US$329.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. JJF 1398-2013: Examination Specification for China Metrology Certification. Fuel Dispensers Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
JJF 1398-2013 | English | 329 |
Add to Cart
|
3 days [Need to translate]
|
Examination Specification for China Metrology Certification. Fuel Dispensers
| Valid |
JJF 1398-2013
|
PDF similar to JJF 1398-2013
Basic data Standard ID | JJF 1398-2013 (JJF1398-2013) | Description (Translated English) | Examination Specification for China Metrology Certification. Fuel Dispensers | Sector / Industry | Metrology & Measurement Industry Standard | Classification of Chinese Standard | A53 | Classification of International Standard | 17.120 | Word Count Estimation | 14,110 | Older Standard (superseded by this standard) | JJF 1061-1999 | Quoted Standard | JJG 443; GB/T 9081 | Regulation (derived from) | ?State AQSIQ Announcement 2013 No. 28 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine | Summary | This standard applies to the manufacture of the fuel tanker manufacturer of measuring instruments necessary conditions of production license examination, review and daily supervision and inspection after the expiration date. |
JJF 1398-2013: Examination Specification for China Metrology Certification. Fuel Dispensers---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Examination Specification for China Metrology Certification.Fuel Dispensers
People's Republic of China National Metrology Technical Specifications
Fuel tanker measurement equipment manufacturing license
Examination Prerequisites
Issued on. 2013-02-16
2013-08-16 implementation
The State Administration of Quality Supervision, Inspection and Quarantine released
Fuel tanker measurement equipment manufacturing license
Examination Prerequisites
ensers
Replacing JJF 1061-1999
Focal point. the National Technical Committee on Metering flow capacity
Main drafting unit. Beijing Institute of Metrology detection
Guangdong Provincial Institute of Metrology
Zhejiang Institute of Metrology
Participated in the drafting unit. Beijing three joint surplus oil Technology Co., Ltd.
N Star Technology Co., Ltd.
This specification flow capacity commissioned the National Technical Committee responsible for the interpretation of measurement
The main drafters of this specification.
Yang Jing (Beijing Institute of Metrology detection)
Wuwei Long (Guangdong Institute of Metrology)
Zhan Zhijie (Zhejiang Institute of Metrology)
Drafters participate.
JI Peng (Beijing three joint surplus oil Technology Co., Ltd.)
Li (n-Star Technology Co., Ltd.)
table of Contents
Introduction (Ⅱ)
1 Scope (1)
2. References (1)
3 production facilities (1)
3.1 Production equipment (1)
3.2 technology and equipment and molds (2)
3.3 testing equipment (2)
4 Fuel tanker factory inspection requirements (3)
4.1 test site and environmental conditions (3)
4.2 factory inspection staff (3)
4.3 Test basis (3)
4.4 machine testing equipment (4)
5 technical staff (4)
Safety Requirements 6 (4)
7 Other requirements (5)
7.1 production sites (5)
7.2 Plant ownership and use (5)
7.3 Subcontractor Requirements (5)
7.4 measuring and testing equipment management (5)
Appendix A assessment record sheet (6)
Introduction
In order to regulate the fuel tanker measurement equipment manufacturing license assessment work to ensure that the assessment work of scientific, objective, public
Flat, impartiality and effectiveness, according to "manufacture and repair of measuring instruments license supervision and management measures" and "new production of measuring instruments
Product management approach "and other measurement regulations, the development of the assessment specification.
In the present specification JJG443 "fuel tanker", GB/T 9081 "motor vehicle fuel tanker" as the technical basis for system
Set is a supplement to JJF 1246-2010 "measurement equipment manufacturing license examination universal norms" on the contents.
"Fuel tanker measurement equipment manufacturing license examination Prerequisites" of previously issued as follows.
The assessment specification instead of JJF 1061-1999 "Fuel Dispensers manufacturing license assessment norms."
Fuel tanker measurement equipment manufacturing license
Examination Prerequisites
1 Scope
This instruction applies to fuel tanker manufacturer of measurement equipment manufacturing license necessary production conditions assessment, effective
Review and daily supervision and inspection after the expiration of the period.
2. References
This specification refers to the following documents.
JJG443 fuel tanker
GB/T 9081 motor vehicle fuel tanker
Note. For dated references, only the dated edition applies to this specification; undated reference documents, the most
The new version (including any amendments) applies to this specification.
3 production facilities
Production facilities include production requirements of equipment, process equipment and tooling and testing equipment three parts.
3.1 Production Equipment
The type of equipment used in the production, quantity, performance and production should adapt, the company born of the enterprise in accordance with
Production methods with production equipment. Production equipment should be in good condition and stable performance. The key parts all or part of their own students
Production and processing enterprises, listed in Table 1 should be equipped with the appropriate equipment.
Table 1 key components and production equipment
No. Name key components related equipment device uses Remarks
1 chassis and piping
Chassis and pipeline processing
equipment
Chassis and pipeline processing
Such as bending machines, shears,
Presses, punching, bending machine,
Welding equipment
2 Flow Transmitters
Flow Measurement Converter
Manufacturing Equipment
Flow Measurement Converter
manufacture
Such as machine tools (lathes,
Drilling, tapping) or implement
More functional processing center,
And grinding equipment, pressure mounted
Equipment, etc.
3 pumps (including oil and gas separation)
Pumps (including oil and gas separation)
Manufacturing Equipment
Pumps (including oil and gas separation)
manufacture
Such as machine tools (lathes,
Milling, drilling) or to achieve
Machining center functions to
And tapping machines, pressure mounted equipment,
Cylindrical grinder, etc.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJF 1398-2013_English be delivered?Answer: Upon your order, we will start to translate JJF 1398-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JJF 1398-2013_English with my colleagues?Answer: Yes. The purchased PDF of JJF 1398-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|