HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

YS/T 3003-2012 English PDF

US$279.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
YS/T 3003-2012: Gold-bearing ore test sample preparation technical specifications

YS/T 3003: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
YS/T 3003-2012English279 Add to Cart 3 days [Need to translate] Gold-bearing ore test sample preparation technical specifications YS/T 3003-2012
YS/T 3003-2011English1869 Add to Cart 10 days [Need to translate] Regulations of the compilation on feasibility study report in the gold industry projects Valid YS/T 3003-2011

PDF similar to YS/T 3003-2012


Standard similar to YS/T 3003-2012

GB/T 20899.1   YS/T 231   YS/T 254.1   YS/T 3008   YS/T 3007   

Basic data

Standard ID YS/T 3003-2012 (YS/T3003-2012)
Description (Translated English) Gold-bearing ore test sample preparation technical specifications
Sector / Industry Nonferrous Metallurgy Industry Standard (Recommended)
Classification of Chinese Standard D46
Classification of International Standard 73.060.99
Word Count Estimation 7,784
Regulation (derived from) Ministry of Industry and Information Technology Bulletin No. 55 of 2012; industry standard filing Notice 2013 No. 2 (No. 158 overall)
Issuing agency(ies) Ministry of Industry and Information Technology

YS/T 3003-2011: Regulations of the compilation on feasibility study report in the gold industry projects


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Regulations of the compilation on feasibility study report in the gold industry projects ICS 73.060.99 D46 People's Republic of China Gold Industry Standards Gold Industry Project Feasibility Study Report Preparation of specifications Issued on. 2011-05-18 2011-06-01 implementation Ministry of Industry and Information Technology of the People's Republic of China released

