US$299.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. JJF 1607-2016: Prerequisites for Examination of the Manufacture Metrological Appliance Certificate of Withstanding Voltage Testers Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
JJF 1607-2016 | English | 299 |
Add to Cart
|
3 days [Need to translate]
|
Prerequisites for Examination of the Manufacture Metrological Appliance Certificate of Withstanding Voltage Testers
| Valid |
JJF 1607-2016
|
PDF similar to JJF 1607-2016
Basic data Standard ID | JJF 1607-2016 (JJF1607-2016) | Description (Translated English) | Prerequisites for Examination of the Manufacture Metrological Appliance Certificate of Withstanding Voltage Testers | Sector / Industry | Metrology & Measurement Industry Standard | Classification of Chinese Standard | A55 | Word Count Estimation | 13,153 | Date of Issue | 2016-11-30 | Date of Implementation | 2017-02-28 | Regulation (derived from) | State Administration of Quality Supervision, Inspection and Quarantine Notice No.119 of 2016 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine |
JJF 1607-2016: Prerequisites for Examination of the Manufacture Metrological Appliance Certificate of Withstanding Voltage Testers ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Prerequisites for examination of the Manufacture Metrological Appliance Certificate of Withstanding Voltage Testers
National Metrological Technical Code of the People's Republic of China
Withstand voltage tester
Prerequisites for the production of measurement instruments
Prerequisites for ExaminationoftheManufactureMetrologicalAppliance
Certificate ofWithstandingVoltageTesters
2016-11-30 release
2017-02-28 Implementation
State Administration of Quality Supervision, Inspection and Quarantine issued
The withstand voltage tester manufactures the measuring instrument
Permission to prerequisites
Prerequisites for ExaminationoftheManufacture
eTesters
Unit. National Electromagnetic Metrology Technical Committee
The main drafting unit. Shandong Institute of Metrology
China Institute of Metrology
Participated in the drafting unit. Qingdao Institute of Metrology and Technology
Social justice in Shandong Province
Tai'an Metrology and Testing Institute
This specification entrusts the National Electromagnetic Metrology Technical Committee to explain.
The main drafters of this specification.
Ma Xuefeng (Shandong Institute of Metrology)
Li Wenqiang (Shandong Institute of Metrology)
Liang Bo (China Institute of Metrology)
Participate in the drafters.
Tube Ze Xin (Shandong Institute of Metrology)
Jingjun (Qingdao Metrology Technology Research Institute)
Zhao Yan (Shandong Province social justice measurement line)
Li Dongqing (Tai'an Metrology and Testing Institute)
table of Contents
Introduction (II)
1 Scope of application (1)
2 References (1)
3 production facilities (1)
3.1 General (1)
3.2 Production equipment (1)
3.3 Process equipment (2)
3.4 Testing equipment (2)
4 Inspection conditions (3)
4.1 Factory inspection sites and environmental conditions (3)
4.2 inspectors (3)
4.3 Factory inspection basis (3)
4.4 Factory inspection equipment (4)
5 technical staff (4)
6 Safety requirements (5)
7 Other requirements (5)
7.1 Factory area (5)
7.2 Plant Ownership and Use Rights (5)
Appendix A Checklist (6)
Introduction
This specification is based on the requirements of Appendix J of the JJF 1246-2010 General Standard for Licensing of Manufacturing Metrology Instruments
To develop.
In order to standardize the withstand voltage tester manufacturing measurement equipment licensing assessment work to ensure that the assessment of scientific, objective,
Fair, impartial and effective, according to "manufacturing, repair measurement equipment licensing supervision and management approach" and "measuring instruments new
Product management approach "and other measurement regulations, the development of the assessment norms.
This specification to JJG795 "withstand voltage tester", JJF 1378-2012 "withstand voltage tester type evaluation of large
And GB/T 32192-2015 "withstand voltage tester" for the technical basis for the development.
This specification is the first release.
Withstand voltage tester
Prerequisites for the production of measurement instruments
1 Scope of application
This specification applies to the production of the output voltage does not exceed 15kV withstand voltage tester (hereinafter referred to as pressure meter) enterprises
Industry manufacturing measurement equipment licensing assessment, after the expiration of the review and daily supervision and inspection.
2 reference file
This specification refers to the following documents.
JJG795 withstand voltage tester
JJF 1378 withstand voltage tester type evaluation outline
GB/T 32192 withstand voltage tester
For dated references, only the dated edition applies to this specification; references that are not dated
, The latest version (including all modifications) applies to this specification.
3 production facilities
3.1 General
Production facilities include production equipment, process equipment (including mold) and testing equipment in three parts.
3.1.1 Production facilities must be in good condition.
3.1.2 The enterprise shall establish a measurement equipment cycle test/calibration schedule in the production facility. Testing equipment should be a symbol
Confirmation of conformity to meet the required certificate or calibration certificate, and indicate the status of the verification or calibration confirmation status.
3.1.3 Production facilities should have management desk (or list), should be used and regularly maintained, the main equipment of the
Use and maintenance to be recorded.
3.2 Production equipment
3.2.1 enterprises should have the appropriate production equipment, equipment, type, quantity, accuracy and performance should be with the production capacity
And process to adapt.
3.2.2 key parts of the Association of processing, should have. external agreement for the supplier survey or evaluation report, the Association for processing procurement
Contract, the Association of qualified qualifications, the supplier's regular performance evaluation. The contents of the contract should clearly specify the quality and technical requirements
begging. Enterprises should enter the factory inspection system and related into the factory inspection equipment; should be stored into the factory quality acceptance records, the number of records
Quantity should be consistent with the number of production and storage.
Should be equipped with the main production equipment in Table 1.
Table 1 Major production equipment
No. Equipment Name Technical Requirement Remarks
1 production assembly line
2 wave soldering machine (or dip welding furnace)/circuit board outside the processing except
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJF 1607-2016_English be delivered?Answer: Upon your order, we will start to translate JJF 1607-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JJF 1607-2016_English with my colleagues?Answer: Yes. The purchased PDF of JJF 1607-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|