HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

GB/T 17680.1-2008 PDF English

US$85.00 · In stock · Download in 9 seconds
GB/T 17680.1-2008: Criteria for emergency planning and preparedness for nuclear power plants -- Part 1: The dividing of emergency planning zone
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB/T 17680.1: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB/T 17680.1-2008English85 Add to Cart 0-9 seconds. Auto-delivery Criteria for emergency planning and preparedness for nuclear power plants -- Part 1: The dividing of emergency planning zone Valid
GB/T 17680.1-1999English239 Add to Cart 2 days Criteria for emergency planning and preparedness for nuclear power plants. The dividing of emergency planning zone Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB/T 17680.1-2008
      

Similar standards

GB 39220   GB/T 17680.11   GB 18871   GB/T 17680.12   

GB/T 17680.1-2008: Criteria for emergency planning and preparedness for nuclear power plants -- Part 1: The dividing of emergency planning zone


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT17680.1-2008
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 27.120.20 F 77 Replacing GB/T 17680.1-1999 Criteria for emergency planning and preparedness for nuclear power plants - Part 1. The dividing of emergency planning zone Issued on: JULY 2, 2008 Implemented on: APRIL 01, 2009 Issued by. General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China; Standardization Administration of the People’s Republic of China.

Table of Contents

Foreword ... 3 1  Scope ... 5 2  Normative references ... 5 3  Terms and definitions ... 5 4  Accidents to be considered ... 6 5  General method and safety rules for confirming the scope of the emergency planning zone ... 7 6  Confirmation of scope and actual boundary of emergency planning zone 8

Foreword

GB/T 17680 Criteria for emergency planning and preparedness for nuclear power plants is divided into 12 parts. — Part 1. The dividing of emergency planning zone; — Part 2. Offsite emergency functions and organizations; — Part 3. Functional and physical characteristics of the offsite emergency facilities; — Part 4. The offsite emergency planning and implementing procedures; — Part 5. Maintenance of offsite emergency response capabilities; — Part 6. On-site emergency response functions and organizations; — Part 7. Function and physical characteristics of on-site emergency facilities; — Part 8. On-site emergency planning and implementing procedures; — Part 9. Maintenance of on-site emergency response capacity; — Part 10. Criteria for emergency radiological field monitoring, sampling and analysis conducted by nuclear power plant operating organizations; — Part 11. Criteria for the conduct of offsite radiological assessment for emergency response; — Part 12. Planning, development, conduct and evaluation of nuclear emergency drills and exercises. This Part is part 1 of GB/T 17680. This Part adopts internationally-used general safety codes for confirming the emergency planning zone of the nuclear power plant, and references to the division codes of emergency planning zone of the nuclear power plant in America, Canada, France, England, etc. This Part replaces GB/T 17680.1-1999 Criteria for emergency planning and preparedness for nuclear power plants - The dividing of emergency planning zone. This revision is mainly for some editing modification. The main differences between GB/T 17680.1-1999 and this Part are as follows. — The contents of the forward are more comprehensive; clarify that this Part provides the technical basis for the emergency planning zone of nuclear power plant. — The reference document is revised to be the national standard GB 18871 that is formally issued and executed by our country. — The regulations in previous clause 4.4.4 “considering the release of radioactive substance to the atmosphere, optionally considering the release of radioactive substance to the water when confirming the scope of the emergency planning zone” are deleted. — In 6.1.1, the regulations for considering the heat power of unit reactor are considered when confirming the scope of plume emergency planning zone. This Part was proposed by China National Nuclear Corporation. This Part shall be under the jurisdiction of National Nuclear Energy Standardization Technology Committee. The drafting organizations of this Part. Nuclear Industry Standardization Institute, Guangdong Nuclear Power Joint Venture Company, and Safety & Quality Department of China National Nuclear Corporation. Main drafter of this standard. Zhuo Fengguan. The previous version replaced by this standard is as follows. — GB/T 17680.1-1999. Criteria for Emergency Planning and Preparedness for Nuclear Power Plants - Part 1. The Dividing of Emergency Planning Zone

1  Scope

This Part of GB/T 17680 specifies the general division codes of emergency planning zone of nuclear power plant; it recommends the scope of the emergency planning zone of pressurized water reactor nuclear power plant. This Part is suitable for dividing the emergency planning zone of pressurized water reactor nuclear power plant; the division of the emergency planning zone of other types of reactor nuclear power plant can refer to this Part. 2  Normative references The articles contained in the following documents have become part of this Part of GB/T 17680 when they are quoted herein. For the dated documents so quoted, all the modifications (excluding corrections) or revisions made thereafter shall not be applicable to this Part. For the undated documents so quoted, the latest editions shall be applicable to this Part. GB 18871 Basic standards for protection against ionizing radiation and for the safety of radiation sources 3  Terms and definitions For the purpose of this Part of GB/T 17680, the following terms and definitions apply. 3.1 Emergency planning zone A zone that is established around the nuclear power plant in advance, within which the emergency plan has been prepared and emergency preparation has been made, in order to timely and effectively adopt protective action to protect the public when the nuclear power plant has an accident. 3.2 Plume emergency planning zone An emergency plan zone that is established in accordance with exposure pathways of plume (external exposure of plume immersion, internal exposure of ingestion, and the following rule. Out of the scope of ingestion emergency planning zone, the pollution level of food and drinking water that are caused by majority of serve accident series shall not exceed the general action level of food and drinking water as regulated in GB 18871. 6  Confirmation  of  scope  and  actual  boundary  of  emergency planning zone 6.1 Zone scope 6.1.1 Under the precondition of conforming to the safety rules in 5.2, the scope of the plume emergency planning zone of pressurized water reactor nuclear power plant shall consider the heat power of the reactor; it shall be confirmed based on the range that the reactor acts as center and the radius is 7-10km. The scope of the plume emergency planning zone shall consider the heat power of the reactor; and it shall be confirmed based on the range that the reactor acts as center and the radius is 3-5km. 6.1.2 Under the precondition of considering the safety rules in 5.3, for pressurized water reactor nuclear power plant, the scope of the ingestion emergency planning zone shall be, in the stage of emergency planning and preparation, considered and based on the evaluation result of the radiation consequence that is considered by the emergency planning. In the emergency response, the zone scope of the related response action shall be confirmed according to the result of the actual monitoring and sampling analysis. 6.2 Confirmation of actual boundary When confirming the actual boundary position of emergency planning zone (specifically the plume emergency planning zone), except that it shall be abided by the safety rules in chapter 5 and the zone range requirement in 6.1, it must consider the special environment features (such as terrain, administrative district boundary, population distribution, traffic, communication and the like), social economic position, and public psychology, so that the actual boundary (it may not always round) of the finally planned emergency planning zone conforms to the actual condition, and the emergency preparation and response may be easily carried out. 6.3 Scope and boundary of multi-reactor site emergency planning zone For multi-reactor site, a uniform emergency planning zone shall be confirmed; the scope shall include the requirements of chapter 5, 6.1 and 6.2 to target each reactor unit to confirm the scope of emergency planning zone; the boundary can be the envelope line of the emergency planning zone boundary of each unit. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of GB/T 17680.1-2008 be delivered?

Answer: The full copy PDF of English version of GB/T 17680.1-2008 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 17680.1-2008_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 17680.1-2008_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- GB/T 17680.1-2008 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB/T 17680.1-2008?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 17680.1-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB/T 17680.1-2008?

A step-by-step guide to download PDF of GB/T 17680.1-2008_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 17680.1-2008".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9