Table of Contents

Introduction Ⅴ Introduction Ⅵ 1 Scope 1 1 2 General Requirements 2 and 3 staffing structure 3.1 Subjects 2 3.1.1 Project Overview 2 3.1.2 scheduled basis and principles 2 3.1.3 Construction Conditions 3 3.1.4 outside the scope of the project design and project engineering support precinct 3 3.1.5 Construction Scale and Product Plan 3 3.1.6 The main design 3 3.1.7 environmental protection, energy conservation, safety and health, water and soil conservation and fire 5 3.1.8 Project construction schedule 5 3.1.9 The design of innovative content 5 3.1.10 investment and economic effects of 5 3.1.11 Conclusions, problems and recommendations 6 6 3.2 Market Forecast 3.2.1 product supply and demand forecasts 6 3.2.2 Target Market Analysis 6 3.2.3 The price forecast 6 3.2.4 Product Marketing 7 3.3 Geological Resources 7 3.3.1 Mining and Geological before 7 3.3.2 deposit mining conditions 7 3.3.3 Geological exploration work reviewed 8 3.3.4 Mineral Resources/Reserves 8 3.3.5 infrastructure and productive exploration and sampling and analysis 8 3.3.6 Geological Resources Evaluation 8 3.3.7 Problems and Suggestions 8 3.4 Mining 8 3.4.1 Mining method 8 3.4.2 Mining Area 9 OK 3.4.3 OPEN PIT 9 3.4.4 opencast stripping work 9 3.4.5 Mining Method 10 3.4.6 mine work system and production capacity 10 3.4.7 pioneering transport system 11 3.4.8 Mine Ventilation System 11 3.4.9 Anti-Mine Drainage System 11 3.4.10 Hydraulic placer mining 12 3.4.11 filling material and filling facility 12 3.4.12 Auxiliary facilities 12 3.4.13 underground construction 13 3.4.14 mine infrastructure projects and the amount of capital schedule 13 3.4.15 mine production schedule 13 3.4.16 Mining Machinery 13 3.4.17 Problems and Suggestions 14 14 3.5 beneficiation 3.5.1 Overview 14 3.5.2 ore 14 3.5.3 beneficiation tests 15 3.5.4 design process, the main indicators and operating conditions 15 3.5.5 production capacity and work systems 15 3.5.6 Major equipment selection 15 3.5.7 plant layout and equipment configuration 15 16 3.5.8 Auxiliary facilities 3.5.9 The design of the application of new technology, new equipment 16 3.5.10 The main problem exists and recommendations 16 3.6 Smelting 16 3.6.1 gold refining 16 3.6.2 Gold Smelter 17 3.6.3 Acid 18 3.7 tailings facility 19 19 3.7.1 Design Basis 19 3.7.2 Design of tailings 3.7.3 Tailings transport 20 3.7.4 tailings discharge mode 20 3.7.5 Tailings Reservoir seepage 20 3.7.6 backwater 20 3.7.7 Tailings Management 21 3.7.8 Problems and Suggestions 21 21 3.8 General Layout and Transportation 21 3.8.1 Site Selection 3.8.2 General Layout 21 3.8.3 General layout 22 3.8.4 dump and residue field 22 3.8.5 internal and external transport 23 3.9 Power and communication 23 3.9.1 Power 23 3.9.2 Communication 24 3.10 Automation Instrumentation 25 3.10.1 automation equipment and automation level requirements 25 3.10.2 Computer Management Control System 25 3.11 Drainage 25 3.11.1 Water 25 3.11.2 Drainage 26 3.12 heating, ventilation, air conditioning and heat 26 3.12.1 Design Basis 26 3.12.2 design biography 26 3.12.3 Heating 26 3.12.4 ventilation and dust removal 26 3.12.5 air conditioning 26 3.12.6 Heat 27 3.13 machine, gas, electricity and repair depot 27 3.13.1 machine repair 27 3.13.2 Auto Repair 27 3.13.3 28 oil storage facilities 3.13.4 Warehouse 28 3.14 Civil Engineering 28 3.14.1 Basic profile 28 3.14.2 building structure type 28 3.14.3 29 administrative welfare facilities 3.15 Environmental Protection 29 3.15.1 Design Basis 29 Status 3.15.2 Construction Area Environment 29 3.15.3 major sources and governance programs 29 3.15.4 Environmental Management Organization 29 3.15.5 Environmental Investment estimation 29 The environmental impact of construction projects on the surrounding areas 3.15.6 Analysis 29 3.15.7 Environmental impact assessment conclusions and recommendations 30 3.16 labor safety, industrial hygiene and fire 30 3.16.1 Design Basis 30 3.16.2 Analysis of risk factors and the degree of harm 30 3.16.3 Safety measures 30 3.16.4 Industrial Hygiene 30 3.16.5 Safety and health institutions set Capacity 30 3.16.6 Safety and Health Investment estimation 30 3.16.7 30 fire facilities 31 3.17 Soil and Water Conservation and Reclamation 3.17.1 Basis of Preparation 31 Status 3.17.2 Mining and Water Conservation 31 3.17.3 Factors and mine soil erosion hazard 31 3.17.4 Soil and Water Conservation and Reclamation Scheme 31 Measures to ensure the implementation of the program 31 3.17.5 3.18 energy saving, emission 32 3.18.1 energy consumption indicators and analysis 32 3.18.2 32 energy-saving measures 3.18.3 reduction measures 32 Comprehensive Utilization of Resources 32 3.19 3.19.1 Geological Resources Comprehensive Utilization 32 3.19.2 valuable metals comprehensive recovery resources 32 3.19.3 tailings comprehensive utilization of resources 32 3.19.4 Additional Resources Comprehensive Utilization 32 3.20 Project Implementation Plan 32 3.20.1 Project Scope 32 3.20.2 control project construction period and 32 3.20.3 construction schedule 33 3.21 organization and Capacity 33 3.21.1 organization 33 3.21.2 Labour Capacity 33 3.21.3 labor productivity 33 3.21.4 wages 33 3.21.5 Staff training 34 3.22 Estimated Investment and financing 34 3.22.1 Investment estimation 34 3.22.2 Liquidity estimate 37 3.22.3 financing 37 3.22.4 Total investment 37 3.23 Costs and expenses 37 3.23.1 Costing content 37 3.23.2 costs and costing 38 3.23.3 Cost Analysis 38 3.24 Financial Analysis 38 3.24.1 technical and economic indicators 38 3.24.2 Economic evaluation of basic parameters and instructions 38 3.24.3 Economic Effect Analysis (profit and loss) 39 3.24.4 surplus of capacity analysis 39 3.24.5 solvency analysis 39 3.24.6 Risk Analysis 40 3.24.7 Financial Evaluation conclusions 40 Appendix A (informative) "gold enterprise content and depth feasibility study of the principles of the provisions" relevant drawings 67 Annex B (informative) "gold enterprise content and depth feasibility study of the principles of the provisions" related accessories 68

Foreword

The standard proposed by China Gold Association. This standard by the National Gold Standardization Technical Committee (SAC/TC379) centralized. This standard drafting units. China National Gold Group Corporation, Changchun Gold Design Institute. The main drafters of this standard. Wang Zhongmin, Ji Qiang, Zhang articles, Bao Haiwen MEDICINE IN king Amano, Dong Weijun, Li continued, pay Friends of Hill, Lee Chong, Zhao Xiaofeng, Wangjing Rong, Wang Yan, Liu Wei, Xue Shubin, Li Weidong, with the sea Ying, Ren Jinrui Zhang ceremony, Zhen Jianjun, Hua Tiejun.

