HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

MT/T 1078-2008 PDF English

US$85.00 · In stock · Download in 9 seconds
MT/T 1078-2008: Direct current power supply with intrinsically safe output for a coal mine
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
MT/T 1078-2008English85 Add to Cart 0-9 seconds. Auto-delivery Direct current power supply with intrinsically safe output for a coal mine Valid

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: MT/T 1078-2008
      

Similar standards

GB/T 29723.5   HAD 002/02   MT/T 1199   

MT/T 1078-2008: Direct current power supply with intrinsically safe output for a coal mine

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/MTT1078-2008
MT COAL INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 73.100.99 D 98 File No.. 25344-2008 Direct current power supply with intrinsically safe output for a coal mine Issued on. NOVEMBER 19, 2008 Implemented on. JANUARY 01, 2009 Issued by. State Work Safety Administration

Table of Contents

Foreword... 3 1 Scope... 4 2 Normative references... 4 3 Product classification... 6 4 Technical requirements... 7 5 Test methods... 12 6 Inspection rules... 18 7 Marking, packaging, transportation and storage... 20

Foreword

This Standard was proposed by Science and Technology Development Department by China Coal Industry Association. This Standard shall be under jurisdiction of Technical Committee for Standardization of Equipment for Coal Mining in Coal Industry. Drafting organizations of this Standard. China University of Mining &Technology (Beijing), Changzhou Automation Research Institute of Coal Science Research Institute and HuaiBei Mining Co., Ltd. Main drafters of this Standard. Sun Jiping, Peng Xia, Li Wei, Tian Zijian. Direct current power supply with intrinsically safe output for a coal mine

1 Scope

This Standard specifies the product classification, technical requirements, test methods, inspection rules, mark, packaging, transportation and storage of direct current power supply with intrinsically safe output for a coal mine. This Standard applies to direct current power supply with intrinsically safe output for a coal mine (hereinafter referred to as DC power supply).

2 Normative references

The provisions in following documents become the provisions of this Standard through reference in this Standard. For dated references, the subsequent amendments (excluding corrigendum) or revisions do not apply to this Standard, however, parties who reach an agreement based on this Standard are encouraged to study if the latest versions of these documents are applicable. For undated references, the latest edition of the referenced document applies. GB/T 191 Packaging - Pictorial marking for handling of goods (GB/T 191-2000, eqv ISO 780.1997) GB/T 2423.1 Environmental testing for electric and electronic and electronic products - Part 2.Test methods - Tests A. Cold (GB/T 2423.1-2001, idt IEC 60068-2-1.1990) GB/T 2423.2 Environmental testing for electric and electronic products - Part 2. Test methods - Tests B. Dry heat (GB/T 2423.2-2001, idt IEC 60068-2-1.1990) GB/T 2423.3 Basic environmental testing procedures for electric and electronic products - Test Ca. Damp heat, steady state (GB/T 2423.2-1992, eqv IEC 68-2-3.1984) GB/T 2423.4 Basic environmental testing procedures for electric and electronic products - Test Db. Damp heat, cyclic (GB/T 2423.4-1993, eqv IEC 68-2-3.1980) GB/T 2423.5 Environmental testing for electric and electronic products - Part 2. Test methods - Test Ea and guidance. Shock (GB/T 2423.5-1995, idt IEC 68-2-27.1982) GB/T 2423.10 Environmental testing for electric and electronic products - Part 2. Test methods - Test Fc and guidance. Vibration (Sinusoidal) (GB/T 2423.10-1995, idt IEC 68-2-6.1982)

3 Product classification

3.1 Model Model of product shall be in accordance with the specifications of MT/T 286. 3.2 Classification 3.2.1 According to explosion proof type. 3.2.2 According to operating principle. 3.2.3 According to output function.

