Path:
Home >
GB/T >
Page733 > GB/T 47032-2026
Price & Delivery
US$579.00 · In stock · Download in 9 secondsGB/T 47032-2026: Code of operation evaluation for wind-photovoltaic-energy storage power station
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 47032-2026 | English | 579 |
Add to Cart
|
5 days [Need to translate]
|
Code of operation evaluation for wind-photovoltaic-energy storage power station
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 47032-2026 (GB/T47032-2026) |
| Description (Translated English) | Code of operation evaluation for wind-photovoltaic-energy storage power station |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | F19 |
| Classification of International Standard | 27.180 |
| Date of Issue | 2026-01-28 |
| Date of Implementation | 2026-05-01 |
GB/T 47032-2026: Code of operation evaluation for wind-photovoltaic-energy storage power station
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 27.180
CCSF19
National Standards of the People's Republic of China
Operation Evaluation Procedures for Combined Wind, Solar and Energy Storage Power Stations
Published on 2026-01-28
Implemented on May 1, 2026
State Administration for Market Regulation
The State Administration for Standardization issued a statement.
Table of contents
Preface III
1.Scope 1
2 Normative References 1
3.Terms and Definitions 1
4 Symbols 1
5.General Requirements 3
6.Evaluation Procedure 3
7.Evaluation Data 4
7.1 Basic Information 4
7.2 Operational Data 4
7.3 Data Processing 4
8.Evaluation Indicators and Calculation Methods 4
8.1 Evaluation Indicators 4
8.2 Calculation Method 5
9.Analysis and Evaluation 8.
10 Traceability Methods
10.1 Marking Method 10
10.2 Process Record 10
Appendix A (Informative) Operational Evaluation Data of Combined Wind-Solar-Storage Power Stations 11
A.1 Basic Information 11
A.2 Operational Data 12
Appendix B (Normative) Calculation Methods for Evaluation Indicators of Wind Power, Photovoltaic and Energy Storage Subsystems 19
B.1 Photovoltaic subsystem energy utilization rate 19
B.2 Equivalent utilization hours 19
B.3 Reliability Index 20
B.4 Operation and Maintenance Indicators 22
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents".
Drafting.
Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents.
This document was proposed and is under the jurisdiction of the China Electricity Council.
This document was drafted by. China Electric Power Research Institute Co., Ltd., State Grid Corporation of China, and State Grid Anhui Electric Power Co., Ltd.
Electric Power Research Institute, State Grid Shandong Electric Power Company Electric Power Research Institute, State Grid Hebei Electric Power Company Electric Power Research Institute, State Grid
Fujian Electric Power Company Limited, China Huadian Electric Power Research Institute Co., Ltd., State Grid Qinghai Electric Power Company Limited, State Grid Hunan Electric Power Company Limited
Economic and Technological Research Institute, State Grid Xinjiang Electric Power Co., Ltd., State Grid Hebei Zhangjiakou Wind-Solar-Storage New Energy Co., Ltd., State Power Investment Corporation
Xinjiang Energy and Chemical Industry Co., Ltd., Energy Engineering Times (Shanghai) New Energy Storage Technology Research Institute Co., Ltd., and State Power Investment Corporation Yellow River Upstream
Hydropower Development Co., Ltd., and China Energy Investment Corporation Science and Technology Research Institute Co., Ltd.
The main drafters of this document are. Qin Shiyao, Li Kecheng, Tao Yibin, Sang Bingyu, Zhou Caiqi, Sun Wenwen, Chen Zhilei, Wang Yiting, Tian Yunfeng, and Sun Xuejun.
Xu Bin, Li Guoqing, Yang Zhihao, Li Ze, Cheng Yan, Zhu Shaojie, Li Zhicheng, Wang Yu, Liu Yanzhang, Yu Haifeng, Yuan Lixiang, Zhao Zhou, Xie Yurong, Fan Bingjian,
Wang Jun, Ma Wei, Yang Di, You Long, Sun Bo, Li Guanjun, Zhang Lei, He Jing, Wang Shibai, Jiang Hua, Huang Mou, Wang Yifei, Chen Yuge, Zhu Fahua.
Operation Evaluation Procedures for Combined Wind, Solar and Energy Storage Power Stations
1 Scope
This document specifies the overall requirements, evaluation procedures, evaluation data, evaluation indicators and calculation methods for the operation evaluation of combined wind, solar and energy storage power stations.
Analysis, evaluation, and traceability methods.
This document applies to the operational evaluation of wind-storage, solar-storage, and combined wind-solar-storage power plants.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.
For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.
This document.
GB/T 36549 Operational Indicators and Evaluation of Electrochemical Energy Storage Power Stations
GB/T 51311 Standard for Commissioning and Acceptance of Combined Wind-Solar-Storage Power Stations
GB/T 51437 Design Standard for Combined Wind, Solar and Storage Power Stations
DL/T 793.6 Reliability Evaluation Code for Power Generation Equipment - Part 6.Wind Turbine Generator Sets
DL/T 793.7 Reliability Evaluation Procedure for Power Generation Equipment - Part 7.Photovoltaic Power Generation Equipment
DL/T 1815 Reliability Evaluation Procedure for Electrochemical Energy Storage Power Station Equipment
DL/T 2528 Basic Terminology for Electric Energy Storage
NB/T 10586 Standard Energy Utilization Rate Evaluation Procedure for Wind Power Plants
NB/T 31045 Wind Farm Operation Indicators and Evaluation Guidelines
3 Terms and Definitions
GB/T 36549, GB/T 51311, GB/T 51437, DL/T 793.6, DL/T 793.7, DL/T 1815, DL/T 2528,
The terms and definitions defined in NB/T 10586 and NB/T 31045, as well as the following terms and definitions, apply to this document.
3.1
jointtoperation hours
The wind-solar-storage combined power station operates in four modes. wind-solar-storage combined operation, wind-solar combined operation, wind-storage combined operation, and solar-storage combined operation.
The sum of the number of hours in the flight mode.
3.2
jointtoperation factor
The percentage of hours in which wind, solar and energy storage combined power plants operate together (3.1) during the statistical period.
4 symbols
The following symbols apply to this document.
Electricity (kWh) of combined wind, solar, and energy storage power plants settled in the market during the EMar statistical period
Eon's on-grid electricity generation from combined wind, solar, and energy storage power plants during the statistical period (kWh)
...