Introduction

"Gold Enterprise content and depth feasibility study of the principles of the provisions" in the first edition in September 1988 by the former State Gold Administration Organization Code System, has been promulgated and implemented more than ten years in the gold industry, gold industry feasibility study on construction projects played a better specification for use. With the rapid development of China's market economy, changes in construction management system, changes in national tax and investment regime, the State Council, the country Home Development and Reform Commission, Ministry of Land Resources, Ministry of Environmental Protection, State Administration of Work Safety of mining development proposed new construction Let philosophy and mandatory provisions in the new developments, national and industry requirements to further regulate the conduct and guidelines for resource development. For the Gold Scientific development of mineral resources, sustainable development and comprehensive recycling, resource-saving and environment-friendly green mining enterprises, and mining section Energy conservation, production safety, efficiency, clean target, the gold industry project feasibility study proposed a higher demand, the original feasibility Content and depth of study can not meet the provisions of the current period, the urgent need for the original feasibility study regulations be revised to meet the state's industrial affairs It requires policy adjustments and gold industrial construction projects. In order to strengthen the preliminary work of gold industry construction projects, investment decision-making more scientific and effectively avoid investment risks, summarized in gold "Gold Enterprise content and depth feasibility study of the principles of the provisions" on the basis of experience and industrial projects on the 1988 edition, with reference to domestic and feasible Experience in the preparation and practice of research reports, formulated regulations. According to the National Development and Reform Commission approval number "Industrial Development and Reform Office 2004 [1951] supplementary program requirements," May 2008 Changchun Gold Design Institute Start of the former State Gold Administration Edition 1988 "gold enterprises feasibility study content and depth of principles laid down" revision, in 2008 December preliminary preparation of the "gold industry project feasibility study content and depth of principles laid down" by the China National Gold Group Corporation experts Review. According to the China Gold Association in late April 2009, assigned the task plan in May 2009 to review by Changchun Gold Design Institute The first draft of extensive consultation of the relevant design units golden opinions, its contents have been amended and supplemented, while the standard name to "Gold workers Preparation of specifications "industry project feasibility study report. Gold Industry Project Feasibility Study Report Preparation of specifications

1 Scope

This standard specifies the contents of the feasibility study report and the depth of the gold industry project preparation requirements. This standard applies to new construction, expansion, renovation project preparation gold industry (gold mining, gold smelter) feasibility study report.

2 General

(1) Feasibility Study Report units should be objective, impartial scientific work, accurately reflect the main difference occurred during the study Opinion, should not have a false description, misleading statements and material omissions. Feasibility study report, the content to be complete, the text to be concise text Thing to complete, the unit should prepare administrative, technical director and chief designer of the project signature (seal). (2) the feasibility study report after the examination and approval, is based on the preliminary design to be followed. (3) preparation of feasibility study report should be made in the relevant design data. --- Review comments on the project proposals or initial (pre) feasibility study report; --- Large-scale mine construction projects must have geological exploration report and the State Land and Resources issued by the department or resource/reserve record card review Ming; sized mine construction projects must have detailed geological investigation report issued by the Department of Land and Resources and resource/reserve record review prove; Engineering Geology --- construction area, preliminary hydrogeological survey reports or information; --- Earthquake construction areas, meteorological data; --- Beneficiation test report, environmental test reports, metallurgical test report; --- 1.2000 plant topographic map, 1.2000 ~ 1.10 000 topographic maps for mining, 1.50000 area map; --- Construction Area Environmental Quality and the local environmental protection departments on the project requirements; --- Land Administration Department agreed in principle to the project site and land prices advice; --- With the local power supply, water supply, transportation and other sectors related to the signing of the agreement; --- On the financing of an agreement of intent; --- On the main raw material, fuel supply agreement of intent; --- Biography estimation and economic analysis techniques necessary; --- For the expansion project, the information provided by the original enterprise; --- Owners commissioned to design units in the preparation of the feasibility study, design instructions or engineering consulting (design) contract. When the owner is temporarily unable to provide all of the above information, design units and owners should study together is still a lack of information on how to solve in order to design Liaison Conference Summary ways to text, and present a feasibility study report of the annex. (4) the project feasibility study report should be multi-program comparison programs and technical and economic analysis, be technologically advanced and economically Reasonable and reliable safety and environmental protection. Error rate estimated investment feasibility study and preliminary design estimates should be within plus or minus 10%. (5) shall be entrusted by the national authorities approved the project feasibility study report prepared advisory unit, engineering consulting units to submit feasibility The study report, the unit should be "consulting engineering credentials" microprinting original member as part of its feasibility study report submitted together. (6) the preparation of multiple unit shared project, it should determine which one team is the overall production units. Overall Prepared should Responsible for consultation and for the compilation unit, so that all parts work interrelated, unified standard, without repeating, seamless entry and excellent overall plan to deal with Of responsible. Units should be required to participate in the preparation of the overall production units to ensure quality and progress.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of YS/T 3003-2012_English be delivered?

Answer: Upon your order, we will start to translate YS/T 3003-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of YS/T 3003-2012_English with my colleagues?

Answer: Yes. The purchased PDF of YS/T 3003-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version YS/T 3003-2012?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version YS/T 3003-2012 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.