|
US$1219.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. CJ/T 233-2016: (Building area drainage plastic inspection wells) Status: Valid CJ/T 233: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| CJ/T 233-2016 | English | 1219 |
Add to Cart
|
6 days [Need to translate]
|
(Building area drainage plastic inspection wells)
| Valid |
CJ/T 233-2016
|
| CJ/T 233-2006 | English | RFQ |
ASK
|
6 days [Need to translate]
|
Plastics inspection chambers for sewerage in building area
| Obsolete |
CJ/T 233-2006
|
PDF similar to CJ/T 233-2016
Basic data | Standard ID | CJ/T 233-2016 (CJ/T233-2016) | | Description (Translated English) | (Building area drainage plastic inspection wells) | | Sector / Industry | Urban Construction Industry Standard (Recommended) | | Classification of Chinese Standard | P41 | | Classification of International Standard | 91.140.80 | | Word Count Estimation | 53,594 | | Date of Issue | 2016-08-08 | | Date of Implementation | 2017-02-01 | | Older Standard (superseded by this standard) | CJ/T 233-2006 | | Regulation (derived from) | Ministry of Housing and Urban - Rural Development Notice No.1233 of 2016 | | Issuing agency(ies) | Ministry of Housing and Urban-Rural Development of the People's Republic of China |
CJ/T 233-2016: (Building area drainage plastic inspection wells)---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Building area drainage plastic inspection wells)
ICS 91.140.80
P41
People's Republic of China urban construction industry standards
Replacing CJ/T 233-2006
Building drainage plastic inspection wells
2016-08-08 released
2017-02-01 Implementation
Ministry of Housing and Urban-Rural Development, People's Republic of China released
Directory
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and Definitions, Abbreviations 1
4 Structure, classification and marking 3
5 material 4
6 Requirements 5
7 Test methods 10
8 Inspection rules 14
9 logo, packaging, transportation and storage 15
Appendix A (Informative) Plastic Inspection Well Block Specifications 17
Appendix B (informative) inspection well accessories 37
Appendix C (informative) plastic inspection manhole cover 42
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard instead of CJ/T 233-2006 "plastic drainage wells for construction inspection wells"
This standard is CJ/T 233-2006 "building drainage drainage plastic inspection wells" revision, compared with the CJ/T 233-2006 main
Technical changes are as follows.
--- Modify the scope of inspection wells (see Chapter 1);
--- Added borehole ID code connected with ID pipe (see 4.3);
--- Modify wellhead axial load performance requirements (see 6.1.6);
--- Increase the inspection well system performance requirements (see 6.5);
--- Increasing the size of the wells of different specifications diameter Sediment chamber size requirements (see 6.1);
--- Increasing wellhead and wellbore connection socket should have 360 ° steps, the bottom of the well should be set to support the requirements of a stable structure (see 6.1);
--- Increase the borehole and ID logo buried pipeline connection socket size requirements for the diameter (see 6.1);
--- Remove the inspection wells and wellbore adhesive connection socket (see.2006 version 7.4);
--- Adjust the connection between wellbore and pipe joints without socket elastic seal the minimum length of the socket (see 6.1);
--- Increased pavement rain outlet positive, lateral socket structure (see Appendix B);
--- Increasing the inspection wells connected buried pipe socket and pipe clearance requirements (see 6.1);
--- Increasing the diameter of the plastic cover seat hole center hole diameter requirements and the same borehole, modified some of the plastic cover size parameters, at the same time
Increase the requirements of the corresponding bearing mark on the manhole cover (see Appendix C);
--- Added anti-man fall device requirements (see Chapter 4);
--- Increased square covers and size requirements (see Appendix C);
--- Transition joint product map made the corresponding changes (see Appendix B);
--- Added another Minggou gutter product map (see Appendix B).
This standard reference EN13598.2..2009 "non-pressure buried underground rainwater drainage and drainage of plastic pipe system - PVC (U PVC)
Polypropylene (PP) and polyethylene (PE) - Part 2. Specifications for wellbore and manhole wells in traffic areas and manholes ".
This standard proposed by the Ministry of Housing and Urban Standard and Design Institute.
This standard by the Ministry of Housing and Urban Water Supply and Drainage Standardization Technical Committee building centralized.