4 Technical requirements

4.1 General requirements DC power supply shall meet the requirements of this Standard, MT/T 1004, AQ 6201, etc., and shall be produced according to drawing and technical documents approved by specified procedure. 4.2 Environmental condition 4.3 Rated power supply condition 4.3.1 Source voltage. in accordance with Table 3. 4.3.2 Source frequency. 50 Hz, permissible deviation is ± 5%. 4.3.3 Harmonic wave. not more than 10%. 4.4 Main technical parameters 4.4.1 AC rated input voltage AC rated input voltage shall meet input of 127 V and 220 V, it can also be chosen from 36 V, 127 V, 380 V, 660 V, 1140 V, etc. 4.5 Main functions 4.5.1 It shall have input and output power supply indication function. 4.5.2 It shall have current-limiting, voltage limiting and short circuit protection function, thus automatic recovery can be made after fault is removed. 4.5.3 AC power supply with standby battery. 4.6 Structure 4.6.1 Fasteners shall have measures that avoid automatic loose. 4.8 Protective function of enclosure Protective function of enclosure shall be in accordance with GB 3836.1 ~ GB 3836.4, GB 3836.9, GB 12173 and other relevant standards. 4.9 Electric safety 4.9.1 Insulation resistance between circuit with power of DC power supply and grounding (or enclosure) shall be in accordance with Table 4.Measurement locations shall be specified in relevant standards. 4.14.4 AC power supply shall pass storage in low temperature working test; the main technical parameters, functions and appearance shall not be below requirements of this Standard. 4.15 Explosion-proof performance AC power supply of explosion proof type shall be in accordance with the relevant specifications of GB 3836.1 ~ GB 3836.4 and GB 3836.9, which shall have dual or multiple current-limiting, voltage limiting and circuit protection function. 4.16 Performance of mining general type Performance of mining general type shall be in accordance with the specifications of GB 12173. 4.17 Intrinsically safe parameters 4.17.1 The highest output voltage shall meet requirements of intrinsically safe explosion proof and shall be specified in relevant standards. 4.17.2 Maximum output current shall meet requirements of intrinsically safe explosion proof and shall be specified in relevant standards.

5 Test methods

5.1 Environmental conditions Unless otherwise specified in environmental test and relevant standards, test shall be conducted in the following environmental conditions. 5.2 Main technical parameters and main function test 5.2.1 Measuring apparatus and equipment 5.2.1.1 General requirements for measuring apparatus and equipment 5.2.1.2.3 Artificial load. Adjust the artificial load to obtain load current, maximum output current and circuit current that are needed by AC power supply output test. 5.2.1.2.4 Voltage regulator. it shall be in accordance with requirements of relevant standards. 5.2.1.2.5 Oscilloscope, storage oscilloscope and video milli-voltmeter. it shall meet requirements of relevant standards. 5.2.2 Test circuit Connect test equipment according to figure 1, S1 and S2 in figure are single-phase switches. Figure 1 Test circuit 5.2.3 Test steps 5.2.3.5 Current limiting and short circuit protection function SET source voltage as specified maximum value, ADJUST artificial load to make load current gradually increase to output short circuit. OBSERVE ampere meter (A), the maximum current is maximum output current of AC power supply, final indicating value is short circuit current of AC power supply. REMOVE over-current and short-circuit faults, INSPECT whether AC power supply can recover by itself or not. CARRY out test for 5 times continuously. For multi-circuit output AC power supply, output of other circuits shall be rated load. 5.4 Appearance inspection ADOPT visual inspection. 5.5 Enclosure protective performance inspection Enclosure protective performance inspection shall be conducted in accordance with the relevant specifications of GB 4208. 5.6 Measurement of insulation resistance Measurement of insulation resistance shall be conducted in accordance with the relevant specifications of MT 210. 5.10 Anti-interference test Anti-interference test shall be conducted in accordance with the specifications of GB/T 17626.3-2006, GB/T 17626.4-1998 and GB/T 17626.5-1999. 5.11 Reliability test Reliability test shall be conducted in accordance with the relevant specifications of GB/T 5080.7, ADOPT fixed time test plan. Failure judgment shall be conducted in accordance with the relevant specifications of 9.2 in GB/T 5080.1. 5.12 High temperature working test High temperature test shall be conducted in accordance with relevant specifications of GB/T 2423.2.AC power supply to be tested shall be at connection state for 2 continuous hours with a severity level of highest working environmental temperature. 5.16 Damp heat test 5.16.1 Damp heat test below mine shall be carried out according to relevant specifications of GB/T 2423.4, severity level is +40°C, and period is 12 d. Measurement and voltage withstand test of insulation resistance shall be carried out in 2 h before completion of test (at stage of low temperature with high humidity). After test, main technical parameters and main functions shall be inspected. 5.17 Vibration test Vibration test shall be carried out in accordance with GB/T 2423.10, severity level shall be in accordance with the specifications of Table 6.

