US$409.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. NB/T 11136-2023: Mine flameproof permanent magnet generator for vehicle Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
NB/T 11136-2023 | English | 409 |
Add to Cart
|
4 days [Need to translate]
|
Mine flameproof permanent magnet generator for vehicle
| Valid |
NB/T 11136-2023
|
PDF similar to NB/T 11136-2023
Basic data Standard ID | NB/T 11136-2023 (NB/T11136-2023) | Description (Translated English) | Mine flameproof permanent magnet generator for vehicle | Sector / Industry | Energy Industry Standard (Recommended) | Classification of Chinese Standard | D98 | Classification of International Standard | 29.260.20 | Word Count Estimation | 18,152 | Date of Issue | 2023-02-06 | Date of Implementation | 2023-08-06 | Issuing agency(ies) | National Energy Administration |
NB/T 11136-2023: Mine flameproof permanent magnet generator for vehicle---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 29:260:20
CCSD98
People's Republic of China Energy Industry Standards
Mining explosion-proof vehicle permanent magnet generator
Released on 2023-02-06
2023-08-06 Implementation
Released by the National Energy Administration
table of contents
Preface I
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Classification, model, type and basic parameters 2
5 Technical requirements 3
6 Test method 9
7 Inspection rules 12
8 Labeling, packaging, transportation and storage 13
foreword
This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents"
drafting:
Please note that some contents of this document may refer to patents: The issuing agency of this document assumes no responsibility for identifying patents:
This document was proposed by the Science and Technology Development Department of China Coal Industry Association:
This document is under the jurisdiction of the Coal Mine Safety Standardization Technical Committee of the Coal Industry:
This document is drafted by: China Coal Science and Industry Group Chongqing Research Institute Co:, Ltd:, China Coal Science and Industry Group Shenyang Research Institute Co:, Ltd:, Chongqing An
Biao Testing Research Institute Co:, Ltd:, Hengyang Yunxiang Motor Co:, Ltd:, Changzhou Scientific Research and Trial Manufacturing Center Co:, Ltd:, Anbiao National Mining Product Safety
Logo Center Co:, Ltd:, Hengyang Harmony Electromechanical Co:, Ltd:, Shenyang University of Technology:
The main drafters of this document: Li Yan, Kong Lingang, Zhang Hongkui, Yang Fan, Qian Jun, Liu Hui, Wang Zhijie, Zhang Yong, Chen Qing, Huang Xuanzhe, Li Zhe,
Xu Zhiquan, Meng Jijian, Zou Yinhui, Sun Jian, Wei Hongyu, Chen Zhao, Tan Lei, Fan Zhiyuan, Dan Kai, Yang Wenzhong, Wang Shuai, Yan Wenxue, Zhang Haipeng, Xu Lei,
Kang Liying, Zhou Qihua, Mo Jinxiu, Zhang Fengge:
Mining explosion-proof vehicle permanent magnet generator
1 Scope
This document specifies the classification, model, type and basic parameters, technical
Technical requirements, test methods, inspection rules and marking, packaging, transportation and storage:
This document is applicable to permanent magnet generators for mining explosion-proof vehicles: Non-permanent magnet generators for vehicles can be implemented by reference:
2 Normative references
The contents of the following documents constitute the essential provisions of this document through normative references in the text: Among them, dated references
For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
this document:
GB/T 191 Packaging, storage and transportation icon marks
GB/T 2423:1-2008 Environmental testing for electrical and electronic products - Part 2: Test methods Test A: Low temperature
GB/T 2423:2-2008 Environmental testing for electrical and electronic products - Part 2: Test methods Test B: High temperature
GB/T 2423:4-2008 Environmental testing for electrical and electronic products - Part 2: Test method Test Db: Alternating damp heat (12h
12h cycle)
GB/T 2423:5-2019 Environmental Testing Part 2: Test Methods Test Ea and Guidelines: Shock
GB/T 2423:10-2019 Environmental testing Part 2: Test method Test Fc: Vibration (sinusoidal)
GB/T 2423:22-2012 Environmental testing - Part 2: Test methods Test N: Temperature change
GB/T 3836:1-2021 Explosive atmospheres Part 1: General requirements for equipment
GB/T 3836:2-2021 Explosive atmospheres Part 2: Equipment protected by flameproof enclosure "d"
GB/T 3836:3-2021 Explosive atmospheres Part 3: Equipment protected by increased safety type "e"
GB/T 4942-2021 Degree of protection (IP code) for the overall structure of rotating electrical machines Classification
GB/T 13306 Signage
JB/T 6697-2006 Basic Technical Specifications for Electrical Equipment of Motor Vehicles and Internal Combustion Engines
JB/T 6710-2006 Specifications for motor vehicles and alternators for internal combustion engines
JB/T 6711-2007 Rules for the compilation of permanent magnet generators for motor vehicles and internal combustion engines
3 Terms and Definitions
The following terms and definitions apply to this document:
3:1
integral generator integral generator
A generator in which the voltage regulator and the generator are installed in the same flameproof enclosure:
3:2
Non-integral generator non-integralgenerator
The voltage regulator is separated from the generator and belongs to generators with different flameproof enclosures:
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of NB/T 11136-2023_English be delivered?Answer: Upon your order, we will start to translate NB/T 11136-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of NB/T 11136-2023_English with my colleagues?Answer: Yes. The purchased PDF of NB/T 11136-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|