US$549.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. YS/T 118.16-2012: Methods of determination and calculation of heat balance in metallurgical furnaces for heavy non-ferrous metals(Copper flash smelting furnace) Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
YS/T 118.16-2012 | English | 549 |
Add to Cart
|
4 days [Need to translate]
|
Methods of determination and calculation of heat balance in metallurgical furnaces for heavy non-ferrous metals(Copper flash smelting furnace)
| Valid |
YS/T 118.16-2012
|
PDF similar to YS/T 118.16-2012
Basic data Standard ID | YS/T 118.16-2012 (YS/T118.16-2012) | Description (Translated English) | Methods of determination and calculation of heat balance in metallurgical furnaces for heavy non-ferrous metals(Copper flash smelting furnace) | Sector / Industry | Nonferrous Metallurgy Industry Standard (Recommended) | Classification of Chinese Standard | H01 | Classification of International Standard | 77.120 | Word Count Estimation | 21,216 | Regulation (derived from) | Ministry of Industry and Information Technology Bulletin 2012 No. 70; industry standard filing Notice 2013 No. 3 (total 159) | Issuing agency(ies) | Ministry of Industry and Information Technology | Summary | This standard specifies the copper flash smelting furnace heat balance measurement and calculation basis, Equipment Overview and production process, heat balance measurement conditions, the heat balance measurement items and methods, material balance, hea |
YS/T 118.16-2012: Methods of determination and calculation of heat balance in metallurgical furnaces for heavy non-ferrous metals(Copper flash smelting furnace) ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Methods of determination and calculation of heat balance in metallurgical furnaces for heavy non-ferrous metals (Copper flash smelting furnace)
ICS 77.120
H01
People's Republic of China Nonferrous Metals Industry Standard
Heavy non-ferrous metallurgical furnaces thermal balance determination and calculation method
(Copper flash smelting furnace)
Issued on. 2012-12-28
2013-06-01 implementation
Ministry of Industry and Information Technology of the People's Republic of China released
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard by the national non-ferrous metals Standardization Technical Committee (SAC/TC243) centralized.
This standard is drafted by. Jinchuan Group Limited.
Participated in the drafting of this standard. Central South University.
This standard was drafted. Yuezhan Bin, Zhou Min, Wan Ai-dong, LIU Yu-qiang, Qi Hongbin, Yang Gui Yan, Zhou Min relic, painted HU Bing, FUNCTIONALIS
And Liu.
Heavy non-ferrous metallurgical furnaces thermal balance determination and calculation method
(Copper flash smelting furnace)
1 Scope
This standard specifies the copper flash smelting furnace thermal balance determination and calculation of baseline survey and production process equipment, measurement conditions of thermal equilibrium,
Heat balance measurement items and methods, material balance, heat balance, the main indicators of energy consumption, heat balance measurement results analysis and recommendations for improvement.
This standard applies to copper flash smelting furnace.
2 thermal balance determination and calculation of the reference
2.1 the reference temperature and pressure
Copper flash smelting furnace ambient temperature of the reference temperature.
Reference pressure is a standard atmospheric pressure, that is 101325 Pa (Pa).
2.2 Determination of heat balance system
Copper flash smelting furnace for the thermal balance determination system. Material balance and heat balance from the charge, fuel, flux, wind, etc. into the furnace into the furnace at the beginning,
To matte mouth, mouth slag, waste heat boiler flue gas outlet so far.
2.3 Units
Material balance calculations using units of kg/h, using heat balance calculation unit kJ/h.
3 Device Overview and production process
3.1 Equipment Overview
Copper flash smelting furnace equipment before fill in Table 1.
Table 1 ××× ××× factory workshop copper flash smelting furnace equipment before
No. Item Unit content or data
1 of the furnace length of civilian service
2 Last Overhaul date
3 design concentrates capacity t/a
4 furnace size (length × width) m × m
5 fuel type
6 kVA transformer rated power
7 the number of electrodes root
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of YS/T 118.16-2012_English be delivered?Answer: Upon your order, we will start to translate YS/T 118.16-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of YS/T 118.16-2012_English with my colleagues?Answer: Yes. The purchased PDF of YS/T 118.16-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|