Home Cart Quotation Policy About-Us
www.ChineseStandard.net
Database: 221581 (27 Mar 2026)
SEARCH
Path: Home > GB/T > Page727 > GB/T 32900-2025

GB/T 32900-2025 PDF English

Price & Delivery

US$559.00 · In stock · Download in 9 seconds
GB/T 32900-2025: Technical requirements for relaying protection of photovoltaic power station
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB/T 32900: Historical versions

Std IDVersionUSDBuyDeliver [PDF] inTitle (Description)
GB/T 32900-2025English559 Add to Cart 5 days [Need to translate] Technical requirements for relaying protection of photovoltaic power station
GB/T 32900-2016English359 Add to Cart 3 days [Need to translate] Technical specification for relaying protection of photovoltaic power station

Click to Preview a similar PDF

Basic data

Standard ID GB/T 32900-2025 (GB/T32900-2025)
Description (Translated English) Technical requirements for relaying protection of photovoltaic power station
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K45
Classification of International Standard 29.240
Word Count Estimation 27,284
Date of Issue 2025-12-02
Date of Implementation 2026-04-01
Older Standard (superseded by this standard) GB/T 32900-2016
Issuing agency(ies) State Administration for Market Regulation, Standardization Administration of China

GB/T 32900-2025: Technical requirements for relaying protection of photovoltaic power station



---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 29.240 CCSK45 National Standards of the People's Republic of China Replaces GB/T 32900-2016 Relay protection technical requirements for photovoltaic power plants Published on 2025-12-02 Implemented on 2026-04-01 State Administration for Market Regulation The State Administration for Standardization issued a statement.

Table of contents

Preface III 1.Scope 1 2 Normative References 1 3.Terms and Definitions 1 4.General Requirements 3 5.Relay Protection Configuration Requirements 4 6.Relay protection setting requirements 9. 7.Setting Management Requirements 15 Appendix A (Informative) Typical Wiring Diagram of a Photovoltaic Power Station 17 Appendix B (Informative) Nominal Voltage and Average Rated Voltage for Each Voltage Level 20 References 21

Foreword

This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents". Drafting. This document replaces GB/T 32900-2016 "Technical Specification for Relay Protection of Photovoltaic Power Stations". Compared with GB/T 32900-2016, except for... Aside from structural adjustments and editorial changes, the main technical changes are as follows. ---The scope of the document has been changed (see Chapter 1, Chapter 1 of the.2016 edition); ---Added some terms and definitions (see 3.5, 3.13, 3.14); ---Added requirements for the photovoltaic power station setting calculation model and parameters (see 4.9); ---Added requirements for the operating performance of protection devices under low short-circuit ratios (see 4.10); ---Added performance requirements for current transformers used in relay protection (see 4.11); ---Added requirements related to the access of the collection system to voltage levels of 35kV and below (see 5.1.6); ---Added requirements for the configuration and setting of small current grounding protection in single-bay protection devices under the neutral point grounding via arc suppression coil (see...) 5.1.7, 6.1.15); ---Added operating requirements for grounding transformers under special operating modes and main step-up transformer wiring configurations (see 5.1.8 and 5.1.10); ---The configuration and setting requirements for the collection line protection have been changed (see 5.2, 6.2, and 5.2 and 6.2 in the.2016 version); ---The protection configuration and setting requirements for the sectionalizing circuit breakers on the busbar have been changed (see 5.4, 6.4, and 5.4 and 6.4 in the.2016 version); ---The protection configuration and setting requirements for the main step-up transformer have been changed (see 5.5, 6.5, and 5.5 and 6.5 in the.2016 version); ---The protection configuration and setting requirements for reactive power compensation equipment have been changed (see 5.6, 6.6, and 5.6 and 6.6 in the.2016 version); ---The protection configuration and setting requirements for station service transformers have been revised (see 5.7, 6.7, and 5.7 and 6.7 in the.2016 version); ---The configuration and setting requirements for grounding transformer protection have been revised (see 5.8, 6.8, and 5.8 and 6.8 in the.2016 version); ---The protection configuration and setting requirements for photovoltaic inverters and energy storage converters have been revised (see 5.9, 6.9, and 5.9 and 6.9 in the.2016 version); ---The protection configuration and setting requirements for unit transformers have been changed (see 5.10, 6.10, and 5.10 and 6.10 in the.2016 version); ---Added protection configuration and setting requirements for isolation transformers (see 5.11, 6.11); ---The configuration and setting requirements for low-current grounding fault location devices have been revised (see 5.12, 6.12, and 5.11 and 6.11 in the.2016 version); ---The anti-islanding protection configuration and setting requirements have been changed (see 5.13, 6.13, and 5.12 and 6.12 in the.2016 version); ---Added configuration requirements for fault information management devices (substations) (see 5.14.5~5.14.7); ---Added requirements for transformer neutral point grounding method (see 6.1.5); ---Added requirements for reclosing functionality for transmission lines with voltage levels of 110kV and below (see 6.1.13); ---Added general requirements when protection devices are simultaneously connected to the dispatching agency for regulation and the photovoltaic power station for self-management (see 7.1.7). Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents. This document was proposed and is under the jurisdiction of the China Electricity Council. This document was drafted by. Northwest Branch of State Grid Corporation of China, State Grid Corporation of China, and State Grid Shaanxi Electric Power Company. Scientific Research Institute, State Grid Gansu Electric Power Company, State Grid Qinghai Electric Power Company, Xi'an Jiaotong University, Nanjing NARI Relay Protection & Automation Co., Ltd. Shanghai Liqian Electric Power Technology Co., Ltd., Nanjing University of Technology, Beijing Zhongheng Borui Digital Power Technology Co., Ltd., State Grid Shandong Electric Power Company Silaiwu Power Supply Company, Northwest Survey and Design Institute of China Power Construction Group Co., Ltd., and Yunnan Power Grid Co., Ltd. Electric Power Research Institute Institute, State Grid Nanjing Automation Co., Ltd., XJ Electric Co., Ltd., Nanjing NARI Relay Protection Engineering Technology Co., Ltd., Sungrow Power Supply Co., Ltd. Joint-stock limited company. The main drafters of this document are. Zhang Jiankang, Chen Jieyu, Li Huaiqiang, Zhao Yi, Kong Xiangpeng, Ma Chao, Chang Zhongxue, Ling Gang, Chen Bangqiang, and Chen Jun. Li Jinwei, Meng Fanmin, He Qiang, He Yuankang, Yu Jiao, Xu Shoudong, Hou Wei, Xue Mingjun, Wang Zhiwei, Cao Xueyuan, Peng Shutao, Dong Dan. The release history of this document and the document it replaces is as follows. ---First published in.2016 as GB/T 32900-2016; ---This is the first revision. Relay protection technical requirements for photovoltaic power plants

