Powered by Google-Search & Google-Books Chinese Standards Shop Database: 169760 (Dec 7, 2019)
 HOME   Quotation   Tax   Examples Standard-List   Contact-Us   View-Cart
  

TB 10423-2014

Chinese Standard: 'TB 10423-2014'
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusRelated Standard
TB 10423-2014English1350 Add to Cart 0--10 minutes. Auto immediate delivery. Standard for Constructional Quality Acceptance of Railway Station and Yard Engineering Valid TB 10423-2014
TB 10423-2014Chinese99 Add to Cart <=1-day [PDF from Chinese Authority, or Standard Committee, or Publishing House]

 TB 10423-2014 -- Click to view the ACTUAL PDF of this standard (Auto-delivered in 0~10 minutes) In 0~10 minutes time, full copy of this English-PDF will be auto-immediately delivered to your email. See samples for translation quality.  
Detail Information of TB 10423-2014; TB10423-2014
Description (Translated English): Railway & Train
Sector / Industry: Railway & Train Industry Standard
Classification of Chinese Standard: S14
Classification of International Standard: 93.100
Word Count Estimation: 171,189
Date of Issue: 5/7/2014
Date of Implementation: 8/1/2014
Older Standard (superseded by this standard): TB 10423-2003
Drafting Organization: China Railway Five Board Group Limited
Administrative Organization: National Railway Administration of Science and Technology and Legal System
Regulation (derived from): National Rail Division Act [2014] No. 22
Summary: This standard applies to the new construction, alteration of the standard rail gauge railway station construction quality acceptance.

