GB/T 45118-2024: Technical guide for grid connection of wave energy generation device
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Std IDVersionUSDBuyDeliver [PDF] inTitle (Description)
GB/T 45118-2024English279 Add to Cart 3 days [Need to translate] Technical guide for grid connection of wave energy generation device

Click to Preview a similar PDF

Basic data

Standard ID GB/T 45118-2024 (GB/T45118-2024)
Description (Translated English) Technical guide for grid connection of wave energy generation device
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F19
Classification of International Standard 29.240
Word Count Estimation 14,16
Date of Issue 2024-12-31
Date of Implementation 2026-01-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 45118-2024: Technical guide for grid connection of wave energy generation device


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 29.240 CCSF19 National Standard of the People's Republic of China Technical Guidelines for Grid Connection of Wave Energy Generation Devices Released on 2024-12-31 2026-01-01 implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 General Requirements 2 5 Power Control 2 6 Fault Ride-Through 2 7 Operational suitability 5 8 Power Quality 6 9 Relay protection and safety automatic devices 6 10 Dispatching Automation and Communication 7 11 Grid connection detection 7 References 8

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Electricity Council. This document is under the jurisdiction of the National Microgrid and Distributed Generation Grid Connection Standardization Technical Committee (SAC/TC564). This document was drafted by. China Southern Power Grid Electric Power Technology Co., Ltd., China Electric Power Research Institute Co., Ltd., Guangdong Power Grid Co., Ltd. Liability Company, Hainan Power Grid Co., Ltd., China Southern Power Grid Co., Ltd., Guangzhou Institute of Energy Conservation, Chinese Academy of Sciences, State Grid Hubei Electric Power Science Research Institute of Shandong Electric Power Co., Ltd. and Electric Power Science Research Institute of State Grid Shandong Electric Power Company. The main drafters of this document are. Wang Hongxing, Li Mingjun, Liu Shi, Duan Qing, Zhang Yao, Duan Xinhui, Wei Shenghua, Liang Chonggan, Chen Kun, Yang Yi, Liu Zhigang, Yu Peng, Sha Guanglin, Deng Weiss, Wang Kunlin, Cheng Yan, Chen Wen, Guo Xinran, Tao Tao, Yang Taolue, and Ou Wenjun. Technical Guidelines for Grid Connection of Wave Energy Generation Devices

1 Scope

This document specifies the power control, fault ride-through, operational adaptability, power quality, relay protection and Technical requirements for safety automatic devices, dispatching automation and communications, and grid connection detection. This document is applicable to the grid connection of new, rebuilt and expanded wave energy power generation devices connected to the grid at a voltage level of 10kV and above. Detect and run.

2 Normative references

The contents of the following documents constitute essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 12325 Power quality supply voltage deviation GB/T 12326 Power quality voltage fluctuation and flicker GB/T 14285 Technical specification for relay protection and safety automatic devices GB/T 14549 Power quality - Harmonics in public power grids GB/T 15543 Power quality three-phase voltage unbalance GB/T 19862 General requirements for power quality monitoring equipment GB/T 24337 Power quality - Interharmonics in public power grids GB/T 36572 Guidelines for network security protection of power monitoring systems GB 38755 Guidelines for safety and stability of power systems DL/T 448 Technical management regulations for electric energy metering devices

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Wave energy The kinetic and potential energy possessed by waves on the ocean surface. [Source. GB/T 34910.3-2017, 3.1] 3.2 A device that captures wave energy and converts it into electricity. Note. It consists of one or more wave energy generators, as well as power transformation and distribution systems, monitoring systems and auxiliary equipment and facilities. 3.3 response time From the time when the control command is received until the actual output change of the observed variable of the wave energy power generation device reaches the control target value and the initial value for the first time The time required for the difference from the initial value to be 90%.
...

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 45118-2024_English be delivered?


Answer: Upon your order, we will start to translate GB/T 45118-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 45118-2024_English with my colleagues?


Answer: Yes. The purchased PDF of GB/T 45118-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
Refund Policy Privacy Policy Terms of Service