Powered by Google-Search & Google-Books Chinese Standards Shop Database: 169760 (Oct 17, 2020)
HOME   Quotation   Tax   Examples Standard-List   Contact-Us   View-Cart
  

TB 10108-2002

Chinese Standard: 'TB 10108-2002'
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusRelated Standard
TB 10108-2002English1789 Add to Cart Days<=11 Code for shotcrete-bolt construction method of railway tunnel Obsolete TB 10108-2002

   

BASIC DATA
Standard ID TB 10108-2002 (TB10108-2002)
Description (Translated English) Code for shotcrete-bolt construction method of railway tunnel
Sector / Industry Railway & Train Industry Standard
Classification of Chinese Standard S13
Classification of International Standard 93.100
Word Count Estimation 51,516
Date of Issue 2002-03-16
Date of Implementation 2002-07-01
Older Standard (superseded by this standard) TBJ 108-1992
Drafting Organization Professional Institute of Railway
Regulation (derived from) Railway Construction (2002) 24; Railway Construction [2009] No. 23; Railway Construction [2011] No. 163
Summary This standard applies to passenger train maximum driving speed of 140km/h in new construction, renovation standard gauge railway tunnel engineering design, construction and acceptance.

Related standard:   TB 10108-2011  TB 10223-2004
Related PDF sample:   TB/T 2092-2003
   
 
Privacy   ···   Product Quality   ···   About Us   ···   Refund Policy   ···   Fair Trading   ···   Quick Response
Field Test Asia Limited | Taxed in Singapore: 201302277C | Copyright 2012-2020