HOME
Cart(4)
Quotation
About-Us
Policy
PDFs
Standard-List
www.ChineseStandard.net
Database: 189760 (18 Oct 2025)
TB 10624-2020 English PDF
Standard ID
Contents [version]
USD
STEP2
[PDF] delivered in
Standard Title (Description)
Status
PDF
TB 10624-2020
English
RFQ
ASK
3 days [Need to translate]
Code for Design of Suburban Railway
Valid
TB 10624-2020
PDF similar to TB 10624-2020
Standard similar to TB 10624-2020
TB 10505
TB 10106
TB 10101
TB 10630
TB 10625
TB 10621
Basic data
Standard ID
TB 10624-2020 (TB10624-2020)
Description (Translated English)
Code for Design of Suburban Railway
Sector / Industry
Railway & Train Industry Standard
Classification of Chinese Standard
P65
Classification of International Standard
93.100
Word Count Estimation
487,438
Date of Issue
2020-12-24
Date of Implementation
2021-02-01
Issuing agency(ies)
National Railway Administration
Summary
This standard applies to newly built urban (suburban) railways with standard gauges and AC/DC electric traction with a design speed of 100 km/h��160 km/h. The design speed is divided into 100 km/h, 120 km/h, and 140 km/h. There are four levels of h and 160 km/h. For projects that use existing railways to operate urban (suburban) trains, technical standards such as the speed of reconstruction and design should be reasonably determined based on their functional positioning and current conditions, and should comply with the relevant provisions of this standard for the use of existing railways. The design of urban (suburban) railways should reflect people-oriented, convenient for passengers to travel, and should be based on flexible marshalling and high-density