HOME   Cart(12)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 15148-2024 English PDF

US$519.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 15148-2024: Technical specifications for power load management system
Status: Valid

GB/T 15148: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 15148-2024English519 Add to Cart 5 days [Need to translate] Technical specifications for power load management system Valid GB/T 15148-2024
GB/T 15148-2008English559 Add to Cart 3 days [Need to translate] Technical specification of power load management system Obsolete GB/T 15148-2008
GB/T 15148-1994English519 Add to Cart 4 days [Need to translate] General specification for load control systems Obsolete GB/T 15148-1994

PDF similar to GB/T 15148-2024


Standard similar to GB/T 15148-2024

GB/T 40427   GB/T 40588   GB/T 33593   GB/T 45418   GB/T 15153.1   

Basic data

Standard ID GB/T 15148-2024 (GB/T15148-2024)
Description (Translated English) Technical specifications for power load management system
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F21
Classification of International Standard 29.240.01
Word Count Estimation 26,227
Date of Issue 2024-04-25
Date of Implementation 2024-11-01
Older Standard (superseded by this standard) GB/T 15148-2008
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 15148-2024: Technical specifications for power load management system

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 29:240:01 CCSF21 National Standards of People's Republic of China Replace GB/T 15148-2008 Technical Specifications for Power Load Management System Released on 2024-04-25 2024-11-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 General Requirements 2 5 System Architecture 2 5:1 Overall Architecture 2 5:2 Master Station 3 5:3 Data transmission channel 4 5:4 Load management device 4 6 Master Station 4 6:1 Functional Configuration 4 6:2 Function 5 6:3 Main performance indicators 7 6:4 Working environment conditions 8 7 Data transmission channel 8 7:1 Communication method 8 7:2 Transmission Rate 8 7:3 Transmission Bit Error Rate 8 7:4 Data transmission protocol 8 8 Load Management Devices 9 8:1 Functional Configuration 9 8:2 Function 9 8:3 Main performance indicators 11 8:4 Working environment conditions 12 9 Safety Requirements12 9:1 Master Station Security Requirements 12 9:2 Safety requirements for load management devices 13 10 Detection 13 10:1 Master Station Detection 13 10:2 Load management device detection 14 Appendix A (Normative) Test Items 16 Reference 17

