificate/test results test results page notice Shape (page 3) (23)
Introduction
This procedure based on JJF1002-2010 "national verification procedures write rules" establishment.
This procedure is based on GB/T 17215.211-2006 "AC measuring equipment General requirements, tests and test strips
Section member 11. measuring equipment ", GB/T 17215.321-2008" special measuring equipment to AC
Seeking Part 21. Static meters for active energy (level 1 and level 2) ", GB/T 17215.322-2008" AC
Measuring equipment - Specific requirements Part 22. Static meters for active energy (0.2S and 0.5S grade level "
GB/T 17215.323-2008 "AC measuring equipment - Specific requirements - Part 23. Static reactive power meter
(Level 2 and 3) "as the basis for JJG 596-1999" electronic meter, "subject to revisions. And JJG 596-
1999 version compared to this Regulation except editorial changes, the main changes in the technical part as follows.
--- Procedure name from the original electronic energy meter to electronic AC meter;
--- Apply only to test the installation of energy, electricity and does not apply to standard test meter, digital meter
Menu site inspection;
--- Clear 0.2 and 0.5 for the class 0.2S and 0.5S level of class 0.2S, 0.5S level meter is only applicable
For active energy meter access by the transformer;
--- Increased levels 2 and 3 and the corresponding reactive power meter technical requirements;
--- Increasing the difference between the requirements of error of unbalanced load and balance the load;
--- Increased day project timing errors.
The previous versions of the release JJG 596-1999 case.
--- JJG 596-1989.
Electronic AC electricity meter testing procedures
1 Scope
The order applies to the reference frequency of 50Hz or 60Hz single-phase, three-phase electronic (static) AC power meter
(Referred to as the electronic energy meter or meter) of the initial verification, subsequent verification.
For having other functions of the electronic energy meter, which is the same verification procedure of the project implementation.
This procedure does not apply to electro-mechanical (induction system) AC power meter, the standard power meter, digital power meter (electrical test
Pressure field, the current digital meter) and meter verification test.
2. References
This procedure refers to the following documents.
JJG 597-2005 AC power meter testing equipment
GB/T 17215.352-2009 AC measuring equipment - Specific requirements - Part 52. Symbols
For dated references, only the dated edition applies to this procedure; undated reference documents
Member, the latest edition (including any amendments) applies to this procedure.
3 Overview
Electronic devices composed of AC power measurement circuit table called electronic AC power meter, the current and voltage is applied
The solid state (electronic) device, proportional with the power generated within a certain time and the. Because it is different from electromechanical (flu
Should the Department) AC power meter has a rotating element, it is also known as static AC power meter. Electronic single-phase energy meter
Principle block diagram shown in Figure 1.
Principle block diagram of the electronic structure of single-phase energy meter
For three-phase electronic energy meter, each phase voltage and current sampling circuit and the multiplier with electronic single-phase energy meter
Same, but before the P/F converter summing circuit to be added, the multiplier output signals of the respective phases to the frequency divider are added.
frequency conversion.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJG 596-2012_English be delivered?Answer: Upon your order, we will start to translate JJG 596-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JJG 596-2012_English with my colleagues?Answer: Yes. The purchased PDF of JJG 596-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version JJG 596-2012?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JJG 596-2012 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|