US$599.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. JJG 719-2021: Verification Regulation of Working Standards of DC Electromotive Force Status: Valid JJG 719: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
JJG 719-2021 | English | 599 |
Add to Cart
|
5 days [Need to translate]
|
Verification Regulation of Working Standards of DC Electromotive Force
| Valid |
JJG 719-2021
|
JJG 719-1991 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
Verification Regulation for Working Standard of directcurrent Electromotive force
| Obsolete |
JJG 719-1991
|
PDF similar to JJG 719-2021
Basic data Standard ID | JJG 719-2021 (JJG719-2021) | Description (Translated English) | Verification Regulation of Working Standards of DC Electromotive Force | Sector / Industry | Metrology & Measurement Industry Standard | Classification of Chinese Standard | A55 | Classification of International Standard | 17.220 | Word Count Estimation | 27,299 | Date of Issue | 2021-12-08 | Date of Implementation | 2022-06-08 | Issuing agency(ies) | State Administration for Market Regulation | Summary | This standard applies to the initial verification, subsequent verification and in-use inspection of DC electromotive force working reference measuring instruments. |
JJG 719-2021: Verification Regulation of Working Standards of DC Electromotive Force---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
National Metrology Verification Regulations of the People's Republic of China
DC EMF working reference
Released on 2021-12-08
2022-06-08 Implementation
Released by the State Administration for Market Regulation
DC electromotive force working benchmark verification regulations
Replace JJG 719-1991
Responsible unit: National Electromagnetic Metrology Technical Committee
Main drafting unit: China Academy of Testing Technology
China Institute of Metrology
Participating in the drafting unit: Gansu Provincial Institute of Metrology
This regulation entrusts the National Electromagnetic Metrology Technical Committee to be responsible for interpretation
The main drafters of this regulation:
Tang Guomin (China Academy of Testing Technology)
Sun Maoyi (China Academy of Testing Technology)
Zheng Lianying (National Institute of Metrology, China)
Participating drafters:
Dong Gang (Gansu Provincial Institute of Metrology)
Table of contents
Introduction (Ⅱ)
1 Scope(1)
2 References(1)
3 Terms and units of measurement(1)
3:1 DC electromotive force auxiliary reference device (1)
3:2 DC electromotive force reference device (1)
3:3 Difference method (1)
3:4 Difference substitution method (1)
3:5 Closed-loop symmetrical observation method (1)
4 Overview(2)
5 Metrological performance requirements (3)
5:1 Electromotive force range (3)
5:2 Stability indicators (3)
6 General technical requirements (3)
7 Measuring Instrument Control(3)
7:1 Test conditions (3)
7:2 Verification items (4)
7:3 Verification method (5)
7:4 Processing of verification results (10)
7:5 Verification cycle (10)
Appendix A Verification Original Record Format (11)
Appendix B Format of the inner pages of the verification certificate/test result notification (page 2) (17)
Appendix C Verification Certificate/Verification Result Notice Verification Result Page Sample (Page 3) (18)
Appendix D Temperature Measurement Method of Constant Temperature Oil Tank (20)
Introduction
JJF1002-2010 "Rules for Compilation of National Metrology Verification Regulations", JJF1001 "General Metrology Terms and Definitions",
JJF1059:1-2012 "Assessment and Expression of Measurement Uncertainty" together constitute the basis for the preparation of this regulation
series specification:
This regulation replaces JJG 719-1991 "Working Standards of DC Electromotive Force": Compared with JJG 719-1991, the main
The technical changes are as follows:
--- Increased the definition of related terms;
--- Cancel the internal resistance judgment;
--- Added the method of measuring the electromotive force difference with a digital voltmeter;
--- Increased temperature measurement method:
The previous releases of this regulation are as follows:
---JJG 719-1991:
DC electromotive force working benchmark verification regulations
1 Scope
This regulation applies to the initial verification, subsequent verification and in-use inspection of DC electromotive force working reference measuring instruments:
2 References
This procedure references the following documents:
GB 3929-1983 standard battery
For dated references, only the dated version applies to this regulation; for undated references
document, its latest version (including all amendments) applies to this regulation:
3 Terminology and units of measurement
The device used to save the dc voltage main reference or the dc voltage testimonial reference recurring voltage unit, which can carry out the corresponding
Quantity transfer works: The device consists of DC electromotive force sub-reference device, electromotive force difference measurement system, temperature measurement system and
Composition of constant temperature oil tank:
The device used to save the unit of the DC electromotive force secondary reference transmission voltage can carry out the corresponding value transmission work: Should
The device consists of a DC electromotive force reference device, an electromotive force difference measurement system, a temperature measuring instrument and a constant temperature oil tank:
3:3 difference method difference method
Obtain data related to the measurement result by measuring the difference between the measured value and the reference quantity, and perform operations on the data
The measurement method used to obtain the measurement result: The measurand in this regulation can be the electromotive force value of the standard standard battery,
It can also be the electromotive force value of the standard battery being tested; the reference quantity refers to the electromotive force value of the standard battery for transition, or
Other instruments output voltage values that are characteristic of standard battery emf values:
The substitution method is a different-time comparison method: The working parameters of a measurement system are determined by the known measured value, and the working parameters are maintained:
The parameters do not change, the known measured value is replaced by the unknown measured value, and the data related to the measurement result are obtained from the measurement system:
According to the measurement method: The difference substitution method refers to the measurement method that substitutes for each other in the substitution method and is measured as a difference:
When the difference substitution method is used for measurement, the number of measured objects is large, and the measurement duration is long:
The working parameters will change with time, and this change is mainly linear: In order to eliminate the linear variation brought by the system
Error, all the measured objects participating in the measurement are measured twice isochronously in chronological order, the first time is measured in positive order, and the second time is measured
The measurement is carried out in reverse order twice, and the average value of the two measurement data of each measured is used as the basis for calculating the measurement results:
It is known that this measurement method is called the closed-loop symmetric observation method:
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJG 719-2021_English be delivered?Answer: Upon your order, we will start to translate JJG 719-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JJG 719-2021_English with my colleagues?Answer: Yes. The purchased PDF of JJG 719-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version JJG 719-2021?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JJG 719-2021 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|