| US$189.00 ยท In stockDelivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
 LY/T 1996-2011: Acceptance generality of bamboo chopsticks production line
 Status: Valid
 
	
		
			| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |  
			| LY/T 1996-2011 | English | 189 | Add to Cart | 3 days [Need to translate] | Acceptance generality of bamboo chopsticks production line | Valid | LY/T 1996-2011 |  
	 
       PDF similar to LY/T 1996-2011 
 Basic data             | Standard ID | LY/T 1996-2011 (LY/T1996-2011) |           | Description (Translated English) | Acceptance generality of bamboo chopsticks production line |           | Sector / Industry | Forestry Industry Standard (Recommended) |           | Classification of Chinese Standard | B97 |           | Classification of International Standard | 65.060.80 |           | Word Count Estimation | 7,746 |           | Date of Issue | 2011-06-10 |           | Date of Implementation | 2011-07-01 |           | Quoted Standard | GB/T 3766; GB/T 4272-2003; GB 5226.1; GB/T 6576; GB/T 7932; GB 8978; GB 12348; GB 15760; GB 16297; GB/T 18262; GB 19790.2; GB 50235; GB 50254; GB 50275; JB/T 9953 |           | Regulation (derived from) | State Forestry Administration in 2011 Notice No. 9 |           | Issuing agency(ies) | State Forestry Administration |           | Summary | This standard specifies the chopsticks production line installation, stand-alone air running test, empty running production line testing, production line load testing, inspection rules. This standard applies to the original bamboo as raw material to the finished product of bamboo chopsticks chopsticks production line, including split from the original bamboo chopsticks packed bar to all devices. | LY/T 1996-2011: Acceptance generality of bamboo chopsticks production line---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Acceptance generality of bamboo chopsticks production line
ICS 65.060.80
B97
People's Republic of China Forestry Industry Standard
Bamboo chopsticks production line acceptance rules
Published on.2011-06-10
2011-07-01 implementation
State Forestry Administration released
 ForewordThis standard is drafted in accordance with the rules given in GB/T 1.1-2009 "Standardization Work Guide Part 1. Standard Structure and Compilation".
Please note that some elements of this standard may involve patents. Release of this standard
The organization is not responsible for identifying these patents.
This standard is proposed and managed by the National Standardization Technical Committee for Wood-based Panel Machinery (SAC/TC66).
This standard is drafted by. Northeast Forestry University.
Participated in the drafting of this standard. Institute of Metrology and Measurement Engineering, China Metrology Institute.
The main drafters of this standard. Dai Dali, Qi Yingjie, Hu Wanming, Xu Yang, Tao Rong.
Bamboo chopsticks production line acceptance rules1 ScopeThis standard stipulates the installation of bamboo chopsticks production line, single machine dry running test, production line dry running test, production line load test, inspection gauge
Then wait.
This standard applies to bamboo chopsticks production lines that use raw bamboo as raw materials and bamboo chopsticks as finished products; including all from bamboo stalks to bamboo chopsticks.
equipment.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 3766 hydraulic system general technical conditions
GB/T 4272-2008 General rules for equipment and pipeline insulation technology
GB 5226.1 Mechanical electrical safety machinery and electrical equipment - Part 1. General technical conditions
GB/T 6576 machine tool lubrication system
GB/T 7932 pneumatic system general technical conditions
GB 8978 Integrated Wastewater Discharge Standard
GB 12348 Environmental noise emission standards for industrial enterprises
General technical conditions for safety protection of GB 15760 metal cutting machine tools
GB 16297 Integrated emission standards for atmospheric pollutants
General technical conditions for GB/T 18262 wood-based panel machinery
GB 19790.2 disposable chopsticks part 2. bamboo chopsticks
GB 50235 Industrial Metal Pipeline Engineering Construction Specification
GB 50254 Electrical installation engineering Low-voltage electrical installation and acceptance specifications
GB 50275 Fan, compressor, pump installation engineering construction and acceptance specifications
JB/T 9953 Woodworking Machine Noise Acoustic (Pressure) Level Measurement Method3 requirements3.1 General requirements
3.1.1 All equipment, auxiliary pipelines, water, electricity, steam, gas, hydraulic and ventilation dust removal systems of the production line shall comply with the relevant standards.
3.1.2 When the bamboo chopsticks production line is accepted, the technical information shall be complete, correct and uniform, and shall include.
a) production line specification, process flow chart, process layout drawing, piping layout drawing, equipment basic drawing and equipment list;
b) equipment general diagram, electrical schematic diagram, hydraulic schematic diagram, pneumatic schematic diagram and ventilation and dust removal system diagram;
c) Equipment supply list, packing list, equipment instruction manual, certificate of conformity and other technical documents supplied at random.
 
 Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of LY/T 1996-2011_English be delivered?Answer: Upon your order, we will start to translate LY/T 1996-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of LY/T 1996-2011_English with my colleagues?Answer: Yes. The purchased PDF of LY/T 1996-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries Question 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected] . In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.    |