6 Inspection rules

6.1 Inspection rules Inspection consists of factory-exit inspection and type inspection. 6.2 Factory-exit inspection 6.2.1 AC power supply shall be carried out for factory-exit inspection. Qualified products shall be given certificate. 6.3 Type inspection 6.3.1 Type inspection shall be carried out when one of the following circumstances occurs. 6.3.2 Inspection items shall be in accordance with the specifications of Table 8. 6.3.5 When batch number is more than 50, sampling inspection shall be carried out according to GB/T 2829-2002.Choose one-time sampling scheme; judgment level is III; rejectable quality level (RQL) is not more than 40.Specified RQL of A item is usually below that of B item; specified RQL of C item is usually more than that of B item. For type A item, if one-item is unqualified, then the whole batch is judged as unqualified products, for B- and C-item, unqualified quantities determined shall be in accordance with relevant standards.

7 Marking, packaging, transportation and storage

7.1 Marking 7.1.1 Product marks 7.1.1.1 Explosion-proof-type AC power supply shall have MA safety mark. 7.1.2 Packaging marks 7.1.2.1 Mark of packaging, storage and transportation shall be in accordance with the specifications of GB/T 191. 7.1.2.2 Characters and marks written in external packing box shall at least include. 7.2 Packaging 7.2.1 Packaging pattern of AC power supply shall be in accordance with the relevant specifications of nation and industries, and shall be specified clearly in relevant standards. 7.2.2 Accompanying documents shall include. 7.3 Transportation Avoiding rain and snow, AC power supply after packaging is suitable for various transportation modes such as water transportation, land transportation and air transportation. MT/T 1078-2008 MT COAL INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 73.100.99 D 98 File No.. 25344-2008 Direct current power supply with intrinsically safe output for a coal mine Issued on. NOVEMBER 19, 2008 Implemented on. JANUARY 01, 2009 Issued by. State Work Safety Administration

Table of Contents

Foreword... 3 1 Scope... 4 2 Normative references... 4 3 Product classification... 6 4 Technical requirements... 7 5 Test methods... 12 6 Inspection rules... 18 7 Marking, packaging, transportation and storage... 20

Foreword

This Standard was proposed by Science and Technology Development Department by China Coal Industry Association. This Standard shall be under jurisdiction of Technical Committee for Standardization of Equipment for Coal Mining in Coal Industry. Drafting organizations of this Standard. China University of Mining &Technology (Beijing), Changzhou Automation Research Institute of Coal Science Research Institute and HuaiBei Mining Co., Ltd. Main drafters of this Standard. Sun Jiping, Peng Xia, Li Wei, Tian Zijian. Direct current power supply with intrinsically safe output for a coal mine

1 Scope

This Standard specifies the product classification, technical requirements, test methods, inspection rules, mark, packaging, transportation and storage of direct current power supply with intrinsically safe output for a coal mine. This Standard applies to direct current power supply with intrinsically safe output for a coal mine (hereinafter referred to as DC power supply).

