|
US$319.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. SN/T 1588.2-2013: Rules for the inspection of luminaires for import and export. Part 2: General requirements Status: Valid SN/T 1588.2: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| SN/T 1588.2-2013 | English | 319 |
Add to Cart
|
3 days [Need to translate]
|
Rules for the inspection of luminaires for import and export. Part 2: General requirements
| Valid |
SN/T 1588.2-2013
|
| SN/T 1588.2-2006 | English | 319 |
Add to Cart
|
3 days [Need to translate]
|
Import and export lighting testing procedures - Part 2: General requirements
| Obsolete |
SN/T 1588.2-2006
|
PDF similar to SN/T 1588.2-2013
Basic data | Standard ID | SN/T 1588.2-2013 (SN/T1588.2-2013) | | Description (Translated English) | Rules for the inspection of luminaires for import and export. Part 2: General requirements | | Sector / Industry | Commodity Inspection Standard (Recommended) | | Classification of Chinese Standard | K72 | | Classification of International Standard | 29.140 | | Word Count Estimation | 12,192 | | Older Standard (superseded by this standard) | SN/T 1588.2-2006 | | Quoted Standard | GB/T 2828.1; GB 5013; GB 5023; GB 7000.1-2007; GB 17625.1; GB 17743; GB/T 20145; SN/T 0002 | | Regulation (derived from) | National quality recognition (2013) 569 | | Issuing agency(ies) | General Administration of Customs | | Summary | This standard specifies the requirements for the import and export of lamps, sampling, testing and test results judgment. This standard applies to the use of electric light, import and export inspection and supply voltage not exceeding 1000V fixture. |
SN/T 1588.2-2013: Rules for the inspection of luminaires for import and export. Part 2: General requirements ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Rules for the inspection of luminaires for import and export.Part 2. General requirements
People's Republic of China Entry-Exit Inspection and Quarantine Standards
Instead of the SN/T 1588.2-2006
Inspection of import and export lamps
Part 2. General requirements
Part 2. Generalrequirements
Issued on. 2013-11-06
2014-06-01 implementation
People's Republic of China
The State Administration of Quality Supervision, Inspection and Quarantine released
Foreword
SN/T 1588 "Importers lighting for the inspection" is divided into 12 parts.
--- Part 1. heat lamps heat test test light source;
--- Part 2. General requirements;
--- Part 3. Particular requirements for swimming pools and similar lamps used;
--- Part 4. festive lighting;
--- Part 5. double capped fluorescent lamps;
--- Part 6. domestic and similar general lighting incandescent;
--- Part 7. Cartridges bayonet;
--- Part 8. ballasts for fluorescent lamps;
--- Part 9. fluorescent starter;
--- Part 10. metal halide lamp energy efficiency;
--- Part 11. Portable general purpose luminaires;
--- Part 12. screw holder.
This section SN/T 1588 Part 2.
This section drafted in accordance with GB/T 1.1-2009 given rules.
Please note that some of the content of this document may involve patents. Release mechanism of the present document does not assume responsibility for the identification of these patents.
The partial replacement of SN/T 1588.2-2006 "the inspection of import and export lamps - Part 2. General requirements."
This section compared with the SN/T 1588.2-2006, the main technical changes are as follows.
--- Deleting "general lighting" is defined (3.5).
--- Increase in optical radiation safety requirements (4.3).
--- Type approval test requirements and test content increases the electromagnetic compatibility testing, safety testing and other optical radiation detection (5.3.2).
--- Increase Table 1 "for sampling sample size" (Table 1).
--- SN/T 1588.2-2006 Table 1 to Table 2, the revised Table 2 GB 7000.1-2007 requirements of the test, the table
Increase compliance verification project, content and methods, test items "outside the wire" to increase the wire holder of test content, delete
To test the project "leakage" (Table 2).
This section proposed and managed by the National Certification and Accreditation Administration Committee.
This section was drafted by. People's Republic of China Guangdong CIQ.
The main drafters of this section. Li Min, Yu Xuan, Huang Chengbai, Zhou Na, Wang Cheng, Sha Lei.
This part of the standard replaces the previous editions are.
--- SN/T 1588.2-2006.
Introduction
"Inspection of import and export lamps - Part 2. General requirements" is import and export inspection work in accordance with the lamp, lamp inspection of import and export from
To guide and regulate the role.
With China's accession to the World Trade Organization (WTO) and the revised "People's Republic of China Import and Export Commodity Inspection Law" Import and Export Commodity Inspection
Test mode has undergone great changes, and changes in order to adapt to the situation, the state department in charge of inspection and quarantine inspection and quarantine standards organization established
system.
This part belongs to the standard system of inspection and quarantine fourth floor --- personality standard that specifies the requirements for the import and export of special lighting inspection.
Inspection of import and export lamps
Part 2. General requirements
1 Scope
SN/T 1588 provisions of this part of the import and export of lighting requirements, sampling, testing and test results determined.
This section applies to the use of electric light, Import and Export Inspection supply voltage not exceeding 1000V luminaire.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 2828.1 Sampling procedures for inspection - Part 1. by acceptance quality limit (AQL) retrieval batch inspection sampling plan
GB 5013 rated voltage 450/750V and below rubber insulated cables
GB 5023 rated voltage 450/750V and below PVC insulated cables
GB 7000.1-2007 Luminaires - Part 1. General requirements and tests
GB 17625.1 Electromagnetic Compatibility Limits for harmonic current emissions (equipment input current ≤16A)
Limits and methods of measurement of radio disturbance characteristics of GB 17743 electrical lighting and similar equipment
Light biosafety GB/T 20145 lamps and lamp systems
The basic provisions of SN/T 0002 Electromechanical Import and Export Commodity Inspection procedures prepared
3 Terms and Definitions
GB 7000.1-2007, SN/T 0002 defined by the following terms and definitions apply to this document.
3.1
Inspection Lot inspectionlot
To carry out the inspection and collection of the same specifications, models, produced under the same conditions of production per unit of product, referred to as batch.
3.2
Sampling mode modeofsamplinginspection
According to the mandatory requirements of national technical specifications, batch import and export commodities or pumping grant implementation sampling, testing and inspection of conformity assessment activities.
3.3
Type Test mode modeoftypetest
According to a predetermined cycle based on the mandatory requirements of national technical specifications type testing, according to on-site inspection requirements for product pumping batch inspection
Inspection, supervision and implementation of the conformity assessment activities of the enterprise quality management system.
3.4
Compliance Verification mode modeofcomplianceverification
According to the mandatory requirements of national technical specifications, inspection certificate and inspection documents, goods are consistent with the random testing can be carried out when necessary, and real
Shi conformity assessment activities supervision.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of SN/T 1588.2-2013_English be delivered?Answer: Upon your order, we will start to translate SN/T 1588.2-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of SN/T 1588.2-2013_English with my colleagues?Answer: Yes. The purchased PDF of SN/T 1588.2-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version SN/T 1588.2-2013?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version SN/T 1588.2-2013 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|