1 Scope

This document specifies the general requirements, configuration requirements, setting requirements, and setting management requirements for relay protection of photovoltaic power stations. This document applies to relay stations connected to the grid at voltage levels of 10kV and above (including photovoltaic power stations equipped with electrochemical energy storage). Research and development, design, manufacturing, testing, commissioning, scheduling, operation, maintenance, and repair related to electrical protection. Other grid-connected photovoltaic power generation at different voltage levels. The station shall follow suit.

2 Normative references

The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included. For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies. This document. GB/T 14285-2023 Technical Specification for Relay Protection and Safety Automatic Devices GB/T 14598.24 Measuring relays and protective devices - Part 24.Transient data exchange (COMTRADE) for power systems Use format GB/T 19964-2024 Technical Specifications for Connecting Photovoltaic Power Stations to Power Systems GB/T 20840.2 Instrument Transformers - Part 2.Supplementary Technical Requirements for Current Transformers GB/T 29319 Technical Specifications for Photovoltaic Power Generation Systems Connected to Distribution Networks GB/T 34120 Technical requirements for energy storage converters in electrochemical energy storage systems GB/T 37138 Implementation Guidelines for Security Level Protection of Power Information Systems GB/T 37408-2019 Technical Requirements for Grid-Connected Photovoltaic Inverters GB/T 40864 Technical requirements for relay protection of flexible AC transmission equipment connected to the power grid DL/T 553 General Technical Conditions for Dynamic Recording Devices in Power Systems DL/T 559 Operation and Setting Procedures for 220kV~750kV Power Grid Relay Protection Devices DL/T 584 Operation and Setting Procedures for 3kV~110kV Power Grid Relay Protection Devices DL/T 866 Selection and Calculation Procedures for Current Transformers and Voltage Transformers DL/T 1455 Technical Requirements for Security and Evaluation of Power System Control Software NB/T 32004 Technical Specification for Photovoltaic Grid-Connected Inverters NB/T 42088 Technical Specification for Substations of Relay Protection Information System

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 This includes photovoltaic power generation systems and all types of buildings, electrical equipment, and auxiliary facilities that provide operation, inspection, and maintenance services for them. The power plant inside. [Source. GB 50797-2012, 2.1.6, with modifications]
...

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 32900-2025_English be delivered?


Answer: Upon your order, we will start to translate GB/T 32900-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 32900-2025_English with my colleagues?


Answer: Yes. The purchased PDF of GB/T 32900-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 32900-2025?


Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 32900-2025 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
Refund Policy Privacy Policy Terms of Service