2 Normative references

The provisions in following documents become the provisions of this Standard through reference in this Standard. For dated references, the subsequent amendments (excluding corrigendum) or revisions do not apply to this Standard, however, parties who reach an agreement based on this Standard are encouraged to study if the latest versions of these documents are applicable. For undated references, the latest edition of the referenced document applies. GB/T 191 Packaging - Pictorial marking for handling of goods (GB/T 191-2000, eqv ISO 780.1997) GB/T 2423.1 Environmental testing for electric and electronic and electronic products - Part 2.Test methods - Tests A. Cold (GB/T 2423.1-2001, idt IEC 60068-2-1.1990) GB/T 2423.2 Environmental testing for electric and electronic products - Part 2. Test methods - Tests B. Dry heat (GB/T 2423.2-2001, idt IEC 60068-2-1.1990) GB/T 2423.3 Basic environmental testing procedures for electric and electronic products - Test Ca. Damp heat, steady state (GB/T 2423.2-1992, eqv IEC 68-2-3.1984) GB/T 2423.4 Basic environmental testing procedures for electric and electronic products - Test Db. Damp heat, cyclic (GB/T 2423.4-1993, eqv IEC 68-2-3.1980) GB/T 2423.5 Environmental testing for electric and electronic products - Part 2. Test methods - Test Ea and guidance. Shock (GB/T 2423.5-1995, idt IEC 68-2-27.1982) GB/T 2423.10 Environmental testing for electric and electronic products - Part 2. Test methods - Test Fc and guidance. Vibration (Sinusoidal) (GB/T 2423.10-1995, idt IEC 68-2-6.1982)

3 Product classification

3.1 Model Model of product shall be in accordance with the specifications of MT/T 286. 3.2 Classification 3.2.1 According to explosion proof type. 3.2.2 According to operating principle. 3.2.3 According to output function.

4 Technical requirements

4.1 General requirements DC power supply shall meet the requirements of this Standard, MT/T 1004, AQ 6201, etc., and shall be produced according to drawing and technical documents approved by specified procedure. 4.2 Environmental condition 4.3 Rated power supply condition 4.3.1 Source voltage. in accordance with Table 3. 4.3.2 Source frequency. 50 Hz, permissible deviation is ± 5%. 4.3.3 Harmonic wave. not more than 10%. 4.4 Main technical parameters 4.4.1 AC rated input voltage AC rated input voltage shall meet input of 127 V and 220 V, it can also be chosen from 36 V, 127 V, 380 V, 660 V, 1140 V, etc. 4.5 Main functions 4.5.1 It shall have input and output power supply indication function. 4.5.2 It shall have current-limiting, voltage limiting and short circuit protection function, thus automatic recovery can be made after fault is removed. 4.5.3 AC power supply with standby battery. 4.6 Structure 4.6.1 Fasteners shall have measures that avoid automatic loose. 4.8 Protective function of enclosure Protective function of enclosure shall be in accordance with GB 3836.1 ~ GB 3836.4, GB 3836.9, GB 12173 and other relevant standards. 4.9 Electric safety 4.9.1 Insulation resistance between circuit with power of DC power supply and grounding (or enclosure) shall be in accordance with Table 4.Measurement locations shall be specified in relevant standards. 4.14.4 AC power supply shall pass storage in low temperature working test; the main technical parameters, functions and appearance shall not be below requirements of this Standard. 4.15 Explosion-proof performance AC power supply of explosion proof type shall be in accordance with the relevant specifications of GB 3836.1 ~ GB 3836.4 and GB 3836.9, which shall have dual or multiple current-limiting, voltage limiting and circuit protection function. 4.16 Performance of mining general type Performance of mining general type shall be in accordance with the specifications of GB 12173. 4.17 Intrinsically safe parameters 4.17.1 The highest output voltage shall meet requirements of intrinsically safe explosion proof and shall be specified in relevant standards. 4.17.2 Maximum output current shall meet requirements of intrinsically safe explosion proof and shall be specified in relevant standards.

