HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

YS/T 3012-2012 English PDF

US$319.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
YS/T 3012-2012: Technical specification of hydrochemical analysis for prevention and control gold mine water disaster
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
YS/T 3012-2012English319 Add to Cart 3 days [Need to translate] Technical specification of hydrochemical analysis for prevention and control gold mine water disaster Valid YS/T 3012-2012

PDF similar to YS/T 3012-2012


Standard similar to YS/T 3012-2012

GB/T 3190   GB/T 8005.1   YS/T 3005   YS/T 3004   YS/T 3009   YS/T 3002   

Basic data

Standard ID YS/T 3012-2012 (YS/T3012-2012)
Description (Translated English) Technical specification of hydrochemical analysis for prevention and control gold mine water disaster
Sector / Industry Nonferrous Metallurgy Industry Standard (Recommended)
Classification of Chinese Standard H60
Classification of International Standard 73.060.99
Word Count Estimation 12,153
Quoted Standard GB/T 8538; DZ/T 0064.2
Regulation (derived from) Ministry of Industry and Information Technology Bulletin No. 55 of 2012; industry standard filing Notice 2013 No. 2 (No. 158 overall)
Issuing agency(ies) Ministry of Industry and Information Technology
Summary This standard specifies the gold mine water hazard control technical specifications for chemical analysis of water. This standard applies to the gold mine water chemistry.

YS/T 3012-2012: Technical specification of hydrochemical analysis for prevention and control gold mine water disaster


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification of hydrochemical analysis for prevention and control gold mine water disaster ICS 73.060.99 H60 People's Republic of China Gold Industry Standards Gold Mine Flood Control Chemical Analysis of technical specifications Issued on. 2012-11-07 2013-03-01 implementation Ministry of Industry and Information Technology of the People's Republic of China released

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. The standard proposed by China Gold Association. This standard by the National Gold Standardization Technical Committee (SAC/TC379) centralized. This standard was drafted. Shandong Gold Mining (Laizhou) Island Gold Ltd., Central South University. The main drafters of this standard. Ching, Li Xi Bing, Li Wei, Zhaoguo Yan, Wang, Gong Fengqiang, Dingyue Xiang, Liu Aihua, Wang Fang, Lu Jintao, Wang Shanfei. Gold Mine Flood Control Chemical Analysis of technical specifications

1 Scope

This standard specifies the Gold Mine Flood Control Chemical Analysis technical specifications. Gold Mine Water Chemistry This standard applies.

2 Normative references

The following documents for the application of this document is essential, dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 8538 drinking natural mineral water testing methods DZ/T 0064.2 underground water quality testing methods of collection and preservation of water samples

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Water chemistry hydrochemistry Chemical properties of the water, changes of chemical composition, origin and distribution of the subjects. 3.2 Isotope isotope Having the same atomic number (ie the same number of protons, the same position in the periodic table), but different mass numbers, that is, different numbers of neutrons A set of nuclides.

4 acquisition and processing water chemistry samples

4.1 Water Sampling 4.1.1 Mining of surface water samples collected should choose a representative place. As mine near coastal, lakes, rivers, springs, drainage stones Hole and water holes and the like. 4.1.2 pit underground aquifer water samples shall be collected drilling water gushing, water inrush point, pumping water hole, borehole or roadway watering watering points. 4.1.3 For close to the sea mining, extraction should be close to nearby mines representative coastal water sample. 4.1.4 should be collected at the scene measuring water temperature, water samples to observe and describe physical properties (color, smell, taste, visible matter, etc.), and as far as possible PH measurement in the field. 4.1.5 Mine hydrogeological sampling should be ground in the mining work before a hydrological year. In the mining process, we should adhere to the daily Observations; in front of groundwater dynamic law did not grasp, should each observation 7d ~ 10d 1; be master of groundwater dynamic law, it should be Observation 1 to 3 times per month; when the rainy season or in case of unusual circumstances, should be appropriate to increase the number of observations. Water quality monitoring should be less than 2 times per year, Feng, the dry season, the 1st. 4.1.6 Mine Inflow conducted observations, the number of observations per month should be less than 3 times the amount of water used observations (m3/s) credited to two decimal places Bit. For larger water fracture zone, collapse column, it should be separately set up observatories for observation, observation from 1 to 3 times a month. Measure the water gushing

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of YS/T 3012-2012_English be delivered?

Answer: Upon your order, we will start to translate YS/T 3012-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of YS/T 3012-2012_English with my colleagues?

Answer: Yes. The purchased PDF of YS/T 3012-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.