GB/T 32897-2016 English PDFUS$439.00 ยท In stock  
  Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 32897-2016: General specifications for integrated protection and control equipment in smart substation Status: Valid 
 Basic dataStandard ID: GB/T 32897-2016 (GB/T32897-2016)Description (Translated English): General specifications for integrated protection and control equipment in smart substation Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K45 Classification of International Standard: 29.240 Word Count Estimation: 22,266 Date of Issue: 2016-08-29 Date of Implementation: 2017-03-01 Regulation (derived from): National Standard Announcement 2016 No.14 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 32897-2016: General specifications for integrated protection and control equipment in smart substation---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. General specifications for integrated protection and control equipment in smart substation ICS 29.240 K45 National Standards of People's Republic of China Intelligent substation multi - function protection and control integration device General technical conditions substation 2016-08-29 released 2017-03-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface III 1 Scope 1 2 normative reference document 1 3 Terms and definitions 2 Technical requirements 3 5 Test Method 11 6 Inspection rules 14 7 Marking, packaging, transportation and storage 16 8 Product accompanying documents 17 9 Quality Assurance 17 ForewordThis standard is drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed by the China Electricity Council and centralized. Please note that some of the contents of this document may involve patents. The issuer of this document does not assume responsibility for the identification of these patents. The drafting of the standard unit. Nanjing Nairui following the Electric Co., Ltd., the State Power Dispatching Control Center, China Southern Power Grid Power Dispatch Control Center, Guangdong Electric Power Design and Research Institute, Beijing Electric Power Dispatching Control Center, Shanghai Electric Power Dispatching Control Center, Southwest Electric Power Design Institute, wide State Power Supply Bureau, China Electric Power Research Institute, Henan Electric Power Test and Research Institute, Zhejiang Electric Power Test and Research Institute, Shanghai Electric Power Design Institute, Beijing Automation Co., Ltd., Guodian NARI Technology Co., Ltd., XJ Electric Co., Ltd., Beijing Quartet Jubao Automation Co., Ltd. Limited company. The main drafters of this standard. Xiong Muwen, Ding Li, Xu Peng, Jia Hongzhou, Li Jing, Zhang Shengfei, Yang Tao, Ai Shuyun, Peng Shikuan, Zhao Yong, Zhang Haiyang, Zengping, Li Yuping, Liao Zedong, Huang Xiaoming, Zhang Haichuan, Zhou Bin, Zhang Hao, Li Jiayi, Wang Yanhui, Lan Jinbo, Zhou Shaoliang. Intelligent substation multi - function protection and control integration device General technical conditions1 ScopeThis standard specifies the intelligent substation 35kV and below the voltage level multi-function protection and control integration device (hereinafter referred to as the device) The basic technical requirements, technical parameters, test methods and inspection rules, signs, packaging, transportation and storage requirements. This standard applies to intelligent substation in the 35kV and below the voltage level of multi-function protection and control integration device, and as such equipment Development, design, manufacture, testing and operation of the basis.2 normative reference documentsThe following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. GB/T 191 Packaging and storage icon (GB/T 191-2008, ISO 60780..1997, MOD) GB/T 2423.1-2008 Environmental testing for electric and electronic products - Part 2. Test methods - Test A. Low temperature (IEC 60068-2- 1..2007, IDT) GB/T 2423.2-2008 Environmental testing for electric and electronic products - Part 2. Test methods - Test B. High temperature (IEC 60068-2- 2..2007, IDT) GB/T 2900.1 Basic terminology for electrical terminology Electrician Terminology Relays GB/T 2900.49 Electrical terminology Power system protection (GB/T 2900.49-2004, IEC 60050-448..1995, IDT) GB/T 4798.2 Application of electrical and electronic products Environmental conditions Transport (GB/T 4798.2-2008, IEC 60721-3-2..1997, MOD) Basic test methods for relay protection and safety automatic devices GB/T 7261-2008 GB/T 9361-2011 Computer site safety requirements GB/T 11287-2000 Electrical relays - Part 21. Vibration, shocks, collisions and earthquakes for measuring relays and protective devices Test Part 1. Vibration Test (Sine) (IEC 60255-21-1. 1988, IDT) General specification for packaging of electromechanical products GB/T 13384 Telecontrol terminal equipment GB/T 13729-2002 GB/T 13850 AC power conversion to analog or digital signal of the electrical measurement transmitter (GB/T 13850-1998, IEC 688. 1992, IDT) Technical specification for relay protection and safety automatic device GB/T 14285-2006 GB/T 14598.9-2010 Measuring relays and protective devices - Part 22-3. Electrical harassment test Radiation electromagnetic field immunity (IEC 60255-22-3..2007, IDT) GB/T 14598.10-2012 Measuring relays and protective devices - Part 22-4. Electrical harassment test Electrical fast transients/pulses Group immunity test (IEC 60255-22-4..2008, IDT) Electrical relays - Part 22-1. Electrical harassment tests for measuring relays and protective devices GB/T 14598.13-2008. 1MHz pulse group immunity test (IEC 60255-22-1..2007, MOD) Measurement relays and protective devices - Part 22-2. Electrical disturbance test - Electrostatic discharge test GB/T 14598.14. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 32897-2016_English be delivered?Answer: Upon your order, we will start to translate GB/T 32897-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 32897-2016_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 32897-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |