US$289.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. SN/T 3992-2014: Construction protocol of designated quarantine premises for imported non-human experimental primates Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
SN/T 3992-2014 | English | 289 |
Add to Cart
|
3 days [Need to translate]
|
Construction protocol of designated quarantine premises for imported non-human experimental primates
| Valid |
SN/T 3992-2014
|
PDF similar to SN/T 3992-2014
Basic data Standard ID | SN/T 3992-2014 (SN/T3992-2014) | Description (Translated English) | Construction protocol of designated quarantine premises for imported non-human experimental primates | Sector / Industry | Commodity Inspection Standard (Recommended) | Classification of Chinese Standard | B41 | Classification of International Standard | 11.220 | Word Count Estimation | 11,164 | Date of Issue | 12/1/2014 | Date of Implementation | 5/1/2015 | Quoted Standard | GB 5749; GB 8978; GB 16548 | Regulation (derived from) | State-Quality-Inspection-accreditation [2014] 614 | Issuing agency(ies) | General Administration of Customs | Summary | This standard specifies the entry of non-human primate animal quarantine specified field construction requirements. This standard applies to non-human primate animal entry quarantine specified construction field. |
SN/T 3992-2014: Construction protocol of designated quarantine premises for imported non-human experimental primates ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Entry nonhuman primate animal quarantine field specifies the construction specifications)
People's Republic of China Entry-Exit Inspection and Quarantine Standards
Entry nonhuman primate laboratory animals
Designated isolation camp construction specifications
Issued on. 2014-11-19
2015-05-01 implementation
People's Republic of China
The State Administration of Quality Supervision, Inspection and Quarantine released
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard is proposed and managed by the National Certification and Accreditation Administration Committee.
This standard was drafted. People's Republic of China Exit Inspection and Quarantine Conghua, Guangdong Entry-Exit Inspection and Quarantine of People's Republic of China
Bureau of Guangdong Province, monitoring of laboratory animals.
The main drafters of this standard. Cable Qiu Ping, Lin Zhixiong, Yan Jin, Wang Pengjun, Zhao Qiong Luo Chang-bao, Ling Huashu, Wangtian Jie, Yan Zhiqiang, MA Bao-hua,
Yuan Wen, Pei Tiezhu.
Entry nonhuman primate laboratory animals
Designated isolation camp construction specifications
1 Scope
This standard specifies the entry of non-human primate animal quarantine specified field construction requirements.
This standard applies to non-human primate animal entry quarantine specified construction field.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 5749 drinking water health standards
GB 8978 Integrated Wastewater Discharge Standard
GB 16548 Bing Hairou dead poultry and their products safe disposal procedures
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Non-human primate animal non-humanexperimentalprimates
Captive breeding for the experiment marmosets (Callithrisspp) and Chuan monkey (Saguinusspp.), Squirrel monkey (Saimirispp.), Green
Monkey (Chorocebusaethiops), cynomolgus monkey (Macacafascicularis), macaques (Macacamulatta), baboon (papio) and other animals.
3.2
Designated isolation camp designatedquarantinepremises
Directly under the Inspection and Quarantine Bureau designated by the special quarantine premises for the entry of animals, referred to designated isolation camp.
4 Location
4.1 designated isolation camp should stay away from wildlife sanctuaries.
4.2 Specifying field isolation should avoid natural foci.
4.3 designated isolation camp should avoid water source protection areas, no scope within around 3km terrestrial animal farm, leather processing plants, slaughter plants, animals
Hospitals, residential areas, main roads, animal market, etc; should stay away from serious pollution, noise or vibration area air.
4.4 specifies the environmental conditions surrounding the isolated field in line with animal health requirements.
5 facility requirements
5.1 layout and facilities
5.1.1 Subdivision
Specifies isolation venue should be divided into living and office area, isolation area. Living and office area including offices, garbage disposal area; the area of separation packages
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of SN/T 3992-2014_English be delivered?Answer: Upon your order, we will start to translate SN/T 3992-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of SN/T 3992-2014_English with my colleagues?Answer: Yes. The purchased PDF of SN/T 3992-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|