HOME
Cart(0)
Quotation
About-Us
Policy
PDFs
Standard-List
www.ChineseStandard.net
Database: 189759 (19 Oct 2025)
SL/T 800-2020 English PDF
Standard ID
Contents [version]
USD
STEP2
[PDF] delivered in
Standard Title (Description)
Status
PDF
SL/T 800-2020
English
RFQ
ASK
12 days [Need to translate]
Technical guidelines for river. lake ecosystem conservation and restoration engineering
Valid
SL/T 800-2020
PDF similar to SL/T 800-2020
Standard similar to SL/T 800-2020
GB 50788
SL 314
SL 282
SL/T 821
SL/T 769
SL/T 796
Basic data
Standard ID
SL/T 800-2020 (SL/T800-2020)
Description (Translated English)
Technical guidelines for river. lake ecosystem conservation and restoration engineering
Sector / Industry
Water Resources Industry Standard (Recommended)
Classification of Chinese Standard
P56
Classification of International Standard
13.020
Word Count Estimation
128,151
Date of Issue
2020-09-25
Date of Implementation
2020-12-25
Quoted Standard
GB 3838; GB 15618; GB/T 18921; GB/T 25173; GB/T 37071; GB 50286; GB/T 50290; GB 50400; GB 50513; GB 50707; GB 50773; SL 58; SL 196; SL 219; SL 223; SL 257; SL 303; SL 379; SL 383; SL 395; SL 471; SL 489; SL 492; SL 605; SL 609; SL 613; SL 623; SL 662
Regulation (derived from)
Ministry of Water Resources Announcement No. 15 of 2020
Issuing agency(ies)
Ministry of Water Resources of the People's Republic of China
Summary
This standard is applicable to the design of ecological system protection and restoration projects in large and medium-sized rivers, important lakes (reservoirs) and other water areas. The design of ecological system protection and restoration projects in small rivers and other lakes (reservoirs) water areas can be implemented by reference. This standard is also applicable to the ecological system protection and restoration design of new water conservancy and hydropower projects, as well as the ecological transformation, ecological dispatching and management of existing water conservancy and hydropower projects. The construction of river and lake ecosystem protection and restoration projects should meet the following requirements: 1 Before carrying out the river and lake ecosystem protection and restoration projects, the plan for the protection and restoration of the river and lake ecosystems should be prepared on the basis of the national and relevant department plans or higher-level plans. 2