Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 27933-2011 English PDF

US$369.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 27933-2011: Preliminary cost estimation of post-earthquake rehabilitation of engineering structures
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 27933-2011369 Add to Cart 3 days Preliminary cost estimation of post-earthquake rehabilitation of engineering structures Valid

Similar standards

GB/T 17742   DB/T 60   GB 50191   GB 17741   GB 55021   GB/T 27932   

Basic data

Standard ID: GB/T 27933-2011 (GB/T27933-2011)
Description (Translated English): Preliminary cost estimation of post-earthquake rehabilitation of engineering structures
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: P15
Classification of International Standard: 91.120.25
Word Count Estimation: 16,199
Date of Issue: 2011-12-30
Date of Implementation: 2012-03-01
Quoted Standard: GB/T 18208.4-2011
Regulation (derived from): Announcement of Newly Approved National Standards No. 23 of 2011
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the post-earthquake restoration and reconstruction project funds early assessment procedures, requirements and methods. This standard applies to post-earthquake restoration and reconstruction project funds early assessments.

GB/T 27933-2011: Preliminary cost estimation of post-earthquake rehabilitation of engineering structures


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Preliminary cost estimation of post-earthquake rehabilitation of engineering structures ICS 91.120.25 P15 National Standards of People's Republic of China First post-earthquake recovery and reconstruction funds to assess project Issued on. 2011-12-30 2012-03-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Preface Ⅰ Introduction Ⅱ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 earthquake restoration and reconstruction project funds initial assessment step 1 5 2 Basic requirements Early recovery and reconstruction project funds after the earthquake assessment 2 6 Housing Restoration and reconstruction project funds after the earthquake Infrastructure 7 3 First Assessment Early recovery and reconstruction project funds after the earthquake to assess enterprise 8 4 First assessment of funding reconstruction projects after the earthquake 9 4 Summary Content report 10 4 Appendix A (normative) post-earthquake restoration and reconstruction project funds early assessment Step 5 Appendix B (normative) Restoration works of various types of infrastructure funds after the earthquake early assessment sub-system adjustment factor 6 After restoration and reconstruction project funds Annex C (normative) Enterprise earthquake early assessment sub-adjustment factor 8 Annex D (normative) recovery after the earthquake reconstruction funds early assessment report 9 References 11

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. The standard proposed by China Seismological Bureau. This standard by the National Standardization Technical Committee earthquake (SAC/TC225) centralized. This standard was drafted. Institute of Engineering Mechanics, China Earthquake Administration, Yunnan Seismological Bureau, Seismological Bureau of Xinjiang Uygur Autonomous Region. Drafters of this standard. Daijun Wu, Sun Botao, Miao Chong Gang, Song Lijun, Zhang Yong, Zhou whole, Yuan Yifan, Guoen Dong, Sun Jingjiang, ZHANG Ling heart, Qi Lin all, Wang Yanru.

Introduction

For post-earthquake recovery and reconstruction project funds necessary for the preliminary assessment, after the emergency rescue work, the scientific development to improve after the earthquake and accurate earthquake recovery Based reconstruction planning and programs for post-earthquake reconstruction project specification early assessment methods and procedures funds needed to develop this standard. This standard GB/T 18208.4-2011 "earthquake field works - Part 4. Direct disaster damage assessment" as the basis, taking into account the country After the earthquake reconstruction projects inside and outside the required research to develop assessments on the basis of funding. First post-earthquake recovery and reconstruction funds to assess project

1 Scope

This standard specifies the steps to restore the post-earthquake reconstruction project funds early assessment requirements and methods. This standard applies to the post-earthquake recovery and reconstruction project funds early assessment.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the edition are not applicable to the present file. For undated references, the latest edition (including any amendments) applies to this document. GB/T 18208.4-2011 earthquake field works - Part 4. Direct disaster damage assessment

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Post-earthquake restoration and reconstruction project funds costofpost-earthquakerehabilitationofengineeringstructures According to local requirements for seismic resistance of earthquake-damaged housing, infrastructure and businesses amount of funds needed reinforcement or reconstruction. 3.2 Housing Reconstruction Unit unitcostofrehabilitation Based on the price recovery after the earthquake, seismic construction to meet local requirements and the size of the original house before the earthquake same housing cost per unit area. 3.3 Reset Housing Price unitcostofrecovery Cost per unit area based on the current price, the original house built before the earthquake, the same specifications of the house. 3.4 Intensity influence coefficient intensity-influencedcoefficient Different intensity within the regional statistical units based on a weighted average of the population. (1) calculated according to the formula. II = Σ m = 6 I (i, m) P (i, m) P (i) (1) Where. I (i, m) --- i statistical unit in intensity value m area, m = 6,7,8,9,10,11,12; P (i, m) --- statistical units in the population of intensity values \u200b\u200bm area; P (i) --- The total population within the statistical unit i.

4 earthquake restoration and reconstruction project funds initial assessment step

To restore the 4.1 earthquake reconstruction funds at the beginning of the assessment shall be carried out in Appendix A. Recovery after 4.2 earthquake reconstruction funds at the beginning of the investigation and assessment district assessment shall GB/T 18208.4-2011 4.2 division. When the reconstruction project funds after the 4.3 earthquake early assessment survey should collect the following information.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 27933-2011_English be delivered?

Answer: Upon your order, we will start to translate GB/T 27933-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 27933-2011_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 27933-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.