|
US$119.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 41380-2022: Configuration requirements for facility and equipment of influenza prevention in intensified poultry farms Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 41380-2022 | English | 119 |
Add to Cart
|
3 days [Need to translate]
|
Configuration requirements for facility and equipment of influenza prevention in intensified poultry farms
| Valid |
GB/T 41380-2022
|
PDF similar to GB/T 41380-2022
Basic data | Standard ID | GB/T 41380-2022 (GB/T41380-2022) | | Description (Translated English) | Configuration requirements for facility and equipment of influenza prevention in intensified poultry farms | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | B43 | | Word Count Estimation | 6,610 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 41380-2022: Configuration requirements for facility and equipment of influenza prevention in intensified poultry farms ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Configuration requirements for facility and equipment of influenza prevention in intensified poultry farms
ICS 65.040.10
CCSB43
National Standards of People's Republic of China
Influenza prevention and control in large-scale poultry farms
Facilities and equipment configuration requirements
Published on 2022-03-09
2022-10-01 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
drafted.
Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents.
This document is proposed by the Ministry of Agriculture and Rural Affairs of the People's Republic of China.
This document is under the jurisdiction of the National Standardization Technical Committee of Animal Husbandry (SAC/TC274).
This document is drafted by. China Agricultural University, National Animal Husbandry Station, Jiangsu Academy of Agricultural Sciences, Qingdao Agricultural University.
The main drafters of this document. Shi Zhengxiang, Li Baoming, Zhang Yahui, Zhao Xiaoli, Wang Chaoyuan, Shi Zhendan, Wang Baowei, Chen Gang, Zhao Shumei, Tong Qin,
Zheng Weichao, Wang Panliu, Li Dapeng.
Influenza prevention and control in large-scale poultry farms
Facilities and equipment configuration requirements
1 Scope
This document specifies the site selection, field layout, isolation facility configuration, disinfection facility configuration, actual
Laboratory configuration, environmental management facilities and equipment configuration, etc.
This document applies to the configuration of facilities and equipment for influenza prevention and control in large-scale poultry farms.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations
documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to
this document.
GB 5749 Hygienic Standard for Drinking Water
HJ568 Specifications for Environmental Assessment of Livestock and Poultry Breeding Origins
NY/T 682 Technical Specification for Design of Livestock and Poultry Farms
3 Terms and Definitions
There are no terms and definitions that need to be defined in this document.
4 Site selection for poultry farms
4.1 The dominant wind direction of the poultry farm is clear, and low-lying areas should be avoided. The water body for carrying birds in a waterfowl farm with water surface should be an independent water source.
4.2 The habitats on the main migration routes of migratory birds should be avoided.
4.3 Not less than 1000m away from drinking water sources, scenic spots, core areas and buffer zones of nature reserves;
The population concentration area such as chemical education and scientific research shall not be less than 500m, and it shall be located in the downwind or crosswind direction of the population concentration area;
It should be more than 500m from the main traffic line; more than 500m from other existing poultry farms, from animal hospitals, isolation, slaughtering and processing places, live poultry
More than 1000m in the trading market and the harmless treatment of dead livestock and poultry.
4.4 The air environment quality in the field area should meet the requirements of HJ568.
4.5 The source of drinking water should be sufficient.
5 field layout
5.1 The production area, living management area, auxiliary production area and manure treatment area should be clearly defined.
5.2 The production area should be laid out in accordance with the production process requirements of the whole field or the whole building.
5.3 The poultry house should be arranged in a single row, its long axis is parallel to the dominant wind direction or the included angle is less than 30°, and the clearway should be arranged upwind according to the dominant wind direction.
The slops are arranged in the downwind direction.
5.4 Special tank trucks should be used to load feed in the field area, and the feed tower should be built near the entrance of the field area, or a separate feeding channel should be set up.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 41380-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 41380-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 41380-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 41380-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|