HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

JJF 1434-2013 English PDF

US$349.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
JJF 1434-2013: Examination Specification for China Metrological Certificate. Heat Meters
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
JJF 1434-2013English349 Add to Cart 3 days [Need to translate] Examination Specification for China Metrological Certificate. Heat Meters Valid JJF 1434-2013

Standard similar to JJF 1434-2013

JJF 1033   JJF 1050   JJF 1030   

Basic data

Standard ID JJF 1434-2013 (JJF1434-2013)
Description (Translated English) Examination Specification for China Metrological Certificate. Heat Meters
Sector / Industry Metrology & Measurement Industry Standard
Word Count Estimation 15,183
Quoted Standard JJF 225; GB/T 26831; CJ 128-2007
Regulation (derived from) AQSIQ Notice No. 154 of 2013
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine
Summary This standard applies to: The calorimeter (heat meters, hereinafter referred to as heat meters) manufacturer measurement equipment manufacturing license examination, after the expiration date Review and daily supervision and inspection.

JJF 1434-2013: Examination Specification for China Metrological Certificate. Heat Meters

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Examination Specification for China Metrological Certificate.Heat Meters People's Republic of China National Metrology Technical Specifications Heat Meter (thermal table) Measurement equipment manufacturing license examination Prerequisites HeatMeters Issued on. 2013-10-25 2014-01-25 implementation The State Administration of Quality Supervision, Inspection and Quarantine released Heat Meter (thermal table) Measurement equipment manufacturing license examination Prerequisites HeatMeters Instead of "Heat Meter Manufacturing Measuring instruments permit Examination Prerequisites " Focal point. the National Technical Committee on Metering flow capacity The main drafting units. China Institute of Metrology Beijing Institute of Metrology detection Tianjin Institute of Supervision and Testing Weighing Participated in the drafting unit. Henan Institute of Metrology Maxtor Intelligent Instrument Co., Ltd., Jiangsu Weihai Plough Instrument Co., Ltd. Tangshan Huizhong Instrumentation Co., Ltd. This specification flow capacity commissioned the National Technical Committee responsible for the interpretation of measurement The main drafters of this specification. Jin Zhijun (China Institute of Metrology) Wang Yiwei (Beijing Institute of Metrology detection) Liu Wei (Tianjin Supervision and Testing Institute of Metrology) Drafters participate. Zhu Yonghong (Henan Institute of Metrology) Sun Weiguo (Jiangsu Maxtor Intelligent Instrument Co., Ltd.) Fu Tao (Weihai Plough Instrumentation Co., Ltd.) King forever (Tangshan Huizhong Instrumentation Co., Ltd.)

table of Contents

Introduction (Ⅱ) 1 Scope (1) 2. References (1) 3 production facilities (1) 3.1 General (1) 3.2 production equipment, process equipment and testing equipment (1) 4 Test conditions (3) 4.1 factory inspection accommodation and environmental conditions (3) 4.2 inspectors (3) 4.3 factory inspection equipment (3) 5 technical staff (5) Safety Requirements 6 (5) 7 Other requirements (6) 7.1 Plant area (6) 7.2 Plant ownership and use (6) Appendix A assessment record sheet (7)

Introduction

In order to regulate heat meters (heat meters) measurement equipment manufacturing license assessment work to ensure that scientific assessment work, passenger Concept, fairness, impartiality and effectiveness, according to "manufacture and repair of measuring instruments license supervision and management measures" and "Meter A new product management approach "metrology regulations, development of this specification. This specification is JJG225 "heat meter", CJ128-2007 "heat meter" as the technical basis, combined with China's hot Production status scale industry, the amount of the national quality inspection letter [2008] No. 556 "heat meter measurement equipment manufacturing license examination Prerequisites "file revision. This specification refers to the heat meter to measure and display the heat transfer fluid through the heat exchange equipment Absorb or release heat energy in the heat meter, cold Scale and cold (hot) scale. For heat meters for heat measurement, heat Table, this specification deemed equivalent meaning. This specification applies to heat meters, the company measurement equipment manufacturing license examination, Review and daily supervision and inspection after the expiration, is JJF 1246-2010 "measurement equipment manufacturing license through examination Specifications for "complement relevant content. Heat Meter (thermal table) Measurement equipment manufacturing license examination Prerequisites

1 Scope

This specification applies to heat meters (heat meters, hereinafter referred to as heat meters) manufacturers of measurement equipment manufacturing license Assessment, review and daily supervision and inspection after the expiration. 2. References This specification refers to the following documents. JJG225 Heat Meter GB/T 26831 Collecting Community Energy Metering System Specification CJ128-2007 Calorimeter Note. For dated references, only the dated edition applies to this specification; undated reference documents, the most The new version (including any amendments) applies to this specification.

3 production facilities

3.1 General Production facilities including production equipment, process equipment and testing equipment in three parts. 3.1.1 production and processing enterprises own all or part of the key components (flow sensor, temperature sensor pair, namely, Operators, etc.) should have the appropriate type, quantity, accuracy and performance of production equipment, facilities and production capacity and should be Adapt technology; equipment should ledger, maintenance records. 3.1.2 Key components to design and contract manufacturing, audited drawing control physical confirmation, regarded himself Production, but it should be. a party survey or evaluation report for the Association to have regular procurement contracts for outsourcing, supply-side Performance evaluation. Content should be clearly defined quality and technical requirements, should the incoming inspection system and related test equipment; Should be saved into the factory quality inspection records, the number of records should be produced, the number of storage match. 3.1.3 key parts of their own processing and contract manufacturing companies must have the appropriate quality control documents and all Step implementation of quality testing data is recorded. 3.1.4 key components (flow sensor, temperature sensor pair, the calculator) non-self-design, only full group Installation and make the factory inspection company, considered to not have the production conditions. Production or outsourcing their situation should type evaluation report 3.1.5 Calorimeter key components in the "List of key components Table "agreement, but need to provide drawings of all components. 3.2 production equipment, process equipment and testing equipment 3.2.1 Production Equipment The key parts all or part of their own production and processing enterprises, listed in Table 1 should be equipped with the appropriate equipment.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of JJF 1434-2013_English be delivered?

Answer: Upon your order, we will start to translate JJF 1434-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of JJF 1434-2013_English with my colleagues?

Answer: Yes. The purchased PDF of JJF 1434-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.