HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

SY/T 0511.4-2010 English PDF

US$259.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
SY/T 0511.4-2010: Oil tank appurtenances. Part 4: Foam-filled primary seal
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
SY/T 0511.4-2010English259 Add to Cart 3 days [Need to translate] Oil tank appurtenances. Part 4: Foam-filled primary seal Valid SY/T 0511.4-2010

PDF similar to SY/T 0511.4-2010


Standard similar to SY/T 0511.4-2010

GB/T 9109.5   SY/T 5164   SY/T 5324   SY/T 0511.2   SY/T 0511.3   SY/T 0511.1   

Basic data

Standard ID SY/T 0511.4-2010 (SY/T0511.4-2010)
Description (Translated English) Oil tank appurtenances. Part 4: Foam-filled primary seal
Sector / Industry Oil & Gas Industry Standard (Recommended)
Classification of Chinese Standard E90
Classification of International Standard 75.180.99
Word Count Estimation 10,175
Date of Issue 2011-01-09
Date of Implementation 2011-05-01
Quoted Standard GB/T 247; GB/T 2101; GB/T 10802-2006; GB/T 2809-2009
Regulation (derived from) National Energy Board Notice No. 1 of 2011
Issuing agency(ies) National Development and Reform Commission
Summary This standard specifies the petroleum storage tanks with a foam sealing device structures, materials, installation and other basic requirements. This standard applies to steel floating roof oil storage tanks, this section does not apply to aluminum and stainless steel internal floating roof oil storage tanks.