|
US$329.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. NB/T 10532-2021: Technical regulation on monitoring of land reclamation quality for opencast coal mines Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| NB/T 10532-2021 | English | 329 |
Add to Cart
|
3 days [Need to translate]
|
Technical regulation on monitoring of land reclamation quality for opencast coal mines
| Valid |
NB/T 10532-2021
|
PDF similar to NB/T 10532-2021
Basic data | Standard ID | NB/T 10532-2021 (NB/T10532-2021) | | Description (Translated English) | Technical regulation on monitoring of land reclamation quality for opencast coal mines | | Sector / Industry | Energy Industry Standard (Recommended) | | Classification of Chinese Standard | D04 | | Word Count Estimation | 14,132 | | Issuing agency(ies) | National Energy Administration |
NB/T 10532-2021: Technical regulation on monitoring of land reclamation quality for opencast coal mines ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical regulation on monitoring of land reclamation quality for opencast coal mines
ICS 73.040
CCSD04
Energy Industry Standards of the People's Republic of China
Technical Regulations for Quality Monitoring of Land Reclamation in Open-pit Coal Mines
Released on 2021-01-07
Implementation on 2021-04-01
Issued by the National Energy Administration
Table of contents
Foreword Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General requirements 2
5 Work process 2
6 Preparation stage 2
7 Monitoring unit 3
8 Monitoring indicators 3
9 Monitoring method 3
10 Monitoring report 6
Appendix A (Informative) Survey Form 7 of the Status Quo of Land Reclamation in Opencast Coal Mines
Appendix B (informative) Monitoring index system for land reclamation quality of open-pit coal mine 8
Appendix C (informative) Monitoring point setting method 9
Appendix D (Informative) Outline for Compiling Quality Monitoring Report of Open-pit Coal Mine Land Reclamation 10
Reference 11
Foreword
This document is in accordance with GB/T 1.1-2020 "Guidelines for Standardization Part 1.Structure and Drafting Rules of Standardization Documents".
To be drafted.
Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents.
This document was proposed by the China Coal Industry Association.
This document is under the jurisdiction of the Science and Technology Development Department of China Coal Industry Association.
This document was drafted by. State Key Laboratory of Water Resources Protection and Utilization in Coal Mining, China University of Mining and Technology (Beijing), China Coal Industry
Industry Association Productivity Promotion Center, National Energy Shendong Coal Group Co., Ltd., Shenhua Zhungeer Energy Co., Ltd., Beijing Low Carbon Clean
Clean Energy Research Institute.
The main drafters of this document. Li Quansheng, Zhang Kai1), Cao Zhiguo, Xu Heng, Zheng Houfa, Guo Junting, Zhang Kai2), Zhang Guojun, Yang Yingming, Li Jingfeng,
Zhang Bin.
This document is issued for the first time.
1) China University of Mining and Technology (Beijing).
2) State Key Laboratory of Water Resources Protection and Utilization in Coal Mining.
Technical Regulations for Quality Monitoring of Land Reclamation in Open-pit Coal Mines
1 Scope
This document specifies the general requirements, work flow, preparation phase, monitoring unit, monitoring indicators,
Monitoring methods and monitoring report drafting outlines.
This document is applicable to the monitoring of land reclamation quality in open-pit coal mines, and other types of land reclamation quality monitoring can refer to this document.
2 Normative references
The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations
Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
This document.
GB 50026-2007 Engineering Survey Code
HJ802 Determination of Soil Electrical Conductivity Electrode Method
NY/T 1121.1 Soil Testing Part 1.Collection, Processing and Storage of Soil Samples
NY/T 1121.2 Soil Testing Part 2.Determination of Soil pH
NY/T 1121.3 Soil Testing Part 3.Determination of Soil Mechanical Composition
NY/T 1121.4 Soil Testing Part 4.Determination of Soil Bulk Density
NY/T 1121.6 Soil Testing Part 6.Determination of Soil Organic Matter
TD/T 1036-2013 Land Reclamation Quality Control Standard
3 Terms and definitions
The following terms and definitions defined in TD/T 1036-2013 apply to this document.
3.1
Opencast coal mine reclamation area of opencastcoalmines
Objects of land reclamation for open-pit coal mines.
Note. Mainly include internal and external dumps, temporary land, etc.
3.2
Land reclamation quality
The land damaged by production and construction activities and natural disasters has undergone remediation measures.
The level of peace has reached the level of availability.
[Source. TD/T 1036-2013, 3.2]
3.3
Monitoringoflandreclamationquality
In the open-pit coal mine reclamation area where the soil reconstruction project has been completed, the monitoring activities of the land reclamation quality and its change trend are carried out.
3.4
Monitoringunit
The monitoring area is divided according to the type of open-pit coal mine reclamation area and the direction of reclamation land use.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of NB/T 10532-2021_English be delivered?Answer: Upon your order, we will start to translate NB/T 10532-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of NB/T 10532-2021_English with my colleagues?Answer: Yes. The purchased PDF of NB/T 10532-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|