US$1129.00 · In stock Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email. JJF 1112-2003: Rules for confirmation of metrology testing system Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
JJF 1112-2003 | English | 1129 |
Add to Cart
|
7 days [Need to translate]
|
Rules for confirmation of metrology testing system
| Valid |
JJF 1112-2003
|
PDF similar to JJF 1112-2003
Basic data Standard ID | JJF 1112-2003 (JJF1112-2003) | Description (Translated English) | Rules for confirmation of metrology testing system | Sector / Industry | Metrology & Measurement Industry Standard | Classification of Chinese Standard | A50 | Word Count Estimation | 44,481 | Date of Issue | 2003-12-26 | Date of Implementation | 2004-04-01 | Quoted Standard | GB/T 19000-2000; GB/T 19022-2003; GB/T 19011-2003; JJF 1001-1998 | Issuing agency(ies) | State Administration of Quality Supervision, Inspection and Quarantine | Summary | This standard specifies the requirements and validation methods to confirm measurement detection system. |
JJF 1112-2003: Rules for confirmation of metrology testing system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Rules for confirmation of metrology testing system
National Metrology Technical Specification of the People's Republic
Measurement and inspection system confirmation specification
Released on.2003-12-26
2004-04-01 implementation
The General Administration of Quality Supervision, Inspection and Quarantine issued
Measurement and inspection system confirmation specification
Stem
This specification was approved by the General Administration of Quality Supervision, Inspection and Quarantine on December 26,.2003, and
It will take effect on April 1,.2004.
Focal Point. National Legal Metrology Management Metrology Technical Committee
Main drafting unit. Jiangsu Provincial Bureau of Quality and Technical Supervision
China Metrology and Testing Society
National Quality Supervision, Inspection and Quarantine Bureau of Metrology
Participated in drafting unit. Jiangsu Metrology Association
This specification entrusts the focal point to be responsible for interpretation
The main drafters of this specification.
Huang Yaowen (Jiangsu Provincial Bureau of Quality and Technical Supervision)
Zhao Ruojiang (China Metrology and Testing Society)
Wang Shun'an (Measurement Department of the General Administration of Quality Supervision, Inspection and Quarantine)
Participate in the drafters.
He Xihuan (Jiangsu Provincial Bureau of Quality and Technical Supervision)
Han Youdao (Jiangsu Province Metrology Association)
table of Contents
Introduction (1)
1 Scope (2)
1.1 General (2)
1.2 Application (2)
2 Citations (2)
3 definition (2)
The first part confirms the requirement (4)
4 Measurement and legal requirements (4)
4.1 General (4)
4.2 Unit of measurement (4)
4.3 Measurement staff (5)
4.4 Measurement Standards (5)
4.5 Mandatory verification (5)
4.6 Specific requirements (5)
5 Technical ability requirements (5)
5.1 General (5)
5.2 Detection capability (5)
5.3 Detection level (5)
6 Quality Management Requirements (5)
6.1 General requirements (5)
6.2 Management Responsibilities (6)
6.3 Resource Management (6)
6.4 Implementation of measurement confirmation and measurement process (7)
6.5 System Analysis and Improvement (9)
The second part of the confirmation method (11)
7 Confirmation Principles (11)
7.1 General (11)
7.2 Principles to be followed by the assessor (11)
7.3 Principles to be followed in the validation process (12)
8 Confirmation Management (12)
8.1 General (12)
8.2 Management Responsibilities (12)
8.3 Management Program (12)
8.4 Management Records (13)
8.5 Management Monitoring and Review (13)
9 Confirmation activities (13)
9.1 General (13)
9.2 Confirmed Startup (13)
9.3 Document Review (15)
9.4 Preparation before on-site confirmation (16)
9.5 Implementation site confirmation (17)
9.6 Confirmation of the preparation, approval and distribution of reports (19)
9.7 Implementation confirmation follow-up activities (20)
9.8 Supervision after confirmation (20)
10 Appraisers (20)
10.1 General (20)
10.2 Personal qualities (21)
10.3 Knowledge and Skills (21)
10.4 Education, experience, training and validation experience (23)
10.5 Ability to maintain and improve (23)
10.6 Evaluation of Evaluation Staff (23)
Appendix A Schematic diagram of measurement equipment measurement confirmation process (25)
Appendix B Measurement and Inspection System Confirmation Application Form (26)
Appendix C Confirmation of Specification Requirements and System Documents Checklist (28)
Appendix D Calibration and Calibration Item Checklist (30)
Appendix E Measurement Process Control Item Checklist (31)
Appendix F Non-conformance Report Format (32)
Appendix G Measurement and Inspection System Confirmation Report Format (33)
Appendix H JJF 1112-2003 confirmation requirements are compared with the provisions of GB/T 19022-2003 (38)
Measurement and inspection system confirmation specification
Introduction
An effective measurement and inspection system is part of the organization's entire management system, which guarantees measurement equipment and measurements.
The process meets the measurement requirements of customers, organizations and laws and regulations. It enhances customer satisfaction, achieves organizational goals, and improves
Product quality and economic benefits, and the risk of managing incorrect measurement results are important. The goal of the measurement and testing system is to
To have the ability to measure and control the production and operation of the organization, and to manage the measurement equipment and the measurement process,
Risk of incorrect measurement results affecting the quality of the organization's products, environmental protection, safe production and economic benefits.
The organization is responsible for specifying the requirements of the measurement and testing system and the degree of control required as part of its overall management system.
Minute.
In this specification, the term “measurement procedure” applies to metrological verification, calibration and actual measurement activities (eg products)
Design, production, testing and inspection; business management, energy management, safety protection and
Activities such as environmental monitoring).
This specification can be cited in the following cases.
---Customer when specifying the required product;
--- When organizing the products provided;
--- When legislative and law enforcement agencies have requirements;
--- Confirm and review the measurement and testing system.
This specification includes two parts. the confirmation requirements and the confirmation methods of the measurement and testing system.
Chapters 4 through 6 of this specification are the first part, and the requirements for the verification of measurement and inspection systems are proposed. Confirmation requirements include
Three aspects of measurement and legal requirements, technical capability requirements and quality management requirements.
The confirmation requirements cover the measurement process of GB/T 19022-2003/ISO 10012.2003
And the requirements of the requirements of the measuring equipment, all the requirements of the standard, meet the requirements of this specification, but also meet the requirements of the standard.
Appendix H provides a comparison between the validation requirements of this specification and the provisions of GB/T 19022-2003.
Chapter 4 is “Metrics Requirements for Measurement and Regulation”, including the “Measures of the People’s Republic of China” and related regulations and regulations.
Chapter on the requirements of the organization.
Chapter 5 is the “Technical Competency Requirements”, which stipulates the scope and detection of the detection capability of the metrological inspection system.
The level should be compatible with the requirements of the organization's production management and other activities.
Chapter 6 is “Quality Management Requirements” and includes GB/T 19022-2003/ISO 10012.2003 “Measurement Management”
Requirements for System Measurement Processes and Measurement Equipment, Chapters 4 through 8. The standard specifies that the measurement has been
The general requirements for the measurement and verification of measurement and measurement equipment, ie the quality management requirements of the measurement management system, for support and
Prove that the measurement requirements are met. One of the management principles articulated by the standard is to emphasize the process approach.
In this specification, the measurement management system requirements are one of the components of the metrological inspection system validation requirements. therefore,
In the “Quality Management Requirements” of Chapter 6 of this Code, the “Measurement Management System” is renamed as “Metrics Testing System”.
Referred to as "system." At the same time, in order to maintain the consistency of the format of this specification, this specification refers to GB/T 19022-2003/
The requirements section of the ISO 10012.2003 standard.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJF 1112-2003_English be delivered?Answer: Upon your order, we will start to translate JJF 1112-2003_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JJF 1112-2003_English with my colleagues?Answer: Yes. The purchased PDF of JJF 1112-2003_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|