Path:
Home >
GB/T >
Page163 > GB/T 27932-2011
Price & Delivery
US$329.00 · In stock · Download in 9 secondsGB/T 27932-2011: Assessment methods of earthquake-caused indirect economic loss
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 27932-2011 | English | 329 |
Add to Cart
|
3 days [Need to translate]
|
Assessment methods of earthquake-caused indirect economic loss
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 27932-2011 (GB/T27932-2011) |
| Description (Translated English) | Assessment methods of earthquake-caused indirect economic loss |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | P15 |
| Classification of International Standard | 91.120.25 |
| Word Count Estimation | 14,128 |
| Date of Issue | 2011-12-30 |
| Date of Implementation | 2012-03-01 |
| Quoted Standard | GB/T 18208.4 |
| Regulation (derived from) | Announcement of Newly Approved National Standards No. 23 of 2011 |
| Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
| Summary | This standard specifies the earthquake caused companies to stop production loss, land loss, loss of industrial relevance and regional indirect economic loss assessment methods. This standard applies to fart indirect economic losses caused by the assessment. |
GB/T 27932-2011: Assessment methods of earthquake-caused indirect economic loss
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Assessment methods of earthquake-caused indirect economic loss
ICS 91.120.25
P15
National Standards of People's Republic of China
Earthquake indirect economic loss assessment method
Issued on. 2011-12-30
2012-03-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
Introduction Ⅳ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 basic provisions 1
5 companies stop production loss assessment method
6 Land Damage Assessment 2
7 regional indirect economic loss assessment method
8 industry association Damage Assessment 3
Appendix A (normative) partitioning methods 5
Appendix B (normative) input-output table of contents and relationships 6
Associate Annex C (informative) Examples of industrial damage assessment 8
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
The standard proposed by China Seismological Bureau.
This standard by the National Standardization Technical Committee earthquake (SAC/TC225) centralized.
This standard was drafted. Institute of Engineering Mechanics, China Earthquake Administration.
The main drafters of this standard. both Qi Lin, Sun Botao, Miao Chong Gang, Zhong Jiangrong, Guoen Dong, Sun Jingjiang, Zhang makes the heart, such as Liu Shan, Daijun Wu.
Introduction
Contributed to the development of this standard is mainly due to.
a) Earthquake damage assessment economy, including the direct economic losses not only to assess the earthquake, the earthquake also include indirect economic losses
Assessment of earthquake relief and direct investment, need to gradually form a complete earthquake economic loss evaluation system;
b) Earthquake indirect economic loss assessment there are complex and diverse, the need to determine the earthquake indirect economic loss assessment
Content and unified earthquake indirect economic loss assessment method;
c) the results of the earthquake disaster indirect economic loss assessment has a wide range of needs that require earthquake science, earthquake disaster prevention, earthquake
After restoration and reconstruction work to provide a scientific basis.
Various earthquake indirect economic loss assessment process of the present standards of research proposed is based on full consideration of
Basic needs and circumstances of the earthquake disaster on the economic damage assessment, the analysis, induction, finishing work after making.
Earthquake indirect economic loss assessment method
1 Scope
This standard specifies the assessment of companies stop production losses caused by the earthquake, the loss of land, loss and regional industry association indirect economic losses
method.
This standard applies to the assessment earthquake caused indirect economic losses.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the edition are not applicable to the present
file. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 18208.4 earthquake field works - Part 4. Direct disaster damage assessment
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Earthquake indirect economic losses earthquake-causedindirecteconomicloss
Economic losses due to earthquake indirectly lead normal social and economic activities affected arising, including enterprise stopped production losses, production
Industry association loss, land losses.
3.2
Companies stop production losses earthquake-causedproductionstopand/orreductionlossofenterprise
The earthquake caused businesses full or partial loss of economic losses caused by production capacity.
3.3
Land loss earthquake-causedlandvaluereductionloss
The earthquake caused land prices to reduce the economic losses caused.
3.4
Loss related industries productionsections-connectedloss
The earthquake coordinating relations among various industries destroyed, the formation of local production resources (including resource productivity) and accumulation caused by sluggish
Economic losses.
3.5
Input-output table sectionsinput-outputtable
According to various industry sources put into distribution and use of the product and the whereabouts of a checkerboard arrangement of the balance sheet.
4 basic provisions
4.1 Earthquake indirect economic loss assessment include. enterprise stopped production loss, loss of land, the area of \u200b\u200bindirect economic losses, industrial relations
Union losses. You can select the appropriate assessment methods based on different assessment objectives.
4.2 stop production enterprises stop production loss damage assessment response within the earthquake-stricken areas to assess the various enterprises, and finally aggregated into the entire disaster area enterprise
Industry to stop production losses.
...