HOME   Cart(1)   Quotation   About-Us Tax PDFs Standard-List
Powered by Google-Search & Google-Books www.ChineseStandard.net Database: 189760 (2 Jul 2022)

JJF 1112-2003

JJF 1112-2003_English: PDF (JJF1112-2003)
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)Related StandardStatusPDF
JJF 1112-2003English1109 Add to Cart 7 days Rules for confirmation of metrology testing system JJF 1112-2003 Valid JJF 1112-2003

BASIC DATA
Standard ID JJF 1112-2003 (JJF1112-2003)
Description (Translated English) Rules for confirmation of metrology testing system
Sector / Industry Metrology & Measurement Industry Standard
Classification of Chinese Standard A50
Word Count Estimation 44,428
Date of Issue 2003-12-26
Date of Implementation 2004-04-01
Quoted Standard GB/T 19000-2000; GB/T 19022-2003; GB/T 19011-2003; JJF 1001-1998
Drafting Organization Jiangsu Province Quality and Technical Supervision
Administrative Organization National Measurement Technical Committee of Legal Metrology Management
Issuing agency(ies) State Administration of Quality Supervision, Inspection and Quarantine
Summary This standard specifies the requirements and validation methods to confirm measurement detection system.

JJF 1112-2003
Rules for confirmation of metrology testing system
National Metrology Technical Specification of the People's Republic
Measurement and inspection system confirmation specification
Released on.2003-12-26
2004-04-01 implementation
The General Administration of Quality Supervision, Inspection and Quarantine issued
Measurement and inspection system confirmation specification
Stem
This specification was approved by the General Administration of Quality Supervision, Inspection and Quarantine on December 26,.2003, and
It will take effect on April 1,.2004.
Focal Point. National Legal Metrology Management Metrology Technical Committee
Main drafting unit. Jiangsu Provincial Bureau of Quality and Technical Supervision
China Metrology and Testing Society
National Quality Supervision, Inspection and Quarantine Bureau of Metrology
Participated in drafting unit. Jiangsu Metrology Association
This specification entrusts the focal point to be responsible for interpretation
The main drafters of this specification.
Huang Yaowen (Jiangsu Provincial Bureau of Quality and Technical Supervision)
Zhao Ruojiang (China Metrology and Testing Society)
Wang Shun'an (Measurement Department of the General Administration of Quality Supervision, Inspection and Quarantine)
Participate in the drafters.
He Xihuan (Jiangsu Provincial Bureau of Quality and Technical Supervision)
Han Youdao (Jiangsu Province Metrology Association)
table of Contents
Introduction (1)
1 range (2)
1.1 General (2)
1.2 Application (2)
2 Citations (2)
3 definition (2)
The first part confirms the requirement (4)
4 Measurement and legal requirements (4)
4.1 General (4)
4.2 Unit of measurement (4)
4.3 Measurement staff (5)
4.4 Measurement Standards (5)
4.5 Mandatory verification (5)
4.6 Specific requirements (5)
5 Technical ability requirements (5)
5.1 General (5)
5.2 Detection capability (5)
5.3 Detection level (5)
6 Quality Management Requirements (5)
6.1 General requirements (5)
6.2 Management Responsibilities (6)
6.3 Resource Management (6)
6.4 Implementation of measurement confirmation and measurement process (7)
6.5 System Analysis and Improvement (9)
The second part of the confirmation method (11)
7 Confirmation Principles (11)
7.1 General (11)
7.2 Principles to be followed by the assessor (11)
7.3 Principles to be followed in the validation process (12)
8 Confirmation Management (12)
8.1 General (12)
8.2 Management Responsibilities (12)
8.3 Management Program (12)
8.4 Management Records (13)
8.5 Management Monitoring and Review (13)
9 Confirmation activities (13)
9.1 General (13)
9.2 Confirmed Startup (13)
9.3 Document Review (15)
9.4 Preparation before on-site confirmation (16)
9.5 Implementation site confirmation (17)
9.6 Confirmation of the preparation, approval and distribution of reports (19)
9.7 Implementation confirmation follow-up activities (20)
9.8 Supervision after confirmation (20)
10 Appraisers (20)
10.1 General (20)
10.2 Personal qualities (21)
10.3 Knowledge and Skills (21)
10.4 Education, experience, training and validation experience (23)
10.5 Ability to maintain and improve (23)
10.6 Evaluation of Evaluation Staff (23)
Appendix A Schematic diagram of measurement equipment measurement confirmation process (25)
Appendix B Measurement and Inspection System Confirmation Application Form (26)
Appendix C Confirmation of Specification Requirements and System Documents Checklist (28)
Appendix D Calibration and Calibration Item Checklist (30)
Appendix E Measurement Process Control Item Checklist (31)
Appendix F Non-conformance Report Format (32)
Appendix G Measurement and Inspection System Confirmation Report Format (33)
Appendix H JJF 1112-2003 confirmation requirements are compared with the provisions of GB/T 19022-2003 (38)
Measurement and inspection system confirmation specification
introduction
An effective measurement and inspection system is part of the