Home Cart Quotation Policy About-Us
www.ChineseStandard.net
Database: 221581 (27 Mar 2026)
SEARCH
Path: Home > GB/T > Page537 > GB/T 43687-2024

GB/T 43687-2024 PDF English

Price & Delivery

US$539.00 · In stock · Download in 9 seconds
GB/T 43687-2024: Technical requirements for compressed air energy storage system used for electrical energy storage
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Std IDVersionUSDBuyDeliver [PDF] inTitle (Description)
GB/T 43687-2024English539 Add to Cart 5 days [Need to translate] Technical requirements for compressed air energy storage system used for electrical energy storage

Click to Preview a similar PDF

Basic data

Standard ID GB/T 43687-2024 (GB/T43687-2024)
Description (Translated English) Technical requirements for compressed air energy storage system used for electrical energy storage
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F19
Classification of International Standard 27.180
Word Count Estimation 26,271
Date of Issue 2024-03-15
Date of Implementation 2024-10-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 43687-2024: Technical requirements for compressed air energy storage system used for electrical energy storage




---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 27.180 CCSF19 National Standards of People's Republic of China Technical requirements for compressed air energy storage systems for power energy storage Released on 2024-03-15 2024-10-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 General Requirements 3 5 System Classification 3 6 System Performance 4 7 Compressed Energy Storage System 4 8 Gas Storage System 5 9 Heat storage and exchange system 5 10 Expansion energy release system 6 11 Electrical System 6 12 Instrumentation and control systems 7 13 System performance test 7 Appendix A (Informative) Compressed Air Energy Storage System Architecture 19

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Electricity Council. This document is under the jurisdiction of the National Electric Energy Storage Standardization Technical Committee (SAC/TC550). This document was drafted by. Huaneng Jiangsu Energy Development Co., Ltd., China National Salt Jintan Salt Chemical Co., Ltd., Tsinghua University, China Energy Construction The group includes Jiangsu Electric Power Design Institute Co., Ltd., China Southern Power Grid Research Institute Co., Ltd., and Engineering Thermophysics Research Institute of the Chinese Academy of Sciences. Institute, China Electric Power Engineering Consulting Group Co., Ltd., China Energy Construction Digital Technology Group Co., Ltd., Xi'an Thermal Engineering Research Institute Co., Ltd., State Grid Jiang Jiangsu Electric Power Co., Ltd., Jiangsu Fangtian Electric Power Technology Co., Ltd., Shenyang Blower Group Co., Ltd., Xi'an Shaangu Power Co., Ltd., Dongfang Steam Turbine Co., Ltd. of Dongfang Electric Corporation, Harbin Steam Turbine Works Co., Ltd., China Special Equipment Inspection and Research Institute, China Salt Energy Storage Technology Co., Ltd., Huaneng Nanjing Jinling Power Generation Co., Ltd., and CGN Wind Power Co., Ltd. The main drafters of this document are. Cao Qingwei, Mei Shengwei, Chen Haisheng, Chen Hui, Guo Zuogang, Wang Guohua, Li Rui, Xue Zhiheng, Yang Hongyu, Zhang Hualiang, Ni Yu, Chen Laijun, Ding Hui, Wang Kaizhu, Niu Chenhui, Lin Tong, Chen Yongan, Zhai Xuan, Zhao Bo, Dai Qiangsheng, Wu Bin, Liu Xiaoming, Hou Yousong, Xue Xiaodai, Xuecheng Zhu, Bin Wang, Haitao Wang, Wenjun Liang, Chunlin Zhang, Yu Fang, Rishi Lu, Yanyan Cui, Weifeng Wang, Zhihui Jin, Tianwen Zheng, Tong Zhang, Tong Liu, Du Yunlong, Han Yuefeng, Wan Mingzhong, Xing Leqiang, Zhang Pengfei, Ai Hongwei, Yuan Chao, Gu Wen, Zhou Genbiao, Li Jun, Li Wen. Technical requirements for compressed air energy storage systems for power energy storage

1 Scope

This document specifies the system performance of compressed air energy storage system for power energy storage, compression energy storage system, gas storage system, heat storage and exchange system, expansion system, etc. The technical requirements for expansion energy release system, electrical system, instrumentation and control system, etc., describe the system performance test methods, and specify the system classification requirements. This document is applicable to compressed air energy storage systems with a rated discharge power of 1MW and a rated discharge energy of 2MW·h and above. System, compressed air energy storage systems of other power and energy shall be implemented for reference.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 150 (all parts) Pressure vessels GB/T 151 Heat Exchanger GB/T 384 Determination of calorific value of petroleum products GB/T 2624.2 Measurement of full pipe flow rate using differential pressure devices installed in circular cross-section pipes Part 2.Orifice plates GB/T 7064 Technical requirements for non-conductive pole synchronous generators GB/T 8117 (all parts) Steam turbine thermal performance acceptance test procedures GB/T 13609 Guidelines for Natural Gas Sampling GB/T 13610 Composition analysis of natural gas - Gas chromatography GB/T 14285 Technical specification for relay protection and safety automatic devices GB/T 18940 Measurement of gas flow in closed pipes - Turbine flowmeter GB/T 21391 Measurement of natural gas flow using gas turbine flowmeters GB/T 25357 Positive displacement rotary compressors for use in petroleum, petrochemical and natural gas industrial processes GB/T 25630 Turbine compressor performance test procedures GB/T 31130 Coriolis mass flowmeter GB/T 31464 Power grid operation guidelines GB/T 36293 Technical requirements for distributed control systems of thermal power plants GB/T 36572 Guidelines for network security protection of power monitoring systems GB 38755 Guidelines for safety and stability of power systems GB/T 40594 Technical Guidelines for Power System Network and Source Coordination GB/T 50062 Design specification for relay protection and automatic devices of power installations GB/T 50063 Design specification for electrical measuring instruments for power installations GB 50251 Code for Design of Gas Pipeline Engineering DL/T 544 Power Communication Operation Management Regulations DL/T 843 Technical requirements for synchronous generator excitation system DL/T 1402 Technical Specification for Synchronous Phaser Application at Plant and Substation DL/T 1870 Technical Specification for Power System Network Source Coordination
...

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 43687-2024_English be delivered?


Answer: Upon your order, we will start to translate GB/T 43687-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 43687-2024_English with my colleagues?


Answer: Yes. The purchased PDF of GB/T 43687-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
Refund Policy Privacy Policy Terms of Service