5 Test methods

5.1 Environmental conditions Unless otherwise specified in environmental test and relevant standards, test shall be conducted in the following environmental conditions. 5.2 Main technical parameters and main function test 5.2.1 Measuring apparatus and equipment 5.2.1.1 General requirements for measuring apparatus and equipment 5.2.1.2.3 Artificial load. Adjust the artificial load to obtain load current, maximum output current and circuit current that are needed by AC power supply output test. 5.2.1.2.4 Voltage regulator. it shall be in accordance with requirements of relevant standards. 5.2.1.2.5 Oscilloscope, storage oscilloscope and video milli-voltmeter. it shall meet requirements of relevant standards. 5.2.2 Test circuit Connect test equipment according to figure 1, S1 and S2 in figure are single-phase switches. Figure 1 Test circuit 5.2.3 Test steps 5.2.3.5 Current limiting and short circuit protection function SET source voltage as specified maximum value, ADJUST artificial load to make load current gradually increase to output short circuit. OBSERVE ampere meter (A), the maximum current is maximum output current of AC power supply, final indicating value is short circuit current of AC power supply. REMOVE over-current and short-circuit faults, INSPECT whether AC power supply can recover by itself or not. CARRY out test for 5 times continuously. For multi-circuit output AC power supply, output of other circuits shall be rated load. 5.4 Appearance inspection ADOPT visual inspection. 5.5 Enclosure protective performance inspection Enclosure protective performance inspection shall be conducted in accordance with the relevant specifications of GB 4208. 5.6 Measurement of insulation resistance Measurement of insulation resistance shall be conducted in accordance with the relevant specifications of MT 210. 5.10 Anti-interference test Anti-interference test shall be conducted in accordance with the specifications of GB/T 17626.3-2006, GB/T 17626.4-1998 and GB/T 17626.5-1999. 5.11 Reliability test Reliability test shall be conducted in accordance with the relevant specifications of GB/T 5080.7, ADOPT fixed time test plan. Failure judgment shall be conducted in accordance with the relevant specifications of 9.2 in GB/T 5080.1. 5.12 High temperature working test High temperature test shall be conducted in accordance with relevant specifications of GB/T 2423.2.AC power supply to be tested shall be at connection state for 2 continuous hours with a severity level of highest working environmental temperature. 5.16 Damp heat test 5.16.1 Damp heat test below mine shall be carried out according to relevant specifications of GB/T 2423.4, severity level is +40°C, and period is 12 d. Measurement and voltage withstand test of insulation resistance shall be carried out in 2 h before completion of test (at stage of low temperature with high humidity). After test, main technical parameters and main functions shall be inspected. 5.17 Vibration test Vibration test shall be carried out in accordance with GB/T 2423.10, severity level shall be in accordance with the specifications of Table 6.

6 Inspection rules

6.1 Inspection rules Inspection consists of factory-exit inspection and type inspection. 6.2 Factory-exit inspection 6.2.1 AC power supply shall be carried out for factory-exit inspection. Qualified products shall be given certificate. 6.3 Type inspection 6.3.1 Type inspection shall be carried out when one of the following circumstances occurs. 6.3.2 Inspection items shall be in accordance with the specifications of Table 8. 6.3.5 When batch number is more than 50, sampling inspection shall be carried out according to GB/T 2829-2002.Choose one-time sampling scheme; judgment level is III; rejectable quality level (RQL) is not more than 40.Specified RQL of A item is usually below that of B item; specified RQL of C item is usually more than that of B item. For type A item, if one-item is unqualified, then the whole batch is judged as unqualified products, for B- and C-item, unqualified quantities determined shall be in accordance with relevant standards.

7 Marking, packaging, transportation and storage

7.1 Marking 7.1.1 Product marks 7.1.1.1 Explosion-proof-type AC power supply shall have MA safety mark. 7.1.2 Packaging marks 7.1.2.1 Mark of packaging, storage and transportation shall be in accordance with the specifications of GB/T 191. 7.1.2.2 Characters and marks written in external packing box shall at least include. 7.2 Packaging 7.2.1 Packaging pattern of AC power supply shall be in accordance with the relevant specifications of nation and industries, and shall be specified clearly in relevant standards. 7.2.2 Accompanying documents shall include. 7.3 Transportation Avoiding rain and snow, AC power supply after packaging is suitable for various transportation modes such as water transportation, land transportation and air transportation. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of MT/T 1078-2008 be delivered?

Answer: The full copy PDF of English version of MT/T 1078-2008 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of MT/T 1078-2008_English with my colleagues?

Answer: Yes. The purchased PDF of MT/T 1078-2008_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- MT/T 1078-2008 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of MT/T 1078-2008?

A step-by-step guide to download PDF of MT/T 1078-2008_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "MT/T 1078-2008".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9