HOME
Cart(0)
Quotation
About-Us
Policy
PDFs
Standard-List
www.ChineseStandard.net
Database: 189759 (12 Oct 2025)
QB/T 6003-2015 English PDF
QB/T 6003: Evolution and historical versions
Standard ID
Contents [version]
USD
STEP2
[PDF] delivered in
Standard Title (Description)
Status
PDF
QB/T 6003-2015
English
RFQ
ASK
3 days [Need to translate]
The equipment installation engineering construction of vacuum salt industry and the acceptance norms
Valid
QB/T 6003-2015
QB 6003-1991
English
RFQ
ASK
3 days [Need to translate]
Vacuum Salt Industry - Code for Construction and Acceptance of Equipment Installation Engineering
Obsolete
QB 6003-1991
PDF similar to QB/T 6003-2015
Standard similar to QB/T 6003-2015
GB/T 25232
GB 22747
QB/T 5628
Basic data
Standard ID
QB/T 6003-2015 (QB/T6003-2015)
Description (Translated English)
The equipment installation engineering construction of vacuum salt industry and the acceptance norms
Sector / Industry
Light Industry Standard (Recommended)
Classification of Chinese Standard
X96
Word Count Estimation
202,298
Date of Issue
2015-07-14
Date of Implementation
2016-01-01
Older Standard (superseded by this standard)
QB 6003-1991
Regulation (derived from)
PRC MIIT Announcement (2015 No.49)
Issuing agency(ies)
Ministry of Industry and Information Technology
Summary
This standard applies to the construction, construction and acceptance of the whole installation equipment and on-site welding equipment installation, including brine purification, evaporation crystallization, dehydration, drying, packaging, storage and transportation process for the new installation, expansion, alteration, relocation and equipment overhaul. And by-product Glauber's salt and gypsum and other production equipment and supporting the circulating water equipment. Other similar installation and acceptance of equipment for the installation of inorganic salts (such as Glauber's salt) produced by vacuum evaporation salt process and installation can also be carried out with reference to this standard. The construction and acceptance of hot pressing salt works shall be carried out with reference to this standard. This standard does not include heating, power generation, machine repair, water supply (excluding salt circulating water), automatic control, electrical and other professional and foreign equipment installation, construction and acceptance, according to the relevant professional or industry standards and foreign Randomized technical conditions