|
US$329.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. JJG 858-2013: Verification Regulation of Standard Rhodium-iron Resistance Thermometers Status: Valid JJG 858: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| JJG 858-2013 | English | 329 |
Add to Cart
|
3 days [Need to translate]
|
Verification Regulation of Standard Rhodium-iron Resistance Thermometers
| Valid |
JJG 858-2013
|
| JJG 858-1994 | English | 239 |
Add to Cart
|
2 days [Need to translate]
|
Verification Regulation of the Standard Rhodium-Iron Resistance Thermometers
| Obsolete |
JJG 858-1994
|
PDF similar to JJG 858-2013
Basic data | Standard ID | JJG 858-2013 (JJG858-2013) | | Description (Translated English) | Verification Regulation of Standard Rhodium-iron Resistance Thermometers | | Sector / Industry | Metrology & Measurement Industry Standard | | Classification of Chinese Standard | A54 | | Classification of International Standard | 17.200 | | Word Count Estimation | 14,197 | | Older Standard (superseded by this standard) | JJG 858-1994 | | Adopted Standard | CCT ITS-90, NEQ | | Regulation (derived from) | AQSIQ Announcement No. 74 of 2013 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine | | Summary | This standard applies to: measurement range of 0. 65 K ~ 27. 1K standard rhodium iron resistance thermometer initial verification, testing and use of the follow-up examination. |
JJG 858-2013: Verification Regulation of Standard Rhodium-iron Resistance Thermometers---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Verification Regulation of Standard Rhodium-iron Resistance Thermometers
State verification procedures People's Republic of China
Standard Rh-Fe resistance thermometer
Issued on. 2013-05-13
2013-11-13 implementation
The State Administration of Quality Supervision, Inspection and Quarantine released
Standard Rh-Fe resistance thermometer test procedures
Replacing JJG 858-1994
Focal point. the National Technical Committee of temperature measurement
Drafted by. 100101
China Institute of Metrology
The temperature measurement procedures commissioned the National Technical Committee is responsible for interpretation
The main drafters of this procedure.
Lin Peng (Institute of Physical and Chemical Technology)
Qiu Ping (China Institute of Metrology)
Drafters participate.
Zhang Qinggeng (Institute of Physical and Chemical Technology)
Wu lian (China Institute of Metrology)
table of Contents
Introduction (Ⅱ)
1 Scope (1)
2 Overview (1)
3 metering performance requirements (2)
The resistance value of 3.1 (2)
3.2 self-heating (2)
The difference (2) between the test results of two 3.3
3.4 Insulation resistance (2)
4 General Requirements (2)
4.1 size requirements (2)
4.2 thermometer housing (2)
5 control of measuring instruments (2)
5.1 verification Conditions (2)
5.2 Verification Project (3)
5.3 Verification Methods (3)
5.4 Verification Results Processing (5)
5.5 test cycle (6)
Appendix A calibration certificate with test results of notice data page format (7)
Introduction
This procedure is "ITS-90 temperature scale approximation technique," the English version of the International Advisory Committee temperature (CCT) according to (Tech-
nologyforapproximatingtheInternationalTemperatureScaleof1990), with related research
Document on JJG 858-1994 subject to revisions.
Compared with JJG 858-1994, this procedure is mainly technical changes are as follows.
--- Stability requirements for submission of a thermometer, the original procedures are 2mK, now changed 3mK, and test results
Uncertainty 3mK consistent;
--- Increase structural diagram of a rhodium-iron resistance thermometer;
--- 4.2K was increased resistance ratio (0.08 ± 0.02) the request;
--- Increased test point temperature interval recommended list, the original test procedure only gives the number of points, not to mention a specific interval;
--- Original protocol requirements of the standard group is stable in 0.5mK, was replaced by the expanded uncertainty 1mK;
--- Increasing the initial verification of the project and corresponding methods;
--- Increasing the eligibility list of indicators was seized with a thermometer, test results easy to determine whether or not qualified;
--- Increasing the calibration certificate and test results of notice of the data page format;
--- Increasing the effective detection of the digital representation of the data requirements.
JJG 858-1994 was the first to develop, publish.
Standard Rh-Fe resistance thermometer test procedures
1 Scope
The order applies to the measurement range of the standard Rh-Fe resistance thermometer 0.65K ~ 27.1K initial verification, after
Continued use of verification and inspection.
2 Overview
Standard Rh-Fe resistance thermometer (hereinafter referred to as "thermometer"), is made of pure rhodium alloys drawn plus 0.5% mole of iron
Into filaments A resistance thermometer with no stress around the structure formed (see FIG. 1), in the 0.5K ~ 27K temperature region resistance
High sensitivity, good long-term stability, suitable for use as a temperature standard 0.5K ~ 27K temperature region.
Figure 1 Standard Rh-Fe resistance thermometer Schematic
1- platinum thermometer housing; 2 - worn in a glass tube spiral rhodium iron temperature sensing wire
3- welding wire to sense the temperature of a platinum wire; 4- soft glass seal
Since rhodium alloy is an alloy diluted, content and distribution of iron rhodium alloy of the resistance - temperature characteristics
Impact is clear, therefore thermometer must do more than point test. Test data using least squares method to do resistance - temperature characteristics
Fit calculation, and then given the resistance - temperature indexing table.
Thermometer test data can be used Chebyshev polynomials (1) to fit its resistance - temperature relationship.
T = a02 Σ
i = 1
aicos (iarccosx) = a02 Σ
i = 1
aicos [iarccos (AR B)] (1)
Where.
--- The T temperature, K;
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJG 858-2013_English be delivered?Answer: Upon your order, we will start to translate JJG 858-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JJG 858-2013_English with my colleagues?Answer: Yes. The purchased PDF of JJG 858-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version JJG 858-2013?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JJG 858-2013 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|