YS/T 3021-2013: Calculation of gold recovery rate for CIP Process
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
YS/T 3021-2013English189 Add to Cart 3 days [Need to translate] Calculation of gold recovery rate for CIP Process Valid YS/T 3021-2013

PDF similar to YS/T 3021-2013


Standard similar to YS/T 3021-2013

GB/T 20899.1   YS/T 231   YS/T 254.1   YS/T 3029   YS/T 3030   YS/T 3028   

Basic data

Standard ID YS/T 3021-2013 (YS/T3021-2013)
Description (Translated English) Calculation of gold recovery rate for CIP Process
Sector / Industry Nonferrous Metallurgy Industry Standard (Recommended)
Classification of Chinese Standard D46
Classification of International Standard 77.150.01
Word Count Estimation 7,776
Regulation (derived from) Ministry of Industry and Information Technology Bulletin No. 52, 2013; industry standard for filing Notice No. 2 of 2014 (No. 170 overall)
Issuing agency(ies) Ministry of Industry and Information Technology
Summary This standard specifies: CIP gold recovery process Calculation methods. This standard applies to: the gold ore, gold flotation concentrate or by roasting, bio-oxidation pretreatment and other craft gold material gold cyanide CIP process theory of recovery

YS/T 3021-2013: Calculation of gold recovery rate for CIP Process

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Calculation of gold recovery rate for CIP Process ICS 77.150.01 D46 People's Republic of China Gold Industry Standards CIP process gold recovery calculation Issued on. 2013-10-17 2014-03-01 implementation Ministry of Industry and Information Technology of the People's Republic of China released

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. The standard proposed by China Gold Association. This standard by the National Gold Standardization Technical Committee (SAC/TC379) centralized. This standard was drafted. Changchun Gold Research Institute, Zijin Mining Group Co., Ltd., Shandong Gold Group. The main drafters of this standard. Zhao Guohui, Zhangqing Bo, Zou to Chang, Zhang Jinlong, Wu Luan East Song Guangjun, Wang Ping, Zhao Wei, Yue Hui, Sun Hongli, Zheng Ye, Teoh, Fu Hao, the Sun Zhongmei, Lu Jun. CIP process gold recovery calculation

1 Scope

This standard specifies the method of calculation of the CIP process gold recovery. This standard applies to gold ore, gold flotation concentrate or after roasting, bio-oxidation pretreatment process gold and other materials cyanide CIP work Theoretical calculation of Arts and gold recovery. This standard also applies to the resin slurry process gold recovery theoretical calculations.

2 Terms and definitions

The following terms and definitions apply to this document. 2.1 Gold ore goldbearingore From the gold-bearing ore deposit acquisition. 2.2 CIP process CIPprocess; Thecarbon-in-pulpprocess Material in gold cyanide leaching process, the use of activated carbon adsorption process cyanide solution to extract gold. 2.3 Cyanide ore gold-bearingmaterialbeforecyanideleaching Gold cyanide leaching into the material before the operation, referred to as the original cyanide. 2.4 Activated carbon activatedcarbon It can be used in granular amorphous carbon adsorption of metal ions in solution. 2.5 Cyanide Leaching suction cyanideleachingandcarbonadsorption Gold-bearing material to dissolve the gold in cyanide solution containing oxygen and carbon adsorption process utilizing a solution of gold. 2.6 Loaded carbon goldloadedcarbon Activated carbon adsorption of gold. 2.7 Mention carbon carbonstripping/separatingcarbonfrompulp Loaded carbon and slurry separation process. 2.8 Concentrated concentration Slurry system, so that part of the process liquid and slurry separation. 2.9 Filter filtration Under dynamic action, relying on the media to make the process solution and solids separation.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of YS/T 3021-2013_English be delivered?

Answer: Upon your order, we will start to translate YS/T 3021-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of YS/T 3021-2013_English with my colleagues?

Answer: Yes. The purchased PDF of YS/T 3021-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.