Code of practice for installation and commissioning of anchor handling system
| Valid |
GB/T 39207-2020
|
PDF similar to GB/T 39207-2020
Basic data | Standard ID | GB/T 39207-2020 (GB/T39207-2020) | | Description (Translated English) | Code of practice for installation and commissioning of anchor handling system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | U16 | | Classification of International Standard | 47.020.99 | | Word Count Estimation | 18,179 | | Date of Issue | 2020-10-11 | | Date of Implementation | 2021-05-01 | | Regulation (derived from) | National Standard Announcement No. 21 of 2020 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 39207-2020: Code of practice for installation and commissioning of anchor handling system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Code of practice for installation and commissioning of anchor handling system
ICS 47.020.99
U16
National Standards of People's Republic of China
Anchor handling system installation and commissioning regulations
2020-10-11 released
2021-05-01 implementation
State Administration for Market Regulation
Issued by the National Standardization Management Committee
Table of contents
Foreword Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Preparation before installation 2
4.1 File 2
4.2 Personnel 2
4.3 Tooling, tools and equipment 2
4.4 Installation conditions 3
5 Installation quality 3
5.1 Installation accuracy 3
5.2 Completeness 3
5.3 Weld quality 3
5.4 Fastness 4
5.5 Tightness 4
6 Installation procedure 4
6.1 Anchor handling winch installation 4
6.2 Installation of chain guide 5
6.3 Installation of guide chain groove 5
6.4 Installation of tail drum 5
6.5 Installation of shark pliers and bollards 5
6.6 Installation of Anchor Chain Transfer Winch 5
6.7 Installation of hydraulic equipment, electrical equipment, pipelines, etc. 5
7 Installation inspection 6
8 Debug 6
8.1 Purpose of debugging 6
8.2 Debugging files 6
8.3 Instruments, instruments and tools for debugging 6
8.4 Debugger 6
8.5 Debugging environment 6
8.6 Debugging conditions 7
8.7 Debugging 7
8.8 Debugging data collation and report submission 9
Appendix A (informative appendix) bolt torque reference table 10
Appendix B (informative appendix) Commissioning record table 11
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed and managed by the National Ocean Shipping Standardization Technical Committee (SAC/TC12).
Drafting organizations of this standard. CSSC Huangpu Wenchong Shipbuilding Co., Ltd., China State Shipbuilding Industry Technical and Economic Research Institute, Guangzhou Huangchuan Ocean Shipping
Engineering Co., Ltd.
The main drafters of this standard. Chen Xiangrong, Chen Zunqing, Nie Lijun, Lian Boqiang, Liu Wei, Huang Jiayong, Luo Jiutian, He Jin, Jiang Wei, Sun Zhongliang,
Liang Yujian, Huang Jianjun, Song Yibin.
Anchor handling system installation and commissioning regulations
1 Scope
This standard specifies the pre-installation preparation, installation quality, installation procedures, installation inspection and commissioning requirements of the anchor handling system.
This standard applies to the installation and commissioning of anchor handling systems.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 34000 China Shipbuilding Quality Standard
GB 50661 Specification for Welding of Steel Structures
CB/T 3190-2019 Steel hull structure welding groove type and size
CB/T 3619 Ship system and power pipeline installation and tightness test quality requirements
CB/T 3802 Requirements for surface quality inspection of ship hull welds
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Anchor handling system
A system for other ships/platforms to perform anchoring and anchoring operations.
Note. The anchor handling system is composed of anchor handling winches, tail drums, shark clamps, bollards, chain guides, chain guide grooves, anchor chain transfer winches and other equipment. See the layout diagram
figure 1.
3.2
Anchor handling winch
A winch that provides pulling force for other ships/platforms for anchoring and anchoring operations.
3.3
Shark pliers
Hold the wire rope or anchor chain tightly to the clamped equipment.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 39207-2020_English be delivered?Answer: Upon your order, we will start to translate GB/T 39207-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 39207-2020_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 39207-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|