|
US$174.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GBZ25320.3-2010: Power systems management and associated information exchange -- Data and communications security -- Part 3: Communication network and system security -- Profiles including TCP/IP Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/Z 25320.3-2010 | English | 174 |
Add to Cart
|
3 days [Need to translate]
|
Power systems management and associated information exchange -- Data and communications security -- Part 3: Communication network and system security -- Profiles including TCP/IP
| Valid |
GB/Z 25320.3-2010
|
PDF similar to GBZ25320.3-2010
Basic data | Standard ID | GB/Z 25320.3-2010 (GB/Z25320.3-2010) | | Description (Translated English) | Power systems management and associated information exchange -- Data and communications security -- Part 3: Communication network and system security -- Profiles including TCP/IP | | Sector / Industry | National Standard | | Classification of Chinese Standard | F21 | | Classification of International Standard | 29.240.30 | | Word Count Estimation | 9,965 | | Date of Issue | 2010-11-10 | | Date of Implementation | 2011-05-01 | | Quoted Standard | GB/Z 25320.1; IEC/TS 62351-2; RFC 2246; RFC 2712; RFC 3268; RFC 3280 | | Adopted Standard | IEC/TS 62351-3-2007, IDT | | Regulation (derived from) | ?National Standard Approval Announcement 2010 No.8 (Total No.163) | | Issuing agency(ies) | Ministry of Health of the People's Republic of China | | Summary | This standard specifies the SCADA and TCP/IP as the message transport layer protocol remote. Provide confidentiality, tamper detection and message -level authentication. Although the TCP/IP security protection there are many possible solutions, but the scope of the specific portion of the inner end is at either end of the communication entity TCP/IP connection to provide secure communications between the entities. Inserted during external safety devices (such as " link -side encryption box") to use and not within the scope of this specification. |
GBZ25320.3-2010: Power systems management and associated information exchange -- Data and communications security -- Part 3: Communication network and system security -- Profiles including TCP/IP
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Power systems management and associated information exchange. Data and communications security. Part 3. Communication network and system security. Profiles including TCP/IP
ICS 29.240.30
F21
People's Republic of China national standardization of technical guidance documents
Power System Management and Information Exchange
Data and communications security
Part 3. Communication networks and system security
Including TCP/IP protocol set
Powersystems management and associated information exchange-
Part 3.Communicationnetworkandsystemsecurity-
(IEC TS62351-3.2007, IDT)
2010-11-10.2011-05-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Foreword Ⅲ
Introduction IV
1 Scope and purpose 1
2 Normative references 1
3 Terms and definitions 2
4 This part of the safety issues involved 2
5 Mandatory 2
6 TC57 reference standard requirements 4
7 Consistency 4
Foreword
International Electrotechnical Commission 57 Technical Committee (IEC TC57) for the management of power systems and the exchange of information developed by IEC 62351 "
Force system management and information exchange data and communications security "standard. We use IEC 62351, prepared GB /Z 25320 guidance
Technical documents, including the following sections.
--- Part 1. Introduction to communication network and system security and safety issues;
--- Part 2. Terms;
--- Part 3. Communication network and system security Protocol set containing TCP/IP;
--- Part 4. Protocol set containing MMS;
--- Part 5. IEC 60870-5 and its derivatives standards;
--- Part 6. DL/T 860 security;
--- Part 7. Network and system management data object model;
--- Part 8. Role-based access control of power system management.
This section identical with IEC TS62351-3.2007 "Power System Management and Information Exchange Part 3 data and communications security
Minutes. Communication Network and System Security Including TCP/IP Protocol Set "(in English).
This part is proposed by China Electricity Council.
This part of the National Power System Management and Information Exchange Standardization Technical Committee (SAC/TC82) centralized.
This part of the drafting unit. Liaoning Provincial Power Co., Ltd. Dispatch Communication Center, State Grid Electric Power Research Institute, the State Power Dispatching Communication
Heart, Institute of Power Grid Automation, China Electric Power Research Institute, Power Dispatch and Communication Center of Fujian Provincial Electric Power Co., Ltd., Huazhong Power Grid Co., Ltd.