TB 10423-2014
TB
INDUSTRY STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
UDC
P TB 10423-2014
J 1827-2014
Standard for constructional quality acceptance
of railway station and yard engineering
铁路站场工程施工质量验收标准
ISSUED ON. MAY 07, 2014
IMPLEMENTED ON. AUGUST 01, 2014
Issued by. Ministry of Railway of PRC
Table of Contents
Foreword ... 9 
1 General provisions ... 12 
2 Terms ... 14 
3 Basic provisions ... 17 
3.1 General provisions ... 17 
3.2 Division of engineering construction quality acceptance ... 19 
3.3 Engineering construction quality acceptance ... 24 
3.4 Procedures and organizations of engineering construction quality acceptance
... 26 
4 Subgrade waterproof and drainage ... 30 
4.1 General provisions ... 30 
4.2 Drainage blind ditch ... 31 
4.3 Drainage pipeline ... 32 
4.4 Drainage trench ... 34 
4.5 Well chamber and water collection well ... 35 
4.6 Side ditch and drainage ditch ... 37 
4.7 Gutter and intercepting ditch ... 38 
4.8 Drop and torrent ditch ... 39 
4.9 Water collecting pool ... 40 
4.10 Drainage system connection ... 41 
5 Station road ... 41 
5.1 Station road subgrade filling ... 41 
5.2 Subbase layer and cushion ... 43 
5.3 Base layer ... 46 
5.4 Cement concrete pavement surface layer ... 48 
5.5 Asphalt concrete surface layer and asphalt macadam (gravel) surface layer .. 50 
5.6 Asphalt penetration pavement ... 53 
5.7 Asphalt surface treatment pavement ... 54 
5.8 Clay bond (graded) macadam (gravel) pavement ... 56 
5.9 Curbs ... 57 
5.10 Horizontal corridor pavement ... 58 
5.11 Road signs ... 60 
5.12 Road guardrail ... 61 
5.13 Clearance limit portal and frame ... 62 
5.14 Protection pier and protection wall ... 64 
6 Tunnel ... 66 
6.1 General Provisions ... 66 
6.2 Tunnel plastering ... 66 
6.3 Veneer (bricks) ... 68 
6.4 Ceiling decoration ... 70 
6.5 Entrance and exit steps and ramp walkways ... 71 
6.6 Tunnel drainage ... 73 
7 Pedestrian overpass ... 74 
7.1 General Provisions ... 74 
7.2 Foundation ... 75 
7.3 Concrete structure cast-in-place and precast components ... 76 
7.4 Concrete component installation ... 78 
7.5 Steel structural member fabrication ... 80 
7.6 Steel structure welding ... 80 
7.7 Steel structure bolt connection ... 82 
7.8 Support ... 84 
7.9 Steel structure coating ... 85 
7.10 Overpass canopy ... 86 
7.11 Overpass railing ... 87 
7.12 Veneer (bricks) ... 89 
8 Platform ... 89 
8.1 General provisions ... 89 
8.2 Platform wall foundation ... 90 
8.3 Prefabricated assembly concrete platform wall ... 90 
8.4 Masonry platform wall ... 93 
8.5 Cast-in-place concrete platform wall ... 94 
8.6 Platform filling ... 95 
8.7 Concrete platform surface ... 96 
8.8 Block pavement platform surface ... 97 
8.9 Platform wall acoustic panel ... 98 
8.10 Platform auxiliary facilities ... 100 
9 Canopy ... 102 
9.1 General provisions ... 102 
9.2 Foundation ... 102 
9.3 Concrete structures (components) ... 103 
9.4 Decoration ... 105 
9.5 Concrete component installation ... 106 
9.6 Steel structural member production ... 106 
9.7 Steel structure welding ... 107 
9.8 Steel structure bolt connection ... 107 
9.9 Steel structure coating ... 108 
9.10 Canopy cover ... 108 
10 Container and cargo yard ... 109 
10.1 General provisions ... 109 
10.2 Cushion ... 109 
10.3 Base layer ... 109 
10.4 Cast-in-place concrete surface layer ... 109 
10.5 Interlocking block pavement ... 110 
10.6 Cast-in-place concrete bar beam ... 112 
11 Acoustic (wind) barrier ... 113 
11.1 General provisions ... 113 
11.2 Foundation ... 113 
11.3 Component installation ... 116 
12 Fence and wall ... 118 
12.1 Fence ... 118 
12.2 Walls ... 120 
13 Lamppost, lighthouse, light bridge ... 121 
13.1 General provisions ... 121 
13.2 Lamppost, lighthouse, light bridge foundation ... 122 
13.3 Lamppost, lighthouse, light bridge installation ... 123 
14 Gravity loading storage and hopper bin ... 126 
14.1 Foundations ... 126 
14.2 Warehouse body ... 126 
15 Static sign ... 127 
15.1 General provisions ... 127 
15.2 Static sign installation ... 128 
16 Integrated pipe trench ... 130 
16.1 General provisions ... 130 
16.2 Pipe trench foundation ... 131 
16.3 Pipe trench construction ... 132 
16.4 Well chamber ... 133 
17 Stopper and speed control device ... 135 
17.1 Stopper ... 135 
17.2 Speed control device ... 137 
18 Other structures of station yard ... 138 
18.1 Crane walking track ... 138 
18.2 Inspection pit ... 140 
18.3 Equipment foundation ... 142 
19 Comprehensive quality assessment of station yard engineering ... 145 
19.1 Unit-engineering Quality Control Data Verification ... 145 
19.2 Unit-engineering physical quality and main function inspection ... 146 
19.3 Unit-engineering appearance quality assessment ... 148 
Wording descriptions of this code ... 154 
Foreword
This standard is compiled in accordance with the requirements of “Notice on
issuing the compilation plan of railway engineering construction standards in
2009” (TJSH [2009] No.34), based on the “Standard for constructional quality
acceptance of railway station and yard engineering” (TB 10423-2003), well
absorbing the construction and operation experiences of such high speed
railways as Beijing - Tianjin, Wuhan - Guangzhou, Zhengzhou - Xi’an, Hefei -
Nanjing, Hefei - Wuhan, Shijiazhuang - Taiyuan, etc., as well as the speed-up
work experience of such railways as Beijing - Guangzhou, Hangzhou - Zhuzhou,
Jiaozhou - Ji’nan, Zhengzhou - Xuzhou, etc.
This standard is used in conjunction with in line with the “Standard for
constructional quality acceptance of railway concrete engineering” (TB 10424),
“Standard for constructional quality acceptance of railway subgrade
engineering” (TB 10414), “Standard for constructional quality acceptance of
railway bridge and culvert engineering” (TB 10415), “Standard for
constructional quality acceptance of high-speed railway earth structure
engineering” (TB 10751), “Standard for constructional quality acceptance of
high-speed railway bridge and culvert engineering” (TB 10752).
The standard consists of 19 clauses, the main contents include. general
provisions, terms, basic provisions, subgrade waterproof and drainage, road of
railway station an yard, tunnel, pedestrian overpass, platform, canopy,
container and cargo yard, acoustic/wind fencing, fences and wall, lamppost
lighthouse and lamp bridge, gravity loading bin and hopper bin, static sign,
integrated pipe ditch, stopper and speed control device, other structures of
station yard, comprehensive quality evaluation of station yard engineering.
The main content of this revision is as follows.
1. The scope of application covers the construction acceptance of newly built
or reconstructed standard gauge station yard engineering of high-speed
railway, passenger dedicated line and passenger and freight shared line
railway.
2. In clause 5 “Road of railway station and yard”, ADD the “clearance limit
portal and frame” and the “protection plinth”,......
   
 
Privacy   ···   Product Quality   ···   About Us   ···   Refund Policy   ···   Fair Trading   ···   Quick Response
Field Test Asia Limited | Taxed in Singapore: 201302277C | Copyright 2012-2019