Foreword

This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting: This document replaces GB/T 15148-2008 "Technical Specification for Power Load Management System": In addition to structural adjustments and editorial changes, the main technical changes are as follows: a) The content of "Scope" has been changed (see Chapter 1, Chapter 1 of the:2008 edition); b) Added the terms and definitions “power load” (see 3:1), “smart energy unit” (see 3:4), “measurement and control unit” (see 3:5), “load Resources” (see 3:6), “Adjustable load” (see 3:7), “Interruptible load” (see 3:8), “Flexible regulation” (see 3:9), “Baseline load load” (see 3:10), “load aggregator” (see 3:11), “virtual power plant” (see 3:12); changed the terminology and definition “power load management” The content of "load management system" has been changed (see 3:2, 3:1 of the:2008 edition); the term name of the term "load management device" has been changed and content description (see 3:3, 3:2 of the:2008 edition); c) The overall structure of the power load management system has been changed (see 5:1, 4:3:1 of the:2008 edition); d) The requirements for the master station hardware equipment and master station software equipment have been changed (see 5:2, 4:3:2 and 4:3:3 of the:2008 edition); e) Added the description of "data transmission channel" and "load management device" (see 5:3 and 5:4); f) Changed the arrangement and content of the load management master station, and sorted out the function configuration of the master station (see 6:1,:2008 edition): 4:4:1), from load resource management, load regulation control, load trading services, user interactive services and operation and maintenance management to the main station The functions are subdivided and described (see 6:2, 4:4:2 of the:2008 edition); g) Changed the master station reliability index (see 6:3:1, 4:5:1 of the:2008 edition) and real-time index (see 6:3:2, 4:5:2), capacity and processing capability indicators (see 6:3:3, 4:5:3 of the:2008 edition), communication channel indicators (see 6:3:4,:2008 edition 4:5:4); h) Changed the requirements for data transmission channels (see Chapter 7, 4:3:6 of the:2008 edition); i) Deleted "Operation status of dedicated relay station" (see 4:4:2:7:5 c of the:2008 edition) and "Reactive power compensation control" (see 4:4:2:2:7); j) The function of the load management device has been changed (see Chapter 8, 4:4:3 of the:2008 edition); "Load management device function configuration" has been added Content list (see 8:1), the load management device functions are divided into resource management, regulation control, transaction support, interactive services and operation and maintenance Management of five categories (see 8:2); Added "main performance indicators" of load management devices (see 8:3); k) Changed the master station safety requirements (see 9:1, 4:3:5 of the:2008 edition); l) Added testing content (see Chapter 10): Please note that some of the contents of this document may involve patents: The issuing organization of this document does not assume the responsibility for identifying patents: This document was proposed by the China Electricity Council: This document is under the jurisdiction of the National Power System Management and Information Exchange Standardization Technical Committee (SAC/TC82): This document was drafted by: State Grid Electric Power Research Institute Co:, Ltd:, State Grid Corporation of China, State Grid Anhui Electric Power Co:, Ltd:, State Grid Shanxi Electric Power Company, State Grid Shanghai Electric Power Company, State Grid Jiangsu Electric Power Company, State Grid Zhejiang Electric Power Company, State Grid Shanxi Electric Power Company Dong Province Electric Power Company, State Grid Fujian Electric Power Company, State Grid Jibei Electric Power Company, Tsinghua University, Southeast University, State Grid Shaanxi Electric Power Company State Grid Ningxia Electric Power Co:, Ltd:, State Grid Hunan Electric Power Co:, Ltd:, State Grid Tianjin Electric Power Co:, Ltd:, State Grid Xinjiang Electric Power Co:, Ltd: Co:, Ltd:, State Grid Beijing Electric Power Company, China Electric Power Research Institute Co:, Ltd:, Beijing Zhixin Microelectronics Technology Co:, Ltd:, China Southern Power Grid Co:, Ltd:, NARI Technology Co:, Ltd:, State Grid Information and Communication Industry Group Co:, Ltd:, State Grid Energy Research Institute Co:, Ltd: Co:, Ltd:, North China Electric Power University, Jiangsu Hongyuan Electric Co:, Ltd: The main drafters of this document are: Xia Yong, He Sheng, Lu Zhenjun, Zheng Yuanjie, Wu Zheng, Zhang Bo, Yu Sheng, Wang Yu, Gan Yeping, Li Ye, Ma Jingjie, Wang Kairang, Zhang Weiguo, Bai Yunlong, Zhu Qing, Wu Dan, Zhang Liang, Deng Fengping, Tian Shiming, Zheng Tao, Yu Xian, Zheng Hongjuan, Chen Yangbo, Cao Min, Xu Wentao, Ruan Wenjun, Zhu Lingling, Li Lei, Wang Zhelong, Pan Mingming, Zhong Zhiqiang, Lu Lipeng, Liu Xiaoxiao, Ma Lei, Guo Hongye, Wang Yang, Ding Huixia, Yu Zhen, Zheng Zhe, Liu Yongchun, Qi Mengyi, Xiao Chupeng, Cheng Wei, Cui Can, Ma Xiaoning, Ma Jie, Yuan Bao, Li Siwei, Liang Yin, Wei Fusheng, Sun Guangming, Chen Liangliang, Zhang Yufeng, Lu Jun, Wang Haiyun, Wang Pin, Xing Siyu, Liao Ye, Duan Meimei, Wu Zhongxing, Zhang Bingpeng, Jiang Yulong, Yan Ben, Cao Yang, Liang Feng, Zhu Liangliang, Wu Renbo, Sun Jize, Huang Jungao, Zheng Qiang, Song Chunliang, Shi Zhentong, Sun Zhi, Sun Dan, Xu Honghai, Yang Song, Peng Zongming, Chen Yuchun, Wang Yunpeng, Du Wei, Yan Yu, Liu Fei, Wang Xiaoming, and Zhang Gaoshan: The previous versions of this document and the documents it replaces are as follows: ---First published in:1994 as GB/T 15148-1994, first revised in:2008; ---This is the second revision: Technical Specifications for Power Load Management System

1 Scope

This document establishes the technical principles and system architecture of the power load management system, and specifies the main station, data transmission Requirements for transmission channels, load management devices, safety, and testing: This document applies to the design, development, construction, operation and maintenance of power load management systems:

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document: For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document: GB/T 2887-2011 General Specification for Computer Sites GB/T 4208-2017 Enclosure protection degree (IP code) GB/T 22239-2019 Information security technology - Basic requirements for cybersecurity level protection GB/T 31464 Power grid operation guidelines GB/T 36572 Guidelines for network security protection of power monitoring systems GB/T 39786-2021 Information security technology Basic requirements for the application of cryptography in information systems DL/T 533 Power Load Management Terminal

3 Terms and definitions

The following terms and definitions apply to this document: 3:1 Power load powerload The total amount of electric power drawn from or sent to the power system by the load equipment of the power user at a certain moment: 3:2 Monitor, adjust and control power loads based on computer application technology, information transmission technology and power automatic control technology and operation-optimized real-time monitoring system: 3:3 A device deployed on the user side that can realize the functions of power load data collection, storage, analysis, calculation, and load regulation and control: 3:4 A device that monitors and controls user branch interruptible load resources and supports the power load management system to achieve fine control of user loads: 3:5 Monitor and regulate user-side load resources such as user branch loads, customer-side energy storage, and distributed energy, and support power load management systems:

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 15148-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 15148-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 15148-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 15148-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 15148-2024?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 15148-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.