|
US$264.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 23142-2008: Preset power controller for high pressure sodium lamps -- Performance requirements Status: Obsolete
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 23142-2008 | English | 264 |
Add to Cart
|
3 days [Need to translate]
|
Preset power controller for high pressure sodium lamps -- Performance requirements
| Obsolete |
GB/T 23142-2008
|
PDF similar to GB/T 23142-2008
Basic data | Standard ID | GB/T 23142-2008 (GB/T23142-2008) | | Description (Translated English) | Preset power controller for high pressure sodium lamps -- Performance requirements | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K74 | | Classification of International Standard | 29.140.99 | | Word Count Estimation | 6,673 | | Date of Issue | 2008-12-30 | | Date of Implementation | 2009-09-01 | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 26 of 2008 (total 139) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the high-pressure sodium lamp power controller with preset definition, signs, tests and requirements. This standard applies to change without replacing high-pressure sodium lamp power using 50Hz or 60Hz, 1000V ac power HPS preset power with inductive ballast controller (hereinafter: the controller). This standard should be GB 19510. 1 and GB/T 19510. 12 used with the standard controller for high-pressure sodium lamps shall conform to GB/T 13259 requirements, pre- power inductive ballast shall comply with QB/T 2941-2008 requirements. |
GB/T 23142-2008: Preset power controller for high pressure sodium lamps -- Performance requirements ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Preset power controller for high pressure sodium lamps. Performance requirements
ICS 29.140.99
K74
National Standards of People's Republic of China
HPS with preset power controller
Posted 2008-12-30
2009-09-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard Annex A, Annex B normative appendix.
The standard proposed by China National Light Industry Council.
This standard by the National Standardization Technical Committee of electrical lighting (SAC/TC224) centralized.
This standard was drafted. Foshan Electrical Lighting Co., Ltd., China, Shanghai Yaming Lighting Co., Ltd., Ningbo Electric Aix body has
Limited, Tridonic Lighting Electronics (Shanghai) Co., Ltd. Wuhu City Fidelity.
Drafters of this standard. Ou Yang, Cooper rights, Xu Xiaoliang, Zhouhui Long, Chen Cha, Zhu Qing in.
HPS with preset power controller
1 Scope
This standard specifies the definition of high pressure sodium lamps with preset power controller, marking, testing and requirements.
This standard applies not replace high pressure sodium lamp power to change the use of 50Hz or 60Hz, 1000V ac power high
Pressure sodium lamps with inductive ballast preset power controller (hereinafter. the controller).
This standard should be used with GB 19510.1 and GB/T 19510.12, the controller of this standard shall comply with the applicable HPS
GB/T 13259 requirements, preset power inductive ballast shall comply with the QB/T 2941-2008 requirements.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB 7000.1-2007 Lamps - Part 1. General requirements and tests (IEC 60598-1.2003, IDT)
GB/T 13259 HPS (GB/T 13259-2005, IEC 60662.2002, NEQ)
GB/T 15042-2008 light discharge lamps (excluding tubular fluorescent lamps) Ballast Performance requirements (IEC 60923.
2006, IDT)
GB/T 18595 Equipment for general lighting purposes EMC immunity requirements (GB/T 18595-2001, idt IEC 61547.1995)
Part 1 GB 19510.1 lamp control apparatus. General and safety requirements (GB 19510.1-2008, IEC 61347-1.
2007, IDT)
Part 12 control unit GB 19510.12 lamp. luminaire combined with miscellaneous electronic circuits - Particular requirements (GB 19510.12-
2005, IEC 61347-2-11.2001, IDT)
QB/T 2941-2008 with preset power HPS Ballast
IEC 60410 count inspection Sampling plans and procedures (Samplingplansandproceduresforinspectionbyattrib-
utes)
3 Terms and Definitions
QB/T 2941-2008 and identified by the following terms and definitions apply to this standard.
3.1
The power controller is preset to the preset output power conversion ballast lamp power control device. The control means may be preset time control
Or preset time control.
4 Flag
The controller logo shall comply with the requirements of GB 19510.12 and the following requirements.
Preset power and the corresponding power line connected to one or more of the identified 4.1.
4.2 The maximum load current control or the maximum load control lamp power control and the highest voltage.
4.3 preset time controls shall identify the preset time, including the various modes and their replacement time. If the control device is adjustable presets
Time, the corresponding adjustment shall identify the location and method of time can also be described in the manufacturer's instructions.
4.4 preset time error. If the manufacturer has not made an error range preset time, the maximum deviation is 5min.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 23142-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 23142-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 23142-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 23142-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|