Division power dispatch communication center, East China Power Grid Co., Ltd.
The main drafters of this section.Cao Lianjun, Nan Gui Lin, Xu Mu Liang, Han Shuibao, Yang Qiuheng, Deng Zhaoyun, Li Genwei, Yuan and Lin, Lin Weimin.
This guideline is for reference only. For advice or comments on this guidance document, be directed to the Director of Standardization Administration of the State Council
Department reflected.
Introduction
Computer, communications and networking technologies are currently widely used in power systems. There are various kinds of information in communications and computer networks
Possible security attacks pose a threat to the security of data and communications in power systems. These potential possible attacks target the power system
Security vulnerabilities in communication protocols at various levels of the system and imperfections in the security management of power system information infrastructure.
To this end, we adopted the international standard to develop GB /Z 25320 "Power System Management and its information exchange data and communication security", pass
Over the relevant communication protocols and in the information infrastructure management to add specific security measures to improve and enhance the power system data and pass
The security of the letter.
Power System Management and Information Exchange
Data and communications security
Part 3. Communication networks and system security
Including TCP/IP protocol set
1 Scope and purpose
1.1 Scope
This part of GB /Z 25320 specifies how to provide confidentiality for SCADA and TCP/IP as a telecontrol protocol for the messaging layer
Sex, tamper detection and message level certification.
Although there are many possible solutions to the security of TCP/IP, the specific scope of this section is within the end-entity
At either end of a TCP/IP connection, security between communicating entities is provided. External security devices inserted between them (such as "link-side encryption
Box ") is not covered by this standard.
1.2 purpose
GB /Z 25320 This part of the provisions of the Transport Layer Security Protocol (Transport Layer Security, TLS) (at
RFC2246 in the definition) of the message, process and algorithm specifications, based on the TCP/IP protocol for security, so that these agreements can be appropriate
For the remote environment of IEC TC57. As other IEC TC57 standards need to provide protection for their TCP/IP-based protocols, Ben
Some are expected to be cited as a normative part of these IEC TC57 standards. However, deciding whether or not to invoke this document is a matter of agreement
Full protection of the independent choice.
This section reflects the current IEC TC57 protocol security needs. This section may be required if other standards propose new requirements in the future
To be revised.
This section of the initial reader is expected to IEC TC57 in the development or use of these protocols working group members. For the purpose of this section description
Effective measures for the use of TCP/IP protocol itself, its norms should adopt and cite these measures. This section is to enable it
Prepared in this way.
Subsequent readers of this section are expected to be developers of products that implement these protocols. Some parts of this section can also be managers
And executive staff to understand the purpose and needs of the job.
2 Normative references
The provisions of the following documents through the GB /Z 25320 of this part of the reference and become the provisions of this section. Any reference to the date of the citation
All subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to be reached under this section
The parties to the agreement examine whether the latest versions of these documents are available. For undated references, the latest version applies to this book
section.
GB /Z 25320.1 Power system management and its exchange of information data and communications security - Part 1. Communication network and system security
Introduction to Safety (GB /Z 25320.1-2010, IEC TS62351-1.2007, IDT)
IEC TS62351-2 Power System Management and Information Exchange Data and Communication Security Part 2. Terminology (Powersystems
managementandassociatedinformationexchange-Dataandcommunicationssecurity-Part 2.Glossaryof
terms
RFC2246 Transport Layer Security Protocol (TLS) (RFC2246.1999, TheTLSProtocolVersion1.01))
1) T. Dierks, C. Alen. This standard is usually called SSL/T LS (Secure Socket Layer/Transport Layer Security Protocol).
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GBZ25320.3-2010_English be delivered?Answer: Upon your order, we will start to translate GBZ25320.3-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GBZ25320.3-2010_English with my colleagues?Answer: Yes. The purchased PDF of GBZ25320.3-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|