This standard is drafted by. Jiangsu Hippo Well Co., Ltd. Ministry of Housing and Urban Science and Technology Development Promotion Center, Shanghai Hyundai
Architectural Design (Group) Co., Ltd. Technical Center.
Participated in the drafting of this standard. Fujian Yatong New Materials Technology Co., Ltd., Chengdu Mei Wo Electrical Technology Co., Ltd., Zhejiang double
Central Plastic Valve Co., Ltd., Jiangsu hippo sponge City Engineering Co., Ltd., Fujian Jin Dongcheng Construction Engineering Co., Ltd. Wang Yu Jian
Limited company.
Drafters of this standard. Zhou Minwei, Gao Lixin, Zhang Miao, Zhou Minhong, Zhou Bai Xing, Liu Mingdong, Wan Shui, Chen Que, Xu Shenguang, Zhang Yingzhong, Ye Houfu.
This standard replaces the standards previously issued as follows.
--- CJ/T 233-2006.
Building drainage plastic inspection wells
1 Scope
This standard specifies the construction area drainage plastic inspection well structure, classification and marking, materials, requirements, test methods, inspection rules, standard
Log, packaging, transportation and storage.
This standard applies to the construction area (residential area, public building area, factory area, etc.), the bottom depth of the well is not more than 6m, the buried diameter is not more than
800mm drainage plastic inspection wells.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 2828.1 Sampling procedures for sampling - Part 1. Batch-by-lot inspection sampling plan retrieved by acceptance quality limit (AQL)
(ISO 2859-1..1999, IDT)
GB/T 2918 plastic sample conditioning and testing of the standard environment
GB/T 5836.2 building drainage with rigid polyvinyl chloride (PVC-U) fittings
GB/T 8801 rigid polyvinyl chloride (PVC-U) pipe fall test methods
GB/T 8802 Thermoplastics pipes and fittings - Determination of vicat softening temperature
Plastics piping systems - Determination of dimensions of plastic parts
Test method for resistance to external shock of thermoplastic pipe GB/T 14152
GB/T 18173.3 Polymer waterproofing materials - Part 3. Water swelling rubber
GB/T 18477.3 Buried drainage of rigid polyethylene (PVC-U) structural wall piping system Part 3. Double axial hollow wall pipe
GB/T 19472.1 Polyethylene (PE) wall piping systems for underground use - Part 1. Polyethylene double wall corrugated pipe
GB/T 19472.2 Polyethylene (PE) wall pipe systems for underground use Part 2. Polyethylene winding wall pipe materials
GB/T 20221 buried underground without drainage, drainage with a rigid polyvinyl chloride (PVC-U) pipe
GB/T 21873 rubber seal to the drain pipe and sewer pipe interface seal material specifications
GB/T 23858-2009 inspection covers
CJ/T 212 polymer-based composite hydrating
CJ/T 3012 cast iron inspection manhole cover
EN1852-1 Buried unpressurized drainage and sewer plastic piping systems - Polypropylene (PP) - Part 1. Specifications for pipes, fittings and systems
EN13476-2 Plastic pipe system for drainage and sewerage without pressure underground - PVC-U, PP and PE
(PE) - Part 2. Type A, specification for pipe fittings with flat inner and outer surfaces
EN13476-3 Plastic pipe system for drainage and sewerage without pressure underground - PVC-U, PP and PE
(PE) - Part 3. Type B, specification for pipe fittings with flat inner and profiled outer surfaces
EN13598.2-2009 Plastic piping systems for rainwater and sewer water without underpressure - Unplasticized polyvinyl chloride (PVC-U), polypropylene
Ethylene (PP) and polyethylene (PE) - Part 2. Specifications for wellbore and manhole wells in traffic areas
EN14830-2006 Thermoplastic Inspection Manholes and Manhole Wellheads - Method for Determining the Instability of Buckling Resistance
3 Terms and Definitions, Abbreviations
The following terms and definitions, abbreviations apply to this document.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of CJ/T 233-2016_English be delivered?Answer: Upon your order, we will start to translate CJ/T 233-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of CJ/T 233-2016_English with my colleagues?Answer: Yes. The purchased PDF of CJ/T 233-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version CJ/T 233-2016?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version CJ/